Permit Information
Permit NumberBLD08-02067
StatusFinaled
Name SAUCERMAN CONSTRUCTION
Site Address 1253 N COLE RD
Project NameREDMONT OUTPATIENT SER
Customer Number 
ePlanReviewNo
Description
(REDMONT OUTPATIENT) Remodel of 4,675 sq. ft. portion of existing 10,412 sq. ft. building to create a tenant space for Redmont Outpatient Services. Work includes select areas of interior demolition in preparation for new construction. New construction includes interior non-bearing walls to create this tenant space, five private offices, three conference rooms, a break room, accessible restrooms, waiting / reception and support areas, non-rated corridor and new exterior exit doors to serve the large conference room and adjoining areas. The large conference room, #115, is classified as an 'A3' occupancy due to occupant load greater than 50. Additions of two exterior exit doors, landings, clear floor space and hardware per 2006 IBC. Work includes upgrade of electrical, plumbing, mechanical, sprinkler and alarm system to meet tenant needs and for code compliance. Bi-level switching is provided in newly created rooms for energy code compliance. Hi-lo accessible drinking fountains, a service sink and specimen sampling / testing restroom facility are provided. This building is fully sprinklered for allowable area increase based on 1991 UBC, code at time of construction. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD3/3/20093/3/20098/10/2009 DONE
DetailsPatricia Smith
First Notice has not been responded to.
First Notice 1/23/20093/3/2009 DONE
BLD-Final1/22/20091/23/20091/23/2009PPASS
DetailsMike Jordan
Please contact Rich Wilson on your way to inspection. Thanks! Phone #: ###-#### Internet Inspection Request from: Greg Hayes. ok for perm occ.
FIRE-Final Inspection1/22/20091/23/20091/23/2009APART
DetailsTroy Cobbley
Life safety passed
Permanent Occupancy  1/23/2009 DONE
DetailsBarbara Stitt
BLD-Final1/21/20091/22/20091/22/2009ANR
DetailsMike Jordan
Please contact Rich on your way to site for appointment. Thanks! Phone #: ###-#### Internet Inspection Request from: Greg Hayes. Still needs fire/life/safety finals.
FIRE-Final Inspection1/21/20091/21/20091/21/2009PFAIL
DetailsTroy Cobbley
The life safety can be passed when the project related fire alarm and fire sprinkler permits are finaled
BLD-Wall cover12/24/200812/24/200812/24/2008PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 12/24/2008 at 8:40:12 AM. Contact: ###-####. Ceiling grid ok.
BLD-Wall cover11/19/200811/19/200811/19/2008PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 11/19/2008 at 9:08:14 AM. interior wood framed walls ok. no grid.
PLANS/APPL TAKEN TO FRONT DESK  10/31/2008 PASS
Print Occupancy Form  10/31/2008 DONE
Details
Telephone call  10/31/2008 DONE
DetailsAlexandra L. DeYoung
LM for Kelly with Patrick, permit ready, fees given
Permit Ready to Issue  10/31/2008 DONE
DetailsAlexandra L. DeYoung
Print Pending Permit.LaserJet4  10/31/2008  
Issue PAID IN FULL permit  10/31/2008 DONE
DetailsAlexandra L. DeYoung
Plan assigned to (DRS)9/29/2008 10/31/2008 PASS
DetailsDan Stuart
10/31/2008 07:54:45 DRS - activity updated through activity BLDA022 from case BLD08-02067.
Routing - PLAN CHECK10/30/2008 10/31/2008 PASS
DetailsDan Stuart
Resubmittals inserted into plans. Plans to permit desk to issue.
Routing - FIRE10/27/200810/27/200810/30/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
Plan resubmittals received  10/30/2008  
DetailsDan Stuart
Rec'd one response letter, and 2 copies of sheets T1.0, A1.1, A1.2, A2.1; taken to Dan Stuart
1st review completed  10/30/2008 FAIL
Failed Plan Check
Route to Impact Fee Review10/27/200810/30/200810/29/2008 PASS
DetailsCindy M. Gould
Tenant improvements no impact fees
Plan resubmittals requested  10/27/2008 DONE
Plan review items requiring resubmittals were e-mailed to architect.
Print Pending Permit.LaserJet4  10/27/2008  
Case Summary (BLD)  10/27/2008  
Routing - PLAN CHECK10/7/2008 10/27/2008 FAIL
DetailsDan Stuart
Resubmittals required. Copy of plan review e-mailed to architect for response. Routing plans to fire code analyst for review.
Routing - PLUMBING10/1/2008 10/7/2008 PASS
DetailsBill VanDegrift
per plans and 2003 upc
Routing - Erosion and Sediment10/1/2008 10/1/2008 PASS
DetailsSteven Webb
ESC plan waiver approved with attached conditions. ESC08-00839
Routing - PUBLIC WORKS9/29/2008 10/1/2008 PASS
DetailsBeverly Hall
Pending Assignment by JCB9/24/2008 9/29/2008 DONE
DetailsJason Blais
Plan Reviewer's activity  9/29/2008 DONE
DetailsJason Blais
Received Erosion & Sediment Control Application and Waiver Letter.
Telephone call  9/26/2008 DONE
DetailsJason Blais
Called Pat McKeegan to have him provide an Erosion & Sediment Control application and waiver request letter for the saw cutting of the slab.
Application received 9/24/20089/24/2008 DONE
DetailsAlexandra L. DeYoung
Plans ACCEPTED BY PLAN TECH  9/24/2008 DONE
DetailsAlexandra L. DeYoung
Recd Pcfee & Taken To Pln CK  9/24/2008 DONE
DetailsAlexandra L. DeYoung