Third Notice | | 12/30/2009 | 1/13/2010 | | DONE |
|
|
|
|
Telephone call | | | 1/13/2010 | | DONE |
Tisha Gallop
|
|
|
called and left vm for Jeff Vennandahl still need FV; also e-mailed him
|
Third Notice | | 12/9/2009 | 12/16/2009 | | DONE |
|
|
|
faxed, mailed and called
|
Telephone call | | | 12/16/2009 | | DONE |
Tisha Gallop
|
|
|
called and left vm in Jeff V./Epstein Const. mailbox that need fv
|
Third Notice | | 11/9/2009 | 11/25/2009 | | DONE |
|
|
|
10/9/09 - pushed out notice date to wait for shell permit to be finaled so can do the final values for both project together. Will review in 1 month.//11/25/09 faxed request for final value
|
Second Notice | | 9/27/2009 | 9/29/2009 | | DONE |
|
|
|
|
First Notice | 9/10/2009 | 9/10/2009 | 9/17/2009 | | DONE |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 9/9/2009 | 9/10/2009 | 9/10/2009 | A | PART |
Forrest France
|
|
|
George Phone #: ###-####
|
BLD-Final | 9/9/2009 | 9/10/2009 | 9/10/2009 | A | PASS |
Jim Storey
|
|
|
al Phone #: ###-####
|
DOC - Permit Finaled | 9/10/2009 | 9/10/2009 | 9/10/2009 | P | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 8/12/2009 | 8/12/2009 | 8/13/2009 | | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 6/12/2009 | 6/12/2009 | 6/12/2009 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Aging Inspection | 4/3/2009 | 4/3/2009 | 4/3/2009 | | PASS |
Jim Storey
|
|
|
wip pending si reports
|
BLD-Framing/Rough-in | 1/30/2009 | 1/30/2009 | 1/30/2009 | A | PART |
Jim Storey
|
|
|
reviewed si reports for framing and concrete. walked site reviewed welding si. dry goods area. hanger aplacation ok to nail per listing for jig aplacation si verifcation for sheathing nailling at hangers to comply.
|
BLD-Other | 12/11/2008 | 12/11/2008 | 12/11/2008 | P | PART |
Jim Storey
|
|
|
jean Note: rebar in tilt wall panel Phone #: ###-#### wip cold weather protection in place. si aproved.
|
BLD-Conference | 11/14/2008 | 11/14/2008 | 11/14/2008 | A | PART |
Jim Storey
|
|
|
|
CHANGE STATUS TO (RDY) | | | 10/2/2008 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/2/2008 | | |
|
|
|
|
Routing - PLAN CHECK | 10/1/2008 | | 10/1/2008 | | |
John Menard
|
|
|
|
Plan assigned to (JCM) | 10/1/2008 | | 10/1/2008 | | PASS |
John Menard
|
|
|
10/1/2008 13:56:59 JCM - activity updated through activity BLDA022 from case BLD08-02097.
|
Routing - FIRE | 10/1/2008 | | 10/1/2008 | | PASS |
Scott Arellano
|
|
|
No seperate IFC comments attached to plans. Temporary FD access roadways are being coordinated by the assistant Fire Marshal - Mark Senteno. Mark will be performing onsite inspections as construction phases progress. The BFD has agreed to allow foundation construction to begin with one operating fire hydrant located at the Northeast access of the project. Combustible materials will be allowed to be stored in an area not to exceed 100x150 feet at the North east area of the project. Temporary FD access roads shall be made available to combustible construction storage site and areas of building construction, as approved by Mark Senteno.
|
1st review completed | | | 10/1/2008 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 10/1/2008 | | 10/1/2008 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/1/2008 | | DONE |
John Menard
|
|
|
|
Inspection Record Card- Bld | | | 10/1/2008 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/30/2008 | | DONE |
|
|
|
Plans were given to me so I could route them to John M. plans did not have any paper work /application with them I checked with Angie B and she informed me there was no application /paper work. Stamped plans and routed them to John M.
|
Application received | | 9/29/2008 | 9/29/2008 | | DONE |
Darla L Downs
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/29/2008 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 9/29/2008 | | |
|
|
|
|