Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD08-02101
StatusFinaled
Name RMH COMPANY
Site Address 1161 W RIVER ST Unit: 340
Project NameUBS FINANCIAL - FOREST RIVER I
Customer Number 
ePlanReviewNo
Description
(UBS FINANCIAL - FOREST RIVER IX - STE#110) Permit to remodel existing tenant space and expand tenant into adjacent tenant space. Space will be used for offices and accessory uses. This use is defined as a B occupancy. Work to include: demolition of interior non-bearing wall identified on approved set of plans, installation of interior non-bearing walls to redefine offices, installation of new doors in specified locations w/ associated hardware, and installation of interior finishes in compliance with chapter 8 of the IBC. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 7/23/20098/6/2009 DONE
First Notice 2/25/20097/23/2009 DONE
BLD-Final2/24/20092/25/20092/25/2009APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/24/2009 at 1:38:23 PM. Contact: ###-####.
Permanent Occupancy  2/25/2009 DONE
DetailsTisha Gallop
BLD-Final2/23/20092/24/20092/24/2009PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/23/2009 at 12:57:26 PM. Contact: ###-####.ok for perm occ
FIRE-Final Inspection2/23/20092/24/20092/24/2009PPASS
DetailsTroy Cobbley
life safety passed
FIRE-Conference1/16/20091/20/20091/20/2009ADONE
DetailsForrest France
On site review regarding items needed for fire life safety final approval including missing door hardware (card reader etc.).
BLD-Wall cover1/7/20091/7/20091/7/2009PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/7/2009 at 7:20:37 AM. Contact: ###-####.
BLD-Wall cover12/17/200812/18/200812/18/2008APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/17/2008 at 2:08:38 PM. Contact: ###-####. phase 1 ok pending all others
FIRE-Conference12/17/200812/17/200812/17/2008PDONE
DetailsForrest France
Partial inspection completed for the NE remodel area only.
FIRE-Conference12/15/200812/16/200812/16/2008ADONE
DetailsForrest France
On site inspection regarding portions of permit work completed to date including fire sprinkler system modifications.
BLD-Wall cover11/26/200811/28/200811/28/2008APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/26/2008 at 11:38:42 AM. Contact: ###-####. duct supply and defusers wired ceilling ok to cover.
BLD-Framing/Rough-in10/30/200811/3/200811/3/2008APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/30/2008 at 2:11:53 PM. Contact: ###-####.
Issue PAID IN FULL permit  10/21/2008 DONE
Print Occupancy Form  10/13/2008 DONE
Telephone call  10/13/2008 DONE
Details
t/c w andrew davis at ###-#### - permit ready and fees given
Permit Ready to Issue  10/13/2008 DONE
Details
Route to Impact Fee Review10/10/200810/15/200810/10/2008 PASS
DetailsCindy M. Gould
Tenant improvement no impact fees
Routing - FIRE10/10/200810/10/200810/10/2008 PASS
DetailsTim L. Woodard
Field verify all fire code requriements.
Routing - PLAN CHECK9/29/2008 10/10/2008 PASS
DetailsTim L. Woodard
Approved per plans and plan review report.
1st review completed  10/10/2008 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  10/10/2008 DONE
Case Summary (BLD)  10/10/2008 DONE
Plan assigned to (TLW)  10/2/2008 PASS
DetailsTim L. Woodard
10/2/2008 11:12:27 TLW - activity updated through activity BLDA022 from case BLD08-02104.
Routing - PUBLIC WORKS9/29/2008 9/29/2008 PASS
DetailsBeverly Hall
Plans ACCEPTED BY PLAN TECH  9/29/2008 DONE
DetailsAlexandra L. DeYoung
Recd Pcfee & Taken To Pln CK  9/29/2008 DONE
DetailsAlexandra L. DeYoung
Application received 9/29/2008   
DetailsAlexandra L. DeYoung