Case Summary (BLD) | | | 11/17/2011 | | DONE |
|
|
|
|
Third Notice | | 8/5/2009 | 9/1/2009 | | DONE |
|
|
|
|
Second Notice BLD | 3/4/2009 | 3/4/2009 | 8/5/2009 | | DONE |
Tisha Gallop
|
|
|
mailed
|
First Notice | 2/6/2009 | 2/6/2009 | 3/4/2009 | | DONE |
Jim Sly
|
|
|
|
BLD-Final | 2/5/2009 | 2/6/2009 | 2/6/2009 | A | PASS |
Jim Sly
|
|
|
Greg Phone #: ###-#### C/C issued.
|
DOC - Permit Finaled | 2/6/2009 | 2/6/2009 | 2/6/2009 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 2/5/2009 | 2/5/2009 | 2/5/2009 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
BLD-Final | 2/4/2009 | 2/5/2009 | 2/5/2009 | A | NR |
Jim Sly
|
|
|
greg Phone #: ###-#### Need Fire/Life final
|
BLD-Final | 1/20/2009 | 1/20/2009 | 1/20/2009 | A | NR |
Jim Sly
|
|
|
Need Electr final
|
BLD-Final | 1/13/2009 | 1/14/2009 | 1/14/2009 | P | NR |
Mike Jordan
|
|
|
greg Phone #: ###-####. Needs elec. final first.
|
BLD-Framing/Rough-in | 12/23/2008 | 12/23/2008 | 12/23/2008 | P | PASS |
Jim Sly
|
|
|
gregg Phone #: ###-####
|
Plan assigned to (DRS) | 10/1/2008 | 10/1/2008 | 12/15/2008 | | PASS |
Dan Stuart
|
|
|
12/15/2008 09:44:49 DRS - activity updated through activity BLDA022 from case BLD08-02110.
|
Routing - PLAN CHECK | 12/12/2008 | | 12/15/2008 | | PASS |
Dan Stuart
|
|
|
New plans and engineering inserted. ESR reports attached to plans. Project start up for special inspection form provided with MTI designated as special inspection agency. Plans to permit desk to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/15/2008 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 12/15/2008 | | DONE |
|
|
|
|
Telephone call | | | 12/15/2008 | | DONE |
|
|
|
t/c w greg fisher at ###-#### - permit ready and fees given - also need gc name and rce#
|
Permit Ready to Issue | | | 12/15/2008 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/15/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Plan resubmittals received | | | 12/12/2008 | | |
|
|
|
received 1 letter from Kim Rost for Ward Schwider,1 project start up for special inpections and 2 copies of sheet A2.0 taken to Dan S.
|
Plan resubmittals received | | | 12/11/2008 | | |
Dan Stuart
|
|
|
Rec'd two copies of sheet A2.0; taken to Dan S
|
Meeting | | | 12/11/2008 | | DONE |
|
|
|
Met with Ward Scwider in lobby. Resubmittals of 12/5/08 did not include data on new automatic doors; connection aty new header to existing wall (to be MST37); perimeter nailing w/ 8d@2" oc requires 3" framing member (will talk with Kim Rost, Engineer); data on design use of MST 48 connecting floors vertically; special inspection start up form for installation of SSW walls & epoxy anchors per ESR1679 for SSW panels; framing at end of SSW panels for hangers for new header at stairs. Changing use of (2) 18-9 SSW panels for (1) 24-9 and (1) 12-9 panel. Existing floor framing and bearing locations for second floor framing & shear walls per original plans is not as indicated on plans. Stair wall caries roof load bu not the floor load per Ward.Will provide missing information and design data.
|
Telephone call | | | 12/11/2008 | | DONE |
|
|
|
Talked W/ Kim Rost, Structural Engineer, to review perimeter nailing callout W 8d@2" oc.c. and requirement for 3" framing member or engineered design using (2) 1-1/2" faced nailed studs for nailing without splitting and to transfer loads; discussed design of MST 48 strap and span at floor joist/beam with lap needed and nailing for load transfer. Changed to MST60 - will provide change through Ward. Change of SSW18-9 to one SSW24-9 & one SSW12-9 okay.
|
Plan resubmittals received | | | 12/5/2008 | | |
Barbara Stitt
|
|
|
Received 2 copies of sheet A2.0 and 2 copies of calcs and taken to Dan Stuart///12-5-08 BAS
|
Routing - PLAN CHECK | 11/7/2008 | | 11/10/2008 | | FAIL |
Dan Stuart
|
|
|
Inserted resubmittals into plans and modified plan review conditions. Copy of third plan review report to architect for resubmittals.
|
Plan resubmittals requested | | | 11/10/2008 | | DONE |
|
|
|
Copy of remaining resubmittal items e-mailed to architect.
|
Routing - PLAN CHECK | 10/21/2008 | | 11/10/2008 | | FAIL |
Dan Stuart
|
|
|
|
Plan resubmittals received | | | 11/7/2008 | | |
Dan Stuart
|
|
|
Rec'd one copy of shear wall info and two copies of sheet A2.0; taken to Dan S
|
Routing - FIRE | 10/17/2008 | 10/17/2008 | 10/21/2008 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Plan resubmittals received | | | 10/21/2008 | | |
Barbara Stitt
|
|
|
Received 2 sheets of A0.0 and taken to Dan Stuart///10-21-08 @ 12:20pm BAS
|
1st review completed | | | 10/21/2008 | | FAIL |
|
|
|
Failed Plan Check
|
Route to Impact Fee Review | 10/17/2008 | 10/22/2008 | 10/20/2008 | | PASS |
Cindy M. Gould
|
|
|
Tenant improvement no impact fees
|
Plan resubmittals requested | | | 10/17/2008 | | DONE |
|
|
|
Resubmittals requested with copy of plan review sent to architect.
|
Print Pending Permit.LaserJet4 | | | 10/17/2008 | | |
|
|
|
|
Case Summary (BLD) | | | 10/17/2008 | | |
|
|
|
|
Routing - PLAN CHECK | 10/1/2008 | | 10/17/2008 | | FAIL |
Dan Stuart
|
|
|
Resubmittals required. copy of plan review sent to architect. Plans routing to fire code analyst for review.
|
Pending Assignment by JCB | 9/30/2008 | | 10/1/2008 | | DONE |
Jason Blais
|
|
|
|
Application received | | 9/30/2008 | 9/30/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/30/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/30/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|