Second Notice | | 8/5/2009 | 8/14/2009 | | DONE |
|
|
|
|
First Notice | | 6/23/2009 | 8/5/2009 | | DONE |
Tisha Gallop
|
|
|
mailed
|
Permanent Occupancy | | | 6/23/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
BLD-Final | 6/22/2009 | 6/22/2009 | 6/22/2009 | P | PASS |
Mike Jordan
|
|
|
jim Phone #: ###-####. Ok for perm occ.
|
FIRE-Final Inspection | 6/22/2009 | 6/22/2009 | 6/22/2009 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
FIRE-Final Inspection | 4/29/2009 | 4/29/2009 | 4/29/2009 | P | FAIL |
Troy Cobbley
|
|
|
Provide panic hardware on the pool gates as per the city approved plans. Remove the chemicals from the storage room and blank the dead bolts on the restroom doors.
|
Zoning Approval | 4/29/2009 | 4/29/2009 | 4/29/2009 | | PASS |
Josh Wilson
|
|
|
|
Print Occupancy Form | | | 4/29/2009 | | DONE |
|
|
|
|
Override - People Holds | | | 4/29/2009 | | |
|
|
|
|
Override - People Holds | | | 4/29/2009 | | |
|
|
|
|
BLD-Energy code compliance | 2/11/2009 | 2/11/2009 | 2/11/2009 | P | PASS |
Mike Jordan
|
|
|
jim Phone #: ###-####
|
BLD-Framing/Rough-in | 2/10/2009 | 2/11/2009 | 2/11/2009 | A | PASS |
Mike Jordan
|
|
|
jim Phone #: ###-####. All issues resolved. ok to insul.
|
BLD-Framing/Rough-in | 1/15/2009 | 1/16/2009 | 1/16/2009 | A | PART |
Mike Jordan
|
|
|
jim Phone #: ###-####. Provide ada backing and go over shear nailing.
|
BLD-Foundation | 12/3/2008 | 12/5/2008 | 12/5/2008 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 12/3/2008 at 3:18:10 PM. Contact: ###-####.
|
BLD-Footing | 12/3/2008 | 12/4/2008 | 12/4/2008 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 12/3/2008 at 3:16:24 PM. Contact: ###-####.
|
Print Occupancy Form | | | 12/3/2008 | | DONE |
|
|
|
|
Telephone call | | | 12/3/2008 | | DONE |
|
|
|
t/c w scott at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 12/3/2008 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/3/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/28/2008 | | 12/2/2008 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/2/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 12/2/2008 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 10/2/2008 | | 12/2/2008 | | PASS |
Tim L. Woodard
|
|
|
12/2/2008 16:14:55 TLW - activity updated through activity BLDA022 from case BLD08-02123.
|
Routing - PLUMBING | 11/26/2008 | | 11/28/2008 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc.
|
Routing - PLAN CHECK | 11/19/2008 | | 11/26/2008 | | PEND |
Tim L. Woodard
|
|
|
Routed to plumbing.
|
1st review completed | | | 11/19/2008 | | FAIL |
|
|
|
Failed Plumbing, Plan Check
|
Routing - FIRE | 11/18/2008 | | 11/19/2008 | | PASS |
|
|
|
Attached IFC comments to plans
|
Plan resubmittals received | | | 11/17/2008 | | |
Tim L. Woodard
|
|
|
Rec'd one copy of response letter, and two copies of sheets A3.1 & A1.1; taken back to fire review
|
Route to Impact Fee Review | 11/13/2008 | 11/18/2008 | 11/14/2008 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLAN CHECK | 10/16/2008 | | 11/13/2008 | | FAIL |
Tim L. Woodard
|
|
|
Refer to plan review report for corrections required. TLW
|
Plan resubmittals received | | | 10/24/2008 | | |
Tim L. Woodard
|
|
|
Rec'd 2 copies of sheets A1.1 & A3.1; inserted by arch rep, taken back to Tim W
|
Routing - PLANNING | 10/10/2008 | | 10/16/2008 | | PASS |
Matthew A Halitsky
|
|
|
Matt Halitsky drh08-00043
Pool House Only.
Routed to Plan Check (Tim W.)
|
Routing - PLUMBING | 10/7/2008 | | 10/10/2008 | | FAIL |
Bill VanDegrift
|
|
|
show sewer service routing to pool house on a plan stamped by an architect or engineer. make up water to pool equipment will require an R.P. interior plumbing plans require a stamp from an architect or engineer.
|
Routing - Erosion and Sediment | 10/7/2008 | | 10/7/2008 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions. ESC08-00843
|
Routing - PUBLIC WORKS | 10/2/2008 | | 10/7/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Solid Waste | 10/7/2008 | | 10/7/2008 | | PASS |
Peter J. McCullough
|
|
|
Pool House Only.
|
Routing PW Sewer Design | 10/3/2008 | | 10/7/2008 | | PASS |
Jon R. Gunnerson
|
|
|
Connect 4-inch service into main line, match crowns.
|
Routing PW Sewer Rating | 10/3/2008 | | 10/3/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing PW Drainage | 10/3/2008 | | 10/3/2008 | | PASS |
Brian Murphy
|
|
|
APPROVED PER SUB BY T.R.
|
Routing PW Street Lights | 10/3/2008 | | 10/3/2008 | | PASS |
Hank Alarcon
|
|
|
|
Routing - PLANNING Land Div | 10/2/2008 | | 10/2/2008 | | PASS |
Joan Johnson
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/2/2008 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 10/2/2008 | | |
|
|
|
|
Application received | | 10/2/2008 | | | |
Marsha Smylie
|
|
|
|