BLD-Final | 1/7/2009 | 1/8/2009 | 1/8/2009 | P | PASS |
Jim Storey
|
|
|
Bryan Phone #: ###-####
|
DOC - Permit Finaled | 1/8/2009 | 1/8/2009 | 1/8/2009 | P | PASS |
Jim Storey
|
|
|
|
Plan Reviewer's activity | | | 12/15/2008 | | DONE |
|
|
|
telephone call from the insurance agent requesting letter requiring the upgrade/replacement of the existing chimney/for fireplace/wood stove. gave him both attached MEC permit #s and phone numbers of inspectors 435 T. James, 301 J. Storey and L. Rice 309.
|
BLD-Energy code compliance | 11/17/2008 | 11/18/2008 | 11/18/2008 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/14/2008 at 1:46:57 PM. Contact: ###-####.
|
BLD-Energy code compliance | 11/14/2008 | 11/17/2008 | 11/17/2008 | A | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/14/2008 at 1:46:57 PM. Contact: ###-####. defered
|
BLD-Framing/Rough-in | 11/12/2008 | 11/12/2008 | 11/12/2008 | P | PART |
Dave Hannah
|
|
|
Bryan Phone #: ###-#### c/n on site ok to insulate
|
Issue PAID IN FULL permit | | | 10/17/2008 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 10/3/2008 | 10/3/2008 | 10/6/2008 | P | PASS |
Ben S. Pavelka
|
|
|
|
Case Summary (BLD) | | | 10/6/2008 | | DONE |
Ben S. Pavelka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/6/2008 | | DONE |
Ben S. Pavelka
|
|
|
|
Inspection Record Card- Bld | | | 10/6/2008 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 10/6/2008 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 10/6/2008 | | DONE |
Barbara Stitt
|
|
|
Called Bryan Murdoch and told him that permit is ready & fees due 10-6-08 @ 3:42pm BAS
|
Application received | | 10/3/2008 | 10/3/2008 | | DONE |
Marsha Smylie
|
|
|
|
Routing Walk-In (Zoning) | 10/3/2008 | 10/3/2008 | 10/3/2008 | P | DONE |
Perry Paine
|
|
|
10/3/2008 14:32:50 PEP - activity updated through activity BLDI252 from case BLD08-02136.
|
Routing Walk-In (BLD) | 10/3/2008 | 10/3/2008 | 10/3/2008 | P | PASS |
Colleen T Carroll
|
|
|
|