Permit NumberBLD08-02150
StatusFinaled
Name AMERICAN MECHANICAL
Site Address 800 W DIAMOND ST
Project NameACE CO - PHASE II
Customer Number 
ePlanReviewNo
Description
(ACE CO. - PHASE II) This building is fire sprinklered for fire area. To complete the Phase II remodel of an existing building. Phase I was done under permit BLD08-01126. The building was fully fire sprinklered under permit FIR08-00369. Work is to include upgrading 2 existing restrooms to be accessible to the disabled, constructing interior nonbearing walls, modifying the load path of a portion of the roof structure which includes the structural support for extended crane rails (concrete footings, steel columns, steel beams), placing new exterior concrete slabs to support new equipment, and placing new interior concrete floor slabs to support new equipment. The structural design for the crane runway girders and rails is a deferred submittal item and shall be provided to the Structural Inspector for review. The work is required to comply with the approved drawings, with the plan review report, with the structural design, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 10/31/200911/5/2009 DONE
Telephone call  11/5/2009 DONE
DetailsTisha Gallop
called and spoke with Glenn/American Mech. need final values. He said misunderstood and thought only mechanical value. I explained he is general for the whole project and I need bld, ele, plm, and mech values. He said to fax it to him and will get it back to me today, he said not need to mail it to him.
Third Notice 10/8/200910/21/2009 DONE
faxed, mailed and called
Telephone call  10/21/2009 DONE
DetailsTisha Gallop
called and left voice message for Glenn w/American Mech. need final values
Third Notice 9/28/20099/28/2009 DONE
Second Notice 9/17/20099/18/2009 DONE
First Notice 6/17/20099/17/2009 DONE
BLD-Final6/16/20096/17/20096/17/2009APASS
DetailsJim Storey
evert ###-#### 8:30 am appt.
Override - Condition Holds  6/17/2009  
Permanent Occupancy  6/17/2009 DONE
DetailsTisha Gallop
FIRE-Final Inspection6/5/20096/5/20096/5/2009PPASS
DetailsForrest France
Items on correction notice verified for completion, fire life safety inspection passed. NOTE: No signature card available on site, notified contractor.
BLD-Final3/3/20093/9/20093/10/2009PCANC
DetailsJim Storey
everett Phone #: ###-#### c/n by fire. call from fire to wait for c/n to be done before bld final can occur.
BLD-Final3/9/20093/10/20093/10/2009ACANC
DetailsJim Storey
everett Phone #: ###-#### c/n by fire. call from fire to wait for c/n to be done before bld final can occur.
FIRE-Final Inspection3/3/20093/9/20093/9/2009AFAIL
DetailsForrest France
See correction notice on site for list of items to be repaired including door hardware at the main entry/exit, hardware at the restroom vestibule, hardware at the door from the process bay to the cleaning room, need to provide exit signage and EM lighting including the exit discharge per plan annotations and fire code review notes.
Zoning Approval3/4/20093/5/20093/5/2009 PASS
DetailsJosh Wilson
OK per DRH08-00329
Override - Condition Holds  3/4/2009  
Override - Condition Holds3/3/20091/1/19003/3/2009  
fire life safety
BLD-Aging Inspection2/23/20092/23/20092/25/2009 NR
DetailsJim Storey
sent e-mail responce to help inform owner as to what was still outstanding.
Issue PAID IN FULL permit  11/24/2008 DONE
Telephone call  11/18/2008 DONE
Details
t/c david ruby at ###-#### - permit ready and fees given - also need rp name
Permit Ready to Issue  11/18/2008 DONE
Details
Routing - PLUMBING11/14/2008 11/17/2008 PASS
DetailsBill VanDegrift
per plans dated 11/12 08 and 2003 upc
Routing - PLAN CHECK11/17/2008 11/17/2008 DONE
DetailsCarl Westfall
2nd round of routing completed.
PLANS/APPL TAKEN TO FRONT DESK  11/17/2008 DONE
Print Occupancy Form  11/17/2008 DONE
Details
Routing - Design Review  11/17/2008 PASS
DetailsJosh Wilson
Josh Wilson DRH08-00329.
Plan assigned to (CJW)10/7/2008 11/17/2008 PASS
DetailsCarl Westfall
11/17/2008 13:44:51 CJW - activity updated through activity BLDA022 from case BLD08-02150.
Routing - PLAN CHECK10/24/2008 11/14/2008 PASS
DetailsCarl Westfall
(11-10-08) Completed the resubmittal review. Needed revised drawings and structural calculations. (11-14-08) Drawings approved after resubmittal review.
Routing - PLANNING11/14/2008 11/14/2008 PASS
DetailsJosh Wilson
OK per revised plans.
Routing - PUBLIC WORKS11/14/2008 11/14/2008 PASS
DetailsCarl Westfall
Per Bev and Connie, fees not charged for emergency showers.
Plan resubmittals received  11/12/2008  
DetailsCarl Westfall
Rec'd transmittal letter, two copies of structural calcs, and three copies of sheets; L1.1, A2.1, A3.1, P0.0, P0.1, P0.2, P1.0, P1.1, P2.0, M0.0, M0.1, M0.2, M1.0, & M1.1; taken to Carl W
Plan resubmittals received  11/6/2008  
received comment letter from ruby edwards arch--also "2" sheets each of A1.1, S2.2, & S3.O-plans taken to Carl Westfall
Route to Impact Fee Review10/23/200810/28/200810/24/2008 PASS
DetailsCindy M. Gould
Remodel to existing building no impact fees
Routing - FIRE10/23/200810/23/200810/24/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  10/24/2008 FAIL
Failed Plumbing, Plan Check
Routing - PLAN CHECK10/16/2008 10/23/2008 FAIL
DetailsCarl Westfall
The IBC plan review was started on October 21, 2008 and was finished on October 23, 2008. Revised drawings were required. See the plan review report.
Routing - PLUMBING10/9/2008 10/16/2008 FAIL
DetailsBill VanDegrift
show the drinking fountain outside the restrooms and the emergency shower installed at grids A.9-4.
Routing - PLANNING10/16/2008 10/16/2008 PASS
DetailsJosh Wilson
Routing Off Site - STRUCTURAL10/7/2008 10/15/2008 FAIL
DetailsCarl Westfall
(10-15-08) Revisions requested by the consultant Structural Engineer. (11-14-08) Structural changes approved by the City Plans Examiner.
Routing - Erosion and Sediment10/8/2008 10/9/2008 PASS
DetailsSteven Webb
ESC plan waiver approved with attached conditions. ESC08-00853
Routing PW Sewer Rating10/8/2008 10/8/2008 PASS
DetailsLouise Waldorf
Routing PW Environmental10/8/2008 10/8/2008 PASS
DetailsTerry Alber
Routing - PUBLIC WORKS10/7/2008 10/8/2008 PASS
DetailsBeverly Hall
Application received 10/7/200810/7/2008 DONE
DetailsAlexandra L. DeYoung
Pending Assignment by JCB10/7/2008 10/7/2008 DONE
DetailsJason Blais
Plans ACCEPTED BY PLAN TECH  10/7/2008 DONE
DetailsAlexandra L. DeYoung
Recd Pcfee & Taken To Pln CK  10/7/2008 DONE
DetailsAlexandra L. DeYoung
Telephone call  10/7/2008 DONE
DetailsAlexandra L. DeYoung
Called Action Couriers to pick up and take to outside engineer.