BLD-Final | 12/29/2008 | 12/30/2008 | 12/30/2008 | A | PASS |
Tom Arcoraci
|
|
|
jeramiah Phone #: ###-####
|
DOC - Permit Finaled | 12/30/2008 | 12/30/2008 | 12/30/2008 | P | PASS |
Tom Arcoraci
|
|
|
|
Routing Walk-In (Zoning) | 11/28/2008 | 11/28/2008 | 12/2/2008 | A | PASS |
David Moser
|
|
|
Exterior changes O.K per C.C.
|
BLD-Energy code compliance | 11/28/2008 | 12/1/2008 | 12/1/2008 | A | PASS |
Mike Jordan
|
|
|
jeriamiah Phone #: ###-#### Note: please call 1/2 prior to inspection. Energy ok. Elevations were resubmitted and approved by zoning. ok to rock.
|
BLD-Framing/Rough-in | 11/25/2008 | 11/26/2008 | 11/26/2008 | P | PART |
Mike Jordan
|
|
|
jeramia Phone #: ###-####. Framing ok. Also check ESC permit. Needs to resubmit elevation drawings for canges to windows and using stucco.
|
BLD-Foundation | 10/29/2008 | 10/30/2008 | 10/30/2008 | P | DEFR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/29/2008 at 8:11:01 AM. Contact: ###-####. Concrete already placed in stemwall when I arived on site.
|
BLD-Footing | 10/29/2008 | 10/29/2008 | 10/29/2008 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/29/2008 at 8:10:28 AM. Contact: ###-####. wip.
|
Issue PAID IN FULL permit | | | 10/27/2008 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/17/2008 | | DONE |
|
|
|
|
Telephone call | | | 10/17/2008 | | DONE |
|
|
|
t/c w jeremiah at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 10/17/2008 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 10/15/2008 | 10/15/2008 | 10/15/2008 | | PASS |
Carl D Madsen
|
|
|
10/15/2008 14:39:48 CDM - activity updated through activity BLDA022 from case BLD08-02168.
|
Route to Impact Fee Review | 10/9/2008 | 10/14/2008 | 10/15/2008 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLAN CHECK | 10/13/2008 | | 10/15/2008 | | PASS |
Carl D Madsen
|
|
|
Fire rated eave detail required
|
Telephone call | | | 10/15/2008 | | DONE |
|
|
|
Talked to Jerimiah Stone, we need a resubmital for a fire rated eave detail on the west side of the structure per R302. 10-15-08 CDM
|
Case Summary (BLD) | | | 10/15/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/15/2008 | | DONE |
|
|
|
|
Routing - PLANNING | 10/10/2008 | | 10/13/2008 | | FAIL |
David Moser
|
|
|
The CUP05-00087 amenities are not yet built or bonded for. These CUP amenities need to be built or bonded before bldg permit. Called Jeremiah Stone and Max Boesinger on 10-13-08 about the required CUP amenities.
|
Telephone call | | | 10/13/2008 | | DONE |
|
|
|
Talked Jeremiah Stone (###-####) about the single family house at 10515 W Palazzo. The bay window on east side is in the side yard setback and aminities need to be built or bonded for before building permit is passed.
|
Telephone call | | | 10/13/2008 | | DONE |
|
|
|
Talked with Max Boesinger about the CUP amenities and the ameniteis are not built yet. He did not know if the required amenities were bonded for and I told him that he needs to build the amenities or bond for it. Mr. Boesinger states that he will build the amenities at about the same time as this house. He will come in today 10-13-08 and discuss with the planning staff the amenities and a CUP mod for bay windows and changes to back units.
|
Routing - PLANNING | 10/13/2008 | | 10/13/2008 | | PASS |
David Moser
|
|
|
No condition in CUP or SUB stated that the amenities were required to be built or bonded. Approved as redlined; the bay window shall be removed because it is in the side yard setback. Building (living space) shall be 5 feet from side yard property line.
|
Routing - PUBLIC WORKS | 10/13/2008 | | 10/13/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing - Addressing | 10/9/2008 | | 10/10/2008 | | PASS |
Chris Pichardo
|
|
|
|
Application received | | 10/9/2008 | | | |
|
|
|
|
Pending Assignment by JCB | 10/9/2008 | | | | |
Jason Blais
|
|
|
|