Third Notice | | 9/14/2009 | 9/14/2009 | | DONE |
|
|
|
|
Third Notice | | 8/11/2009 | 9/14/2009 | | DONE |
|
|
|
|
Second Notice | | 7/22/2009 | 8/11/2009 | | DONE |
|
|
|
|
First Notice | | 7/7/2009 | 8/11/2009 | | DONE |
|
|
|
|
First Notice | | 7/7/2009 | 7/22/2009 | | DONE |
|
|
|
|
FIRE-Final Inspection | 7/7/2009 | 7/7/2009 | 7/7/2009 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
Permanent Occupancy UNPAID FEE | | | 7/7/2009 | | DONE |
|
|
|
|
Permanent Occupancy UNPAID FEE | | | 7/7/2009 | | DONE |
|
|
|
|
BLD-Final | 4/21/2009 | 4/22/2009 | 4/22/2009 | A | PART |
Mike Jordan
|
|
|
mike Phone #: ###-####. Temp occ. granted. Willbe ok for perm occ once life/safety and fire alarm have been signed off perm.
|
Temporary Occupancy | 4/22/2009 | 7/21/2009 | 4/22/2009 | | DONE |
Tisha Gallop
|
|
|
|
FIRE-Final Inspection | 4/20/2009 | 4/21/2009 | 4/21/2009 | A | PART |
Troy Cobbley
|
|
|
All life safety items are passed but only a temporary occupancy was given until the project related fire alarm permit is finaled.
|
Print Occupancy Form | | | 4/9/2009 | | DONE |
|
|
|
|
BLD-Other | 4/2/2009 | 4/3/2009 | 4/3/2009 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/2/2009 at 9:05:22 AM. Contact: ###-####. All issues with grid ceiling have been resolved. ok for cover after fire sprinkler ri.
|
BLD-Other | 4/1/2009 | 4/2/2009 | 4/2/2009 | A | FAIL |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/1/2009 at 1:00:29 PM. Contact: ###-####. Needs to add wires to all diffusers, and match the old system with the new system. Will recall for tomorrrow. Also still needs fire sprinkler ri.
|
BLD-Framing/Rough-in | 4/1/2009 | 4/2/2009 | 4/2/2009 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/1/2009 at 12:59:50 PM. Contact: ###-####. Note that framing insp. got entered on demo permit. Interior framed walls have been inspected.
|
BLD-Aging Inspection | 3/10/2009 | 3/10/2009 | 3/10/2009 | | PASS |
Mike Jordan
|
|
|
wip.
|
Issue PAID IN FULL permit | | | 12/9/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/2/2008 | | 12/3/2008 | | PASS |
Sam Zahorka
|
|
|
INSERTED NEW SHEET A1.1 SHOWING FIRE EXTINGUISHERS AND RED-LINED PANIC/FIRE EXIT HARDWARE ON TWO DOORS FOR THE ASSEMBLY AREA.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/3/2008 | | DONE |
Sam Zahorka
|
|
|
|
Print Occupancy Form | | | 12/3/2008 | | DONE |
|
|
|
|
Telephone call | | | 12/3/2008 | | DONE |
|
|
|
left vm for doug watson at ###-#### - permit ready and fees given - also need ACHD receipt
|
Permit Ready to Issue | | | 12/3/2008 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 10/16/2008 | | 12/3/2008 | | PASS |
Sam Zahorka
|
|
|
12/3/2008 08:44:05 SRZ - activity updated through activity BLDA022 from case BLD08-02170.
|
Routing - PLAN CHECK | 12/1/2008 | | 12/2/2008 | | PEND |
Sam Zahorka
|
|
|
Pending Fire to pass. Recieved new Fire extinguisher layout plans and routed to Fire.
|
Plan resubmittals received | | | 12/2/2008 | | DONE |
|
|
|
received 1 transmittal, and 2 copies of sheet A1.1 taken to Sam Z.
|
Routing - FIRE | 12/2/2008 | | 12/2/2008 | | PASS |
Scott Arellano
|
|
|
Attached updated IFC comments to plans
|
Routing - FIRE | 11/26/2008 | | 12/1/2008 | | FAIL |
Scott Arellano
|
|
|
Faxed and emailed resubmittal items to architect.
|
Case Summary (BLD) | | | 11/26/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/3/2008 | | 11/26/2008 | | PEND |
Sam Zahorka
|
|
|
Pending others to pass. Routed back to Fire.
|
Plan resubmittals received | | | 11/20/2008 | | DONE |
|
|
|
received 1 transmittal, 1 memo/response , 1 memo changes 1 memo comments , 1 letter planned use and 2 copies of sheets AD1.1,A1.1,A3.1,A8.1, M1.2,P1.2,E2.0L,E2.0MP,E3.1,E2.0P,E2.05 taken to Sam Z.
|
Routing - FIRE | 10/30/2008 | 10/30/2008 | 11/3/2008 | | FAIL |
Scott Arellano
|
|
|
Faxed and emailed resubmittal items to architect.
|
1st review completed | | | 11/3/2008 | | FAIL |
|
|
|
Failed Plan Check, Fire
|
Route to Impact Fee Review | 10/30/2008 | 11/4/2008 | 10/31/2008 | | PASS |
Cindy M. Gould
|
|
|
Tenant improvement no fees
|
Telephone call | | | 10/31/2008 | | DONE |
Sam Zahorka
|
|
|
Had a telephone conversation with Christoper Willis the tenant contact person and answered his code questions on how to reduce the occupant load of the assembly projector room. He requested an alternate and I suggested he write an alternate code request letter and email to me. SRZ
|
Telephone call | | | 10/31/2008 | | DONE |
Sam Zahorka
|
|
|
Spoke with Doug Watson the architect for this project. He had questions about the plumbing fixtures and other corrections in the plan review correction report. Waiting for 1st resubmittals. (SRZ)
|
Plan Reviewer's activity | | | 10/31/2008 | | DONE |
Sam Zahorka
|
|
|
Emailed outline for an acceptable alternate code request to the applicant.
|
Case Summary (BLD) | | | 10/30/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/20/2008 | | 10/30/2008 | | FAIL |
Sam Zahorka
|
|
|
Emailed comments to the Architect. Routed to Fire Review.
|
Routing - Design Review | 10/17/2008 | | 10/20/2008 | | PASS |
Sarah Schafer
|
|
|
Sarah Schafer. Replacing an exterior window, one new exterior door, and exterior wall infill at one overhead door opening.
Approved the modifications on the building plans. Majority of the improvements are interior to the site and will have no effect on the surrounging roadways. SMS
|
Routing - PUBLIC WORKS | 10/16/2008 | | 10/17/2008 | | PASS |
Beverly Hall
|
|
|
Garbage disposal shown at break room sink on sheet P1.2.
|
Routing PW Sewer Rating | 10/17/2008 | | 10/17/2008 | | PASS |
Louise Waldorf
|
|
|
|
Pending Assignment by JCB | 10/9/2008 | | 10/16/2008 | | DONE |
Jason Blais
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/13/2008 | | DONE |
Darla L Downs
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/13/2008 | | DONE |
|
|
|
|
Application received | | 10/9/2008 | | | |
|
|
|
|