Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD08-02187
StatusFinaled
Name PARADIGM CONSTRUCTION COMPANY LLC
Site Address 8918 W EVENING STAR LN
Project NamePinetree Village
Customer Number 
ePlanReviewNo
Description
(UNIT 2 BUILDING 7) This permit is for the construction of one unit in a new townhouse. The mains story is 691 square feet with one bathroom and an attached garage of 535 square feet. The second story is 589 square feet with three bedrooms and two bathrooms. The front porch is 60 square feet and the separation wall between units is built to gypsum file WP 4136. The walls built on the property line have a fire rating that extends to the roof deck per the detail of page A6.1. See comments for anchors. R-2D zoning district, building setbacks, CUP07-000150, CUP08-00058, and DRH08-00043. Built per all approved plans, engineering, red lining, and plan review report. (BSP)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/17/20096/17/20096/17/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 6/17/2009 at 9:20:06 AM.
DOC - Permit Finaled6/17/20096/17/20096/17/2009PPASS
DetailsMike Jordan
Cert of occ issued.
BLD-Final6/12/20096/12/20096/12/2009PNR
DetailsDave Hannah
Jim Phone #: ###-#### needs a mec final first
Zoning Approval4/29/20094/29/20094/29/2009 PASS
DetailsJosh Wilson
BLD-Other4/16/20094/16/20094/16/2009PCANC
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/16/2009 at 8:25:36 AM. Contractor called in wrong unit.
BLD-Other4/14/20094/14/20094/14/2009PPASS
DetailsMike Jordan
Jim- ###-####- building wrap. Verified instalaltion of exterior weather barrier.
BLD-Other4/10/20094/10/20094/10/2009PNR
DetailsMike Jordan
Jim- house wrap Phone #: ###-####
BLD-Energy code compliance3/31/20093/31/20093/31/2009PPASS
DetailsMike Jordan
Jim Phone #: ###-####. ok to cover.
BLD-Energy code compliance3/30/20093/30/20093/30/2009PNR
DetailsMike Jordan
jim Phone #: ###-####
BLD-Framing/Rough-in3/27/20093/27/20093/27/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/27/2009 at 8:11:30 AM. Contact: ###-####. ok to insul.
BLD-Framing/Rough-in3/6/20093/9/20093/9/2009APASS
DetailsMike Jordan
Jim Phone #: ###-####. NAiling on both layers of 5/8 type x rock from2nd. floor ceiling to underside of roof deck, both sides. Also verified fire rated plywood for laydown parapet at overbuild areas.
BLD-Framing/Rough-in3/6/20093/6/20093/6/2009PNR
DetailsMike Jordan
Jim Phone #: ###-####
BLD-Framing/Rough-in3/5/20093/5/20093/5/2009PCANC
DetailsMike Jordan
jim Phone #: ###-####
BLD-Framing/Rough-in3/4/20093/4/20093/4/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/4/2009 at 7:04:11 AM. Contact: ###-####. 2nd. floor, 2nd layer, both sides of 5/8 type x rock for 2hr. fire wall.
BLD-Framing/Rough-in3/3/20093/3/20093/3/2009PNR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/3/2009 at 7:28:03 AM. Contact: ###-####.
BLD-Framing/Rough-in3/2/20093/2/20093/2/2009PPASS
DetailsMike Jordan
jim Phone #: ###-####. both layers of 5/8 type x rock at overbuild areas. ok.
BLD-Framing/Rough-in2/27/20092/27/20092/27/2009PNR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/27/2009 at 8:22:42 AM. Contact: ###-####.
BLD-Framing/Rough-in2/24/20092/25/20092/26/2009PPASS
DetailsMike Jordan
Jim Phone #: ###-####. 2nd. floor, 2nd. layer of 5/8 type x rock, remaining side.
BLD-Framing/Rough-in2/24/20092/24/20092/24/2009PPASS
DetailsMike Jordan
1st. floor, 1st layer of 5/8 type x rock, remaining side for 2hr. fire wall.
BLD-Framing/Rough-in2/23/20092/24/20092/24/2009ANR
DetailsMike Jordan
Jim This inspection is for the fire wall Phone #: ###-####
BLD-Framing/Rough-in2/23/20092/23/20092/23/2009PPASS
DetailsMike Jordan
jim Phone #: ###-####. 1st. floor, 2nd. layer ,5/8 type x rock for 2hr. wall.
BLD-Framing/Rough-in2/23/20092/23/20092/23/2009APART
DetailsMike Jordan
jim Phone #: ###-####. 1st. floor, 1st layer type x rock, one side only.
BLD-Framing/Rough-in2/20/20092/20/20092/20/2009PNR
DetailsMike Jordan
BLD-Framing/Rough-in2/19/20092/20/20092/20/2009ACANC
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/19/2009 at 9:50:26 PM. Contact: ###-####.
BLD-Footing2/13/20092/13/20092/17/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/13/2009 at 8:24:34 AM. Contact: ###-####. Interior footings.
BLD-Energy code compliance1/29/20091/29/20091/29/2009PPASS
DetailsMike Jordan
Jim Phone #: ###-####. Rigid foam insul. on interior side of stemwall. ok.
BLD-Foundation1/27/20091/27/20091/27/2009PPASS
DetailsMike Jordan
bill Phone #: ###-####
BLD-Footing1/23/20091/23/20091/23/2009PPASS
DetailsMike Jordan
bill Phone #: ###-####. Perimeter footings.
Plan assigned to (BSP)12/26/200812/26/20081/20/2009 PASS
DetailsBen S. Pavelka
1/20/2009 10:06:57 CDM - activity updated through activity BLDA022 from case BLD08-02187.
PLANS/APPL TAKEN TO FRONT DESK  1/20/2009  
Inspection Record Card- Bld  1/20/2009 DONE
DetailsBarbara Stitt
Permit Ready to Issue  1/20/2009 DONE
DetailsBarbara Stitt
Routing - PLANNING Land Div1/20/2009 1/20/2009 PASS
DetailsTodd Tucker
Issue PAID IN FULL permit  1/20/2009 DONE
DetailsBarbara Stitt
Case Summary (BLD)  1/15/2009 DONE
CHANGE STATUS TO (REV)  1/9/2009  
Route to Impact Fee Review10/13/200810/16/20081/8/2009 PASS
DetailsCindy M. Gould
Routing - PLAN CHECK12/23/2008 1/8/2009 PASS
DetailsBen S. Pavelka
Plan review complete, waiting for subdivision to be recorded before permits can be issued. (BSP) 1-9-09
Inspection Record Card- Bld  1/8/2009 DONE
Details
Case Summary (BLD)  1/7/2009  
Telephone call  12/29/2008  
Called Jim Larkin at ###-#### to notify him of resubmittals required for separation wall, res check and water closet clearances. Faxed resubmital request to ###-####. 12-29-08 BSP
Plans ACCEPTED BY PLAN CHECK  12/26/2008  
DetailsBen S. Pavelka
Routing - PLANNING12/19/2008 12/23/2008 PASS
DetailsMatthew A Halitsky
Routing - PLANNING10/14/2008 12/19/2008 PASS
DetailsLucinda Grames
See site plan attached to construction plans. Routed to Matt H.
Plan resubmittals received  12/9/2008 DONE
DetailsAlexandra L. DeYoung
Routing - PLANNING Land Div10/14/2008 10/14/2008 FAIL
DetailsCody Riddle
Final plat has not been approved for associated subdivision. Contacted applicant on 10/14/2008. CER
Routing - PUBLIC WORKS10/14/2008 10/14/2008 PASS
DetailsLouise Waldorf
Routing - Addressing10/13/2008 10/14/2008 PASS
DetailsChris Pichardo
Application received 10/13/2008