Zoning Approval | 8/3/2009 | 8/3/2009 | 8/3/2009 | | DONE |
Matthew A Halitsky
|
|
|
|
BLD-Final | 6/12/2009 | 6/12/2009 | 6/12/2009 | P | PASS |
Dave Hannah
|
|
|
Jim Phone #: ###-####
|
DOC - Permit Finaled | 6/12/2009 | 6/12/2009 | 6/12/2009 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Other | 4/3/2009 | 4/3/2009 | 4/3/2009 | P | CANC |
Mike Jordan
|
|
|
Jim- building wrap Phone #: ###-####
|
BLD-Framing/Rough-in | 3/18/2009 | 3/18/2009 | 3/18/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/18/2009 at 6:20:39 AM. Contact: ###-####. Inspected remaining layer of 5/8 type x rock in garages for 2hr. fire walls. Also verified installation of exterior water resistive barrier.
|
BLD-Energy code compliance | 3/12/2009 | 3/13/2009 | 3/13/2009 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/12/2009 at 8:36:12 PM. Contact: ###-####. ok to rock.
|
BLD-Framing/Rough-in | 3/11/2009 | 3/11/2009 | 3/11/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/11/2009 at 7:16:09 AM. Contact: ###-####. ok to insul.
|
BLD-Energy code compliance | 3/10/2009 | 3/11/2009 | 3/11/2009 | P | CANC |
Mike Jordan
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 2/23/2009 | 2/23/2009 | 2/23/2009 | P | PASS |
Mike Jordan
|
|
|
jim Phone #: ###-####. 1st. layer type x rock from ceiling to bottom of roof deck, both sides.
|
BLD-Framing/Rough-in | 2/19/2009 | 2/20/2009 | 2/20/2009 | P | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/19/2009 at 9:59:09 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/19/2009 | 2/19/2009 | 2/19/2009 | P | PASS |
Mike Jordan
|
|
|
jim - firewalls Phone #: ###-####.. Verified fire rated plywood at 4ft. laydown parapet at overbuild areas.
|
BLD-Framing/Rough-in | 2/18/2009 | 2/19/2009 | 2/19/2009 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/18/2009 at 5:07:07 PM. type x rock at overbuild areas ok.
|
BLD-Framing/Rough-in | 2/18/2009 | 2/18/2009 | 2/18/2009 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. 2nd. floor, 2nd. layer, both sides type x rock for 2hr. wall.
|
BLD-Framing/Rough-in | 2/17/2009 | 2/17/2009 | 2/17/2009 | P | PART |
Mike Jordan
|
|
|
Jim- Fire wall Phone #: ###-####. 2nd. floor, 1st. layer 5/8 type x rock for 2hr. wall, both sides.
|
BLD-Framing/Rough-in | 2/11/2009 | 2/13/2009 | 2/13/2009 | P | NR |
Mike Jordan
|
|
|
jim - fire wall Phone #: ###-####
|
BLD-Framing/Rough-in | 2/10/2009 | 2/11/2009 | 2/11/2009 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. 1st. floor, 2nd. layer 5/8 type x rock for 2hr. wall, both sides.
|
BLD-Framing/Rough-in | 2/10/2009 | 2/11/2009 | 2/11/2009 | A | PART |
Mike Jordan
|
|
|
Jim Phone #: ###-####. 1st.floor, 5/8 type x rock for 2hr. wall, remaining side.
|
BLD-Framing/Rough-in | 2/10/2009 | 2/10/2009 | 2/10/2009 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. 1st. floor, 5/8 type x rock for 2hr. wall, one side only.
|
BLD-Conference | 2/5/2009 | 2/5/2009 | 2/5/2009 | P | CANC |
Mike Jordan
|
|
|
|
BLD-Footing | 2/4/2009 | 2/5/2009 | 2/5/2009 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/4/2009 at 2:51:43 PM. Contact: ###-####. Interior footings.
|
BLD-Energy code compliance | 1/23/2009 | 1/23/2009 | 1/23/2009 | P | PASS |
Mike Jordan
|
|
|
jim Phone #: ###-####. rigid insul. on interior side of stemwall.
|
BLD-Foundation | 1/22/2009 | 1/22/2009 | 1/22/2009 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Foundation | 1/21/2009 | 1/22/2009 | 1/22/2009 | A | NR |
Mike Jordan
|
|
|
bill Phone #: ###-####. REscheduled for pm.
|
BLD-Footing | 1/20/2009 | 1/21/2009 | 1/21/2009 | A | PASS |
Mike Jordan
|
|
|
Jim-###-####. Exterior perimeter footings.
|
Plan assigned to (BSP) | 12/30/2008 | 12/30/2008 | 1/20/2009 | | PASS |
Carl D Madsen
|
|
|
1/20/2009 10:17:04 CDM - activity updated through activity BLDA022 from case BLD08-02198.
|
Routing - PLAN CHECK | 12/24/2008 | | 1/20/2009 | | PASS |
Ben S. Pavelka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/20/2009 | | |
|
|
|
|
Routing - PLANNING Land Div | 1/20/2009 | | 1/20/2009 | | PASS |
Todd Tucker
|
|
|
|
Inspection Record Card- Bld | | | 1/20/2009 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 1/20/2009 | | DONE |
Barbara Stitt
|
|
|
|
Issue PAID IN FULL permit | | | 1/20/2009 | | DONE |
|
|
|
|
(F) Reprint permit | | | 1/20/2009 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 1/14/2009 | | DONE |
|
|
|
|
Routing - PLANNING Land Div | 1/13/2009 | | 1/13/2009 | | FAIL |
Todd Tucker
|
|
|
No building permits can be issued until the final plat has been recorded.
|
Route to Impact Fee Review | 10/13/2008 | 10/16/2008 | 1/9/2009 | | PASS |
Cindy M. Gould
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 12/30/2008 | | |
Ben S. Pavelka
|
|
|
|
Routing - PUBLIC WORKS | 12/23/2008 | | 12/24/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing - PLANNING | 12/19/2008 | | 12/23/2008 | | PASS |
Matthew A Halitsky
|
|
|
|
Routing - PLANNING | 10/15/2008 | | 12/19/2008 | | PASS |
Lucinda Grames
|
|
|
See site plan attached to construction plans. Routed to Matt H.
|
Plan resubmittals received | | | 12/9/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Routing - Addressing | 10/14/2008 | | 10/15/2008 | | PASS |
Chris Pichardo
|
|
|
|
Application received | | 10/13/2008 | | | |
|
|
|
|
Routing - PLAN CHECK | 10/15/2008 | | | | |
Chris Pichardo
|
|
|
|