BLD-Final | 8/13/2009 | 8/13/2009 | 8/14/2009 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 8/14/2009 | 8/14/2009 | 8/14/2009 | P | PASS |
Mike Jordan
|
|
|
Cert. of occ. was issued.
|
BLD-Final | 8/13/2009 | 8/13/2009 | 8/13/2009 | A | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 8/13/2009 at 6:07:14 AM. Stiil needs elec. final. Rescheduled for pm.
|
Zoning Approval | 8/3/2009 | 8/3/2009 | 8/3/2009 | | DONE |
Matthew A Halitsky
|
|
|
|
BLD-Other | 4/3/2009 | 4/3/2009 | 4/3/2009 | P | PASS |
Mike Jordan
|
|
|
Jim- building wrap Phone #: ###-####. Verified installation of weather resistive barrier. ok.
|
BLD-Framing/Rough-in | 3/23/2009 | 3/23/2009 | 3/23/2009 | P | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/23/2009 at 6:12:24 AM. Contact: ###-####.
|
BLD-Energy code compliance | 3/23/2009 | 3/23/2009 | 3/23/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/23/2009 at 6:12:24 AM. Contact: ###-####. ok for cover.
|
BLD-Framing/Rough-in | 3/20/2009 | 3/20/2009 | 3/20/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/20/2009 at 7:02:43 AM. Contact: ###-####. ok tgo insul. Also inspected double layer 5/8 type x rock underneath at soffitt area.
|
BLD-Framing/Rough-in | 3/9/2009 | 3/9/2009 | 3/10/2009 | P | PASS |
Mike Jordan
|
|
|
Nailing for both layers of 5/8 type x rock from ceilng to underside of roof deck. Also verified fire rated plywood for laydown parapet at overbuild areas.
|
BLD-Framing/Rough-in | 3/2/2009 | 3/2/2009 | 3/2/2009 | A | PASS |
Mike Jordan
|
|
|
Attachment of 5/8 typex rock for 2hr. fire walls at overbuild areas. ok.
|
BLD-Framing/Rough-in | 2/24/2009 | 2/25/2009 | 2/25/2009 | A | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. 2nd. floor, 2nd. layer, remaining side 5/8 type x rock for 2hr. wall.
|
BLD-Framing/Rough-in | 2/24/2009 | 2/24/2009 | 2/24/2009 | P | PASS |
Mike Jordan
|
|
|
2nd. floor, 1st. layer of 5/8 type x rock, remaining side for 2hr. fire wall.
|
BLD-Framing/Rough-in | 2/23/2009 | 2/24/2009 | 2/24/2009 | A | NR |
Mike Jordan
|
|
|
Jim This inspection is for the fire wall Phone #: ###-####
|
BLD-Framing/Rough-in | 2/23/2009 | 2/23/2009 | 2/23/2009 | P | CANC |
Mike Jordan
|
|
|
jim Phone #: ###-####
|
BLD-Framing/Rough-in | 2/19/2009 | 2/20/2009 | 2/20/2009 | A | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/19/2009 at 9:54:07 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/19/2009 | 2/19/2009 | 2/19/2009 | P | PASS |
Mike Jordan
|
|
|
jim - firewalls Phone #: ###-####. 2nd. floor, 2nd layer, one side of type x rock for 2hr. wall.
|
BLD-Framing/Rough-in | 2/18/2009 | 2/19/2009 | 2/19/2009 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/18/2009 at 10:08:12 PM. 2nd. floor, 1st. layer type x rock for 2hr. wall, one side only ok.
|
BLD-Framing/Rough-in | 2/18/2009 | 2/18/2009 | 2/18/2009 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. 1st. floor, 2nd. layer, both sides 5'8 type x rock for 2hr. wall.
|
BLD-Framing/Rough-in | 2/17/2009 | 2/17/2009 | 2/17/2009 | P | PART |
Mike Jordan
|
|
|
Jim- Fire wall Phone #: ###-####. 1st. floor, 1st. layer of 5/8 type x rock for 2hr. wall, both sides.
|
Case Summary (BLD) | | | 2/13/2009 | | |
|
|
|
|
BLD-Footing | 2/12/2009 | 2/12/2009 | 2/12/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/12/2009 at 7:39:23 AM. Contact: ###-####. Interior footings ok.
|
BLD-Energy code compliance | 2/2/2009 | 2/3/2009 | 2/3/2009 | A | PASS |
Mike Jordan
|
|
|
jim Phone #: ###-####. rigid foam insul. on interior side of stemwall. ok.
|
BLD-Foundation | 1/29/2009 | 1/29/2009 | 1/29/2009 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 1/29/2009 at 7:29:54 AM. Contact: ###-####.
|
BLD-Foundation | 1/27/2009 | 1/28/2009 | 1/28/2009 | P | PASS |
Mike Jordan
|
|
|
bill Phone #: ###-####
|
BLD-Foundation | 1/22/2009 | 1/23/2009 | 1/23/2009 | P | NR |
Mike Jordan
|
|
|
bill Phone #: ###-####
|
BLD-Footing | 1/20/2009 | 1/21/2009 | 1/21/2009 | A | PASS |
Mike Jordan
|
|
|
Jim-###-####. Exterior permiter footings.
|
Plan assigned to (BSP) | 12/30/2008 | 12/30/2008 | 1/20/2009 | | PASS |
Ben S. Pavelka
|
|
|
1/20/2009 10:20:08 CDM - activity updated through activity BLDA022 from case BLD08-02201.
|
Issue PAID IN FULL permit | | | 1/20/2009 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/20/2009 | | |
|
|
|
|
Routing - PLANNING Land Div | 1/20/2009 | | 1/20/2009 | | PASS |
Todd Tucker
|
|
|
|
Permit Ready to Issue | | | 1/20/2009 | | DONE |
Barbara Stitt
|
|
|
|
Routing - PLANNING Land Div | 1/13/2009 | | 1/13/2009 | | FAIL |
Todd Tucker
|
|
|
No building permits can be issued until the final plat has been recorded.
|
CHANGE STATUS TO (REV) | | | 1/9/2009 | | |
|
|
|
|
Route to Impact Fee Review | 10/13/2008 | 10/16/2008 | 1/8/2009 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLAN CHECK | 12/24/2008 | | 1/8/2009 | | PASS |
Ben S. Pavelka
|
|
|
Plan review complete, waiting for subdivision to be recorded before permits can be issued. (BSP) 1-9-09
|
Case Summary (BLD) | | | 1/8/2009 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/8/2009 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 12/30/2008 | | |
Ben S. Pavelka
|
|
|
|
Routing - PUBLIC WORKS | 12/23/2008 | | 12/24/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing - PLANNING | 12/19/2008 | | 12/23/2008 | | PASS |
Matthew A Halitsky
|
|
|
|
Routing - PLANNING | 10/14/2008 | | 12/19/2008 | | PASS |
Lucinda Grames
|
|
|
See site plan attached to construction plans. Routed to Matt H.
|
Plan resubmittals received | | | 12/9/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Routing - Addressing | 10/14/2008 | | 10/15/2008 | | PASS |
Chris Pichardo
|
|
|
|
Application received | | 10/13/2008 | | | |
|
|
|
|