Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD08-02204
StatusFinaled
Name PARADIGM CONSTRUCTION COMPANY LLC
Site Address 8867 W EVENING STAR LN
Project NamePinetree Village
Customer Number 
ePlanReviewNo
Description
(UNIT 1 BUILDING 16) This permit is for the construction of a new townhouse with four attached units. This is unit 1 that has a total of 1401 square feet with an attached garage of 431 square feet. The main level is 627 square feet with one bathroom, a kitchen, and a covered front porch of 48 square feet. The second story is a total of 774 with three bedrooms and two bathrooms. The setback from the side property line is five feet for this building and will require the eaves to be fire rated to one hour on the underneath side per the detail on the approved plans. Epoxy anchors are being used on the interior walls and these will require a special inspector's sign off that will be provided to the City of Boise inspector on site. SEE COMMENTS FOR ANCHOR INFO. The furnace has been placed in the attic space and will require a walkway in the attic and a working platform, see attached plan review report for details. The separation wall is built to WP 4136 as noted and detailed on the approved plans. This two hour wall may not have any penetrations, the columns in the garage must be placed inside the separation wall. R-2D zoning district, building setbacks, CUP07-00150, CUP08-00058, and DRH08-00043 per Planning and Zoning. Built per all approved plans, red lining, engineering and plan review report. (BSP)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/30/200911/30/200911/30/2009APASS
DetailsMike Jordan
call Jim Phone #: ###-#### Internet Inspection Request from: James Larkin
DOC - Permit Finaled11/30/200911/30/200911/30/2009PPASS
DetailsMike Jordan
cert. of occ. isued.
Zoning Approval8/3/20098/3/20098/3/2009 DONE
DetailsMatthew A Halitsky
BLD-Other4/3/20094/3/20094/3/2009PPASS
DetailsMike Jordan
Jim- building wrap Phone #: ###-####. Verified installation of wheather resistive barrier. ok.
BLD-Framing/Rough-in3/23/20093/23/20093/23/2009PCANC
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/23/2009 at 6:15:29 AM. Contact: ###-####.
BLD-Energy code compliance3/23/20093/23/20093/23/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/23/2009 at 6:15:29 AM. Contact: ###-####. ok for cover.
BLD-Framing/Rough-in3/20/20093/20/20093/20/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/20/2009 at 7:05:09 AM. Contact: ###-####. ok to insul.
BLD-Framing/Rough-in3/9/20093/9/20093/10/2009PPASS
DetailsMike Jordan
Nailing for both layers of 5/8 type x rock from ceiling to under side of roof deck. Also verified fire rated plywood at laydown paraper at overbuild areas.
BLD-Framing/Rough-in3/2/20093/2/20093/2/2009APASS
DetailsMike Jordan
Nailing for 5/8 typex rock on 2hr. walls at over build areas.ok.
BLD-Framing/Rough-in2/24/20092/25/20092/25/2009ACANC
DetailsMike Jordan
Jim Phone #: ###-####
BLD-Framing/Rough-in2/24/20092/24/20092/24/2009PPASS
DetailsMike Jordan
2nd. floor, 2nd layer of 5/8 type x rock for 2hr. wall.
BLD-Framing/Rough-in2/23/20092/24/20092/24/2009ANR
DetailsMike Jordan
Jim This inspection is for the fire wall Phone #: ###-####
BLD-Framing/Rough-in2/23/20092/23/20092/23/2009PCANC
DetailsMike Jordan
jim Phone #: ###-####
BLD-Framing/Rough-in2/19/20092/20/20092/20/2009APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/19/2009 at 9:56:49 PM. Contact: ###-####. 2nd. floor, 1st. layer type x rock for 2hr. wall, both sides.
BLD-Framing/Rough-in2/19/20092/19/20092/19/2009PNR
DetailsMike Jordan
jim - firewalls Phone #: ###-####
BLD-Framing/Rough-in2/18/20092/19/20092/19/2009ANR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/18/2009 at 10:12:57 PM. Contact: ###-####.
BLD-Framing/Rough-in2/18/20092/18/20092/18/2009PPASS
DetailsMike Jordan
Jim Phone #: ###-####. 1st. floor, 2nd. layer, both sides, type x rockfor 2hr. wall.
BLD-Framing/Rough-in2/17/20092/17/20092/17/2009PPART
DetailsMike Jordan
Jim- Fire wall Phone #: ###-####. 1st. floor, 1st. layer type x rock for 2hr. wall, both sides.
BLD-Footing2/12/20092/12/20092/12/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/12/2009 at 7:41:08 AM. Contact: ###-####. Interior footings ok.
BLD-Energy code compliance2/2/20092/3/20092/3/2009APASS
DetailsMike Jordan
jim Phone #: ###-####. Rigid foam insul. on interior side of stemwall. ok.
BLD-Foundation1/29/20091/29/20091/29/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/29/2009 at 7:39:26 AM. Contact: ###-####.
BLD-Foundation1/27/20091/28/20091/28/2009PPASS
DetailsMike Jordan
bill Phone #: ###-####
BLD-Foundation1/22/20091/23/20091/23/2009PNR
DetailsMike Jordan
bill Phone #: ###-####
BLD-Footing1/20/20091/21/20091/21/2009APASS
DetailsMike Jordan
Jim-###-####. Exterior permiter footings ok.
Plan assigned to (BSP)12/30/200812/30/20081/20/2009 PASS
DetailsBen S. Pavelka
1/20/2009 10:22:16 CDM - activity updated through activity BLDA022 from case BLD08-02204.
PLANS/APPL TAKEN TO FRONT DESK  1/20/2009  
Routing - PLANNING Land Div1/20/2009 1/20/2009 PASS
DetailsTodd Tucker
Inspection Record Card- Bld  1/20/2009 DONE
DetailsBarbara Stitt
Permit Ready to Issue  1/20/2009 DONE
DetailsBarbara Stitt
Issue PAID IN FULL permit  1/20/2009 DONE
Details
Routing - PLANNING Land Div1/13/2009 1/13/2009 FAIL
DetailsTodd Tucker
No building permits can be issued until the final plat has been recorded.
CHANGE STATUS TO (REV)  1/9/2009  
Route to Impact Fee Review10/13/200810/16/20081/8/2009 PASS
DetailsCindy M. Gould
Routing - PLAN CHECK12/24/2008 1/8/2009 PASS
DetailsBen S. Pavelka
Plan review complete, waiting for subdivision to be recorded before permits can be issued. (BSP) 1-9-09
Case Summary (BLD)  1/8/2009 DONE
Plans ACCEPTED BY PLAN CHECK  12/30/2008  
DetailsBen S. Pavelka
Routing - PUBLIC WORKS12/23/2008 12/24/2008 PASS
DetailsLouise Waldorf
Routing - PLANNING12/19/2008 12/23/2008 PASS
DetailsMatthew A Halitsky
Routing - PLANNING10/15/2008 12/19/2008 PASS
DetailsLucinda Grames
See site plan attached to construction plans. Routed to Matt H.
Plan resubmittals received  12/9/2008 DONE
DetailsAlexandra L. DeYoung
Routing - Addressing10/15/2008 10/15/2008 PASS
DetailsChris Pichardo
Application received 10/13/2008