Permit NumberBLD08-02205
StatusFinaled
Name PARADIGM CONSTRUCTION COMPANY LLC
Site Address 8913 W EVENING STAR LN
Project NamePinetree Village
Customer Number 
ePlanReviewNo
Description
(Unit 3 Building 15) This permit is for the construction of a new townhouse with three attached units. This is unit 3 that has a total of 1401 square feet with an attached garage of 431 square feet. The main level is 627 square feet with one bathroom, a kitchen, and a covered front porch of 48 square feet. The second story is a total of 774 with three bedrooms and two bathrooms. The setback from the side property line is five feet for this building and will require the eaves to be fire rated to one hour on the underneath side per the detail on the approved plans. Epoxy anchors are being used on the interior walls and these will require a special inspector's sign off that will be provided to the City of Boise inspector on site. SEE COMMENTS FOR ANCHOR INFO. The furnace has been placed in the attic space and will require a walkway in the attic and a working platform, see attached plan review report for details. The separation wall is build to WP4136 as noted and detailed on the approved plans. This two hour wall may not have any penetrations, the columns in the garage must be placed inside the separation wall. R-2D zoning district, building setbacks, CUP07-000150, CUP08-00058, and DRH08-00043 per Planning and Zoning. Built per all approved plans, red lining, engineering and plan review report. (BSP)
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/30/200911/30/200911/30/2009APASS
DetailsMike Jordan
call Jim Phone #: ###-#### Internet Inspection Request from: James Larkin
DOC - Permit Finaled11/30/200911/30/200911/30/2009PPASS
DetailsMike Jordan
Cert. of occ was issued.
Zoning Approval8/3/20098/3/20098/3/2009 DONE
DetailsMatthew A Halitsky
BLD-Other4/3/20094/3/20094/3/2009PPASS
DetailsMike Jordan
Jim- building wrap Phone #: ###-####. Verified installation of weather resistive barrier. ok.
BLD-Framing/Rough-in3/9/20093/9/20093/10/2009PCANC
DetailsMike Jordan
Jim Phone #: ###-####
BLD-Energy code compliance3/6/20093/9/20093/9/2009APASS
DetailsMike Jordan
Jim Phone #: ###-####. ok to rock.
BLD-Framing/Rough-in3/5/20093/5/20093/5/2009PPASS
DetailsMike Jordan
jim Phone #: ###-####. ok to insul.
BLD-Energy code compliance3/5/20093/5/20093/5/2009PCANC
DetailsMike Jordan
jim Phone #: ###-####
BLD-Framing/Rough-in2/23/20092/23/20092/23/2009PCANC
DetailsMike Jordan
jim Phone #: ###-####
BLD-Framing/Rough-in2/19/20092/20/20092/20/2009PCANC
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/19/2009 at 10:01:38 PM. Contact: ###-####.
BLD-Framing/Rough-in2/19/20092/19/20092/19/2009PPART
DetailsMike Jordan
jim - firewalls Phone #: ###-####
BLD-Framing/Rough-in2/18/20092/19/20092/19/2009APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/18/2009 at 5:11:51 PM. Contact: ###-####. 1st. layer type x rock for 2hr. wall from ceiling to roof deck, also verified nailing on type x rock at overbuild sections and rated plywood for 4ft. parapets at overbuild sections.
BLD-Framing/Rough-in2/18/20092/18/20092/18/2009PPASS
DetailsMike Jordan
Jim Phone #: ###-####. 2nd floor, 2nd layer, both sides type x rock for 2hr. wall.
BLD-Framing/Rough-in2/17/20092/17/20092/17/2009PPART
DetailsMike Jordan
Jim- Fire wall Phone #: ###-####. 2nd. floor remaining side typex rock.
BLD-Framing/Rough-in2/11/20092/13/20092/17/2009PPART
DetailsMike Jordan
jim - fire wall Phone #: ###-####. 2nd. floor, 5/8 type x rock, one side for 2hr. wall.
BLD-Framing/Rough-in2/10/20092/11/20092/11/2009PPASS
DetailsMike Jordan
Jim Phone #: ###-####. 1st. floor, 2nd. layer 5/8 type x rock for 2hr. wall, both sides.
BLD-Framing/Rough-in2/10/20092/11/20092/11/2009APART
DetailsMike Jordan
Jim Phone #: ###-####. 1st. floor, tpe x rock for 2hr. wall, remaining side.
BLD-Framing/Rough-in2/10/20092/10/20092/10/2009PPART
DetailsMike Jordan
Jim Phone #: ###-####. 1st. floor, 5/8 type X rock for 2hr. wall, one side only.
BLD-Energy code compliance1/23/20091/23/20091/23/2009PPASS
DetailsMike Jordan
jim Phone #: ###-####. Rigid insul. at interior side of stemwall.
BLD-Foundation1/22/20091/22/20091/22/2009PPASS
DetailsMike Jordan
BLD-Foundation1/21/20091/22/20091/22/2009ANR
DetailsMike Jordan
bill Phone #: ###-####. Rescheduled for pm.
BLD-Footing1/20/20091/21/20091/21/2009APASS
DetailsMike Jordan
Jim-###-####. Exterior perimeter footings.
Plan assigned to (BSP)1/6/20091/6/20091/20/2009 PASS
DetailsCarl D Madsen
1/20/2009 10:23:09 CDM - activity updated through activity BLDA022 from case BLD08-02205.
PLANS/APPL TAKEN TO FRONT DESK  1/20/2009  
Routing - PLANNING Land Div1/20/2009 1/20/2009 PASS
DetailsTodd Tucker
Inspection Record Card- Bld  1/20/2009 DONE
Details
Permit Ready to Issue  1/20/2009 DONE
DetailsBarbara Stitt
Routing - PUBLIC WORKS1/20/2009 1/20/2009 PASS
DetailsLouise Waldorf
Issue PAID IN FULL permit  1/20/2009 DONE
DetailsAlexandra L. DeYoung
Route to Impact Fee Review10/13/200810/16/20081/16/2009 PASS
DetailsCindy M. Gould
Case Summary (BLD)  1/15/2009 DONE
Routing - PLANNING1/9/2009 1/9/2009 PASS
DetailsMatthew A Halitsky
Needs routed to Planning for DR and then to Land division. (BSP)
Plans ACCEPTED BY PLAN CHECK  1/6/2009  
DetailsBen S. Pavelka
Routing - PLANNING12/18/2008 12/19/2008 PASS
DetailsLucinda Grames
see site plan attached to construction plans.
Plan resubmittals received  12/9/2008 DONE
DetailsAlexandra L. DeYoung
Routing - Addressing10/15/2008 10/15/2008 PASS
DetailsChris Pichardo
Routing - PLANNING12/19/2008 1/2/2008 FAIL
DetailsMatthew A Halitsky
DR Mod needed. Notified applicant 1/2/2008.
Application received 10/13/2008   
Routing - PLAN CHECK1/2/2009   PASS
DetailsCarl D Madsen
Needs routed to Planning for DR and then to Land division. (BSP)