Case Summary (BLD) | | | 10/12/2016 | | DONE |
|
|
|
|
Second Notice BLD | 1/2/2009 | 1/2/2009 | 1/5/2009 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 12/11/2008 | 1/2/2009 | | DONE |
|
|
|
|
Permanent Occupancy | | | 12/11/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|
FIRE-Final Inspection | 12/8/2008 | 12/9/2008 | 12/9/2008 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 12/9/2008 | 12/9/2008 | 12/9/2008 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Final | 12/8/2008 | 12/9/2008 | 12/9/2008 | A | NR |
Tom Arcoraci
|
|
|
|
BLD-Final | 12/5/2008 | 12/8/2008 | 12/8/2008 | P | NR |
Tom Arcoraci
|
|
|
doreen Phone #: ###-####
|
FIRE-Final Inspection | 12/5/2008 | 12/8/2008 | 12/8/2008 | A | FAIL |
Troy Cobbley
|
|
|
Still need the dead bolt removed from the gate to the basement and a "Door to remain unlocked while the building is occupied" sticker at the exit as per the original correction notice.
|
FIRE-Final Inspection | 10/31/2008 | 11/3/2008 | 11/3/2008 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given until the items listed on the floor plan have been corrected.
|
BLD-Final | 10/30/2008 | 10/31/2008 | 10/31/2008 | P | NR |
Tony Young
|
|
|
Kristen Phone #: ###-#### on site conf.. need to schedule f/l/s and struct again,, will also need suite #s
|
BLD-Final | 10/22/2008 | 10/23/2008 | 10/23/2008 | A | PEND |
Jim Sly
|
|
|
dorene - after 10:30 please Phone #: ###-#### Re-call after Fire finaled.
|
CHANGE STATUS TO (ISS) | | | 10/20/2008 | | DONE |
|
|
|
|
(F) Reprint permit | | | 10/20/2008 | | DONE |
|
|
|
|
Plan assigned to (R_H) | 10/16/2008 | 10/16/2008 | 10/17/2008 | | PASS |
Ron Hill
|
|
|
10/17/2008 14:27:07 RMH - activity updated through activity BLDA022 from case BLD08-02242.
|
Case Summary (BLD) | | | 10/17/2008 | | DONE |
|
|
|
|
1st review completed | | | 10/17/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/17/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/17/2008 | | DONE |
|
|
|
|
Telephone call | | | 10/17/2008 | | DONE |
Cathy Brown
|
|
|
lft vm with dennis harqiej ###-#### that permit is ready to be picked and already paid for
|
Permit Ready to Issue | | | 10/17/2008 | | DONE |
Cathy Brown
|
|
|
|
Application received | | 10/16/2008 | 10/16/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Routing - PLAN CHECK | 10/16/2008 | | 10/16/2008 | | PASS |
Ron Hill
|
|
|
|