Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD08-02248
StatusFinaled
Name DILLABAUGHS FLOORING AMERICA
Site Address 2895 S FEDERAL WAY
Project NameFLOORING AMERICA
Customer Number 
ePlanReviewNo
Description
**(FLOORING AMERICA)** To remodel an existing 4,795 sq ft tenant space and expand into the adjacent vacant space and to occupy the entire building first and second floors, the new tenant space will have a total area of 35,505 sq. ft. Work to include, selective demolition of interior nonbearing partitions, construction of new interior nonbearing partitions for new show room area, installation of new lighting, and electrical work, miscellaneous related interior finishes. This building is fully fire sprinkled ANY ALTERATIONS TO THE SPRINKLER SYSTEM WILL REQUIRE A SEPARATE PERMIT, and shall be installed and maintained per NFPA #13 as regulated by the fire department. RmH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 7/22/20098/5/2009 DONE
First Notice 3/23/20097/22/2009 DONE
Permanent Occupancy UNPAID FEE  3/23/2009 DONE
DetailsTisha Gallop
BLD-Final3/19/20093/20/20093/20/2009PPASS
DetailsJim Storey
craig Phone #: ###-#### final ok card on site.
FIRE-Final Inspection3/19/20093/20/20093/20/2009APASS
DetailsForrest France
Correction list items field verified for completion, project related FIR permits finaled, additional fire extinguisher at the new sales floor area to be posted as discussed, life safety passed.
FIRE-Final Inspection3/3/20093/4/20093/4/2009AFAIL
DetailsTroy Cobbley
Provide a fire alarm permit for the alarm system modifications required due to the deletion of the exit corridor. Provide a fire sprinkler permit for the deletion of the two pendant heads in the demo'd office. Fix the battery trouble on the existing fire alarm panel. Provide the missing door hardware. Repair the existing emergency light at the bottom of the stairs.
BLD-Final3/3/20093/4/20093/4/2009PNR
DetailsJim Storey
Craig Phone #: ###-####
BLD-Framing/Rough-in12/29/200812/29/200812/29/2008PPASS
DetailsJim Storey
craig Phone #: ###-####
Issue PAID IN FULL permit  10/30/2008 DONE
DetailsAlexandra L. DeYoung
Plan assigned to (R_H)10/17/200810/17/200810/27/2008 PASS
DetailsRon Hill
10/27/2008 07:28:50 RMH - activity updated through activity BLDA022 from case BLD08-02248.
Routing - PLAN CHECK10/17/2008 10/27/2008 PASS
DetailsRon Hill
Routing - FIRE  10/27/2008 PASS
Case Summary (BLD)  10/27/2008 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/27/2008 DONE
Print Occupancy Form  10/27/2008 DONE
Details
Telephone call  10/27/2008 DONE
Details
t/c w steve moore at ###-#### - permit ready and fees given - also need gc name
Permit Ready to Issue  10/27/2008 DONE
Details
1st review completed  10/27/2008 DONE
DetailsRon Hill
Plans ACCEPTED BY PLAN TECH  10/17/2008 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  10/17/2008 DONE
DetailsTisha Gallop
Application received 10/17/2008   
DetailsTisha Gallop