Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD08-02268
StatusFinaled
Name SHY-BEE DESIGN
Site Address 4800 PRODUCTION AVE
Project NameIdaho Timber - Storage Buildin
Customer Number 
ePlanReviewNo
Description
Idaho Timber - Storage Building - **This building is fully Fire Sprinklered** To construct a new, 11,250 square foot, one story, pre-engineered metal storage out building on an existing foundation along with a 114 square foot attached accessory building and a 236 square foot attached accessory building all loss to a previous fire. There is no plumbing work associated with the building. All construction per the Engineering, approved plans, and attached plan review report. Electrical and Fire Sprinkler work requires seperate permits. DRH08-00333 per Planning and Zoning. (SRZ)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 1/8/20101/20/2010 DONE
First Notice 11/22/200912/29/2009 DONE
Permanent Occupancy  11/12/2009 DONE
DetailsTisha Gallop
FIRE-Final Inspection11/10/200911/10/200911/10/2009PPASS
DetailsForrest France
Fire life safety finaled.
BLD-Final11/9/200911/9/200911/9/2009PPASS
DetailsJim Storey
Steve Phone #: ###-#### p&z signed off in computer/ need achd bld final ok.
Zoning Approval11/9/200911/9/200911/9/2009 PASS
DetailsJosh Wilson
FIRE-Final Inspection11/5/200911/5/200911/5/2009PPASS
DetailsForrest France
Fire life safety finaled.
FIRE-Conference10/20/200910/20/200910/20/2009ADONE
DetailsForrest France
Regarding project related fire sprinkler permit work.
BLD-Aging Inspection8/28/20098/28/20099/3/2009 PEND
DetailsJim Storey
pending responce from 316 previouse notes.
BLD-Aging Inspection6/25/20096/25/20096/25/2009 PASS
DetailsJim Storey
wip fir
BLD-Other2/27/20092/27/20092/27/2009PPEND
DetailsJim Sly
Tim- Special inspection- for screws and bolts? Phone #: ###-####
Talked to Tim......Arch/ Eng of record to address issue of special inspections required.
BLD-Conference2/24/20092/24/20092/24/2009PPASS
DetailsJim Storey
Tim Phone #: ###-#### purlin strapping ok to dk roof.
BLD-Footing12/31/200812/31/200812/31/2008PPASS
DetailsTom Arcoraci
Tim- call 30 mins prior to going Phone #: ###-####
Issue PAID IN FULL permit  12/31/2008 DONE
DetailsAlexandra L. DeYoung
Routing Off Site - STRUCTURAL12/24/2008 12/30/2008 PASS
DetailsBarbara Stitt
Called Action Courier for pick up///12-24-08 @ 11:26am BAS
Routing Off Site - STRUCTURAL12/29/2008 12/30/2008 PASS
DetailsAlexandra L. DeYoung
PLANS/APPL TAKEN TO FRONT DESK  12/30/2008 DONE
DetailsSam Zahorka
Print Occupancy Form  12/30/2008 DONE
Details
Telephone call  12/30/2008 DONE
Details
t/c w dennis taggart at ###-#### - permit ready and fees given - also need ACHD receipt
Permit Ready to Issue  12/30/2008 DONE
Details
Routing Off Site - STRUCTURAL12/11/2008 12/30/2008 PASS
DetailsSam Zahorka
Recieved re-submittals for structural reveiwer. Sent to Structural.
Routing - PLAN CHECK12/15/2008 12/30/2008 PASS
DetailsSam Zahorka
Recieved Approval letter from structural reviewer.
Plan assigned to (SRZ)11/14/2008 12/30/2008 PASS
DetailsSam Zahorka
12/30/2008 11:48:47 SRZ - activity updated through activity BLDA022 from case BLD08-02268.
Plan resubmittals received  12/24/2008  
DetailsBarbara Stitt
Received 2 copies of response comments from Shawn Reeder dated 12-23-08 (4 pgs), 3 copies of sheets S-2. 1 copy of everything sent to outside structural and the rest taken to Sam Zahorka
Telephone call  12/24/2008 DONE
DetailsSam Zahorka
Returned Tim Shybee's telephone call and let him know Engineering re-submittals for Foundation were recieved from Shawn Reeder with Performance Engineers. I told him they have been sent to the Structural Reviewer and I should recieve his response by Monday. If all corrections have been made I would be able to issue an Early Start Foundation permit at that time.
Telephone call  12/22/2008 DONE
DetailsSam Zahorka
Tim Shybee called and requested an early foundation permit. After speaking with the Structural Reviewer and recieving his comments an early foundation permit can not be granted until re-submittals are recieved.
Telephone call  12/19/2008 DONE
DetailsSam Zahorka
Spoke with Tim Shybee the contractor and explained the structural reviewer still needs buildings engineering calculations to complete review.
Telephone call  12/19/2008 DONE
DetailsSam Zahorka
Spoke with a Mitch and explained the structural reviewer still needs buildings engineering calculations to complete review.
Routing - FIRE12/11/2008 12/15/2008 PASS
DetailsScott Arellano
Attached updated IFC comments to plans.
Telephone call  12/12/2008 DONE
DetailsSam Zahorka
Called Architect and requested more structural Engineering calculations for the structural reviewer's approval. Architect stated he would send them over.
Routing - PLAN CHECK12/8/2008 12/11/2008 PEND
DetailsSam Zahorka
Pending structural Revisions and Fire to pass.
Plan resubmittals received  12/11/2008 DONE
received 1 fire letter for Scott Arellano and 3 copies of sheet A1,A2 inserted by Dennis Taggart and taken back to Sam Z
Routing - FIRE12/2/200812/2/200812/8/2008 FAIL
DetailsScott Arellano
12/5/08 - *Holding plans* - Pending confirmation of fire flow from private fire hydrant located on proposed building property. Resubmittal items have not been distributed to architect at this time.

*12/8/08* - Fire flow from existing fire hydrant confirmed by United Water. Faxed and emailed resubmittal items to architect.
1st review completed  12/8/2008 FAIL
Failed Structural, Fire
Plan resubmittals received  12/4/2008 DONE
received 3 plan check review comments, and 3 sheets of S-2 inserted by Dennis Taggart. taken back to Fire ( Scott)
Route to Impact Fee Review12/2/200812/5/200812/3/2008 PASS
DetailsCindy M. Gould
Replaces building distroyed by fire in July 2008 CMG
Case Summary (BLD)  12/2/2008 DONE
Routing - PLAN CHECK11/24/2008 12/2/2008 PEND
DetailsSam Zahorka
Pending others to pass. Routed to Fire.
Routing Off Site - STRUCTURAL11/14/2008 11/26/2008 FAIL
DetailsAlexandra L. DeYoung
Recieved structural review comments. Emailed comments applicant.
Routing - PLUMBING11/21/2008 11/24/2008 PASS
DetailsBill VanDegrift
no plumbing
Routing - Erosion and Sediment11/21/2008 11/21/2008 PASS
DetailsSteven Webb
ESC plan waiver approved with attached conditions. ESC08-00923
Routing - PLANNING11/20/2008 11/21/2008 PASS
DetailsJosh Wilson
DRH08-00333-Josh Wilson
Routing - PUBLIC WORKS11/18/2008 11/20/2008 PASS
DetailsBeverly Hall
Routing PW Drainage11/19/2008 11/20/2008 PASS
DetailsBrian Murphy
LESS THAN 10% DRAINAGE BASIN
Routing PW Sewer Rating11/19/2008 11/19/2008 PASS
DetailsConnie Baumgartner
Routing - PLANNING Land Div11/17/2008 11/18/2008 PASS
DetailsJoan Johnson
Lot 3 Boise Industrial Sub
Plan routing begun/NEW & ADDTN  11/17/2008 DONE
DetailsAlexandra L. DeYoung
Plans ACCEPTED BY PLAN CHECK  11/12/2008 DONE
DetailsSam Zahorka
Recieved manufactured steel building drawings.
Plan Reviewer's activity  10/30/2008 DONE
DetailsSam Zahorka
Plans incomplete. Need manufactured steel building drawings and information. Spoke with Dennis Taggert and he said they are in the process of getting. Plan Review on hold until then.
Application received 10/21/200810/21/2008 DONE
DetailsDarla L Downs