Case Summary (BLD) | | | 12/22/2009 | | |
|
|
|
|
Permit EXPIRED | | | 6/19/2009 | | DONE |
Rita DeYoung
|
|
|
BANK HAS TAKEN THIS PROPERTY OVER.
|
BLD-Foundation | 12/4/2008 | 12/8/2008 | 12/8/2008 | A | PASS |
Dave Hannah
|
|
|
bob Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 12/5/2008 | | DONE |
|
|
|
|
BLD-Footing | 11/21/2008 | 11/24/2008 | 11/24/2008 | A | PART |
Mike Jordan
|
|
|
bob Phone #: ###-####. Exterior and interior footings.
|
PubWorks Subgrade Approval | 11/24/2008 | 11/24/2008 | 11/24/2008 | | DONE |
Terry Records
|
|
|
Footing subgrade approved by the geotechnical engineer
|
Issue PAID IN FULL permit | | | 11/20/2008 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 10/30/2008 | 10/30/2008 | 11/3/2008 | | PASS |
Carl D Madsen
|
|
|
11/3/2008 09:07:09 CDM - activity updated through activity BLDA022 from case BLD08-02280.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/3/2008 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/3/2008 | | DONE |
|
|
|
|
Telephone call | | | 11/3/2008 | | DONE |
|
|
|
t/c w bob fink at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 11/3/2008 | | DONE |
|
|
|
|
Route to Impact Fee Review | 10/22/2008 | 10/27/2008 | 10/31/2008 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLAN CHECK | | | 10/30/2008 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 10/30/2008 | | DONE |
|
|
|
|
Routing - FIRE | 10/28/2008 | | 10/28/2008 | | PASS |
Sam Rogers
|
|
|
This house requires a modified NFPA 13D sprinkler system; in addition to the requirements of 13D, the system shall be modified to provide sprinklers in all closets, bathrooms and foyers, and all attached garages shall be protected with a single row of "dry sidewall sprinklers" along the wall between the house and the garage(s). (Bouler Heights Estates No.1 subdivision).
|
Routing - Erosion and Sediment | | | 10/28/2008 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions. ESC08-00927
|
Routing - PLANNING | 10/23/2008 | | 10/27/2008 | | PASS |
Lucinda Grames
|
|
|
Overhang is 3 foot into the setback on west side of the property.
10/27/08-New site plan submitted. Overhang is now at 2 feet into the setback.
|
Routing - PUBLIC WORKS GRADING | 10/27/2008 | | 10/27/2008 | | PASS |
Terry Records
|
|
|
Plan revised to eliminate direct roof drain connection to ACHD storm drain.
|
Routing - PUBLIC WORKS GRADING | | | 10/22/2008 | | FAIL |
Terry Records
|
|
|
Plan indicates a new manhole in ACHD stormdrain that is on adjacent property. Prior to approval of the grading plan this will have to be approved by the adjacent property owner and ACHD.
|
Routing - PUBLIC WORKS | 10/22/2008 | | 10/22/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing - Addressing | 10/22/2008 | | 10/22/2008 | | PASS |
Chris Pichardo
|
|
|
|
Application received | | 10/22/2008 | | | |
|
|
|
|
Pending Assignment by JCB | 10/22/2008 | | | | |
|
|
|
|