Permit Information
Permit NumberBLD08-02331
StatusFinaled
Name COMMUNITY CONTRACTING CORP
Site Address 1020 W MAIN ST Unit: 108
Project NameALASKA BLDG-PLANTINUM SALON
Customer Number 
ePlanReviewNo
Description
(PLATINUM SALON)(SUITE 108) 3/19/09 - PLAN MODIFICATION ADDING A CLOSET AND A PARTITION ON THE MEZZANINE OFFICE LEVEL; MODIFY LIGHTING FIXTURE LAYOUT AND ENERGY CODE COMPLIANCE. DRS Remodel to an existing space to split the space into two tenant areas. This new tenant will be 2,587 sq. ft. and require a Certificate of Occupancy before occupying the space. The adjacent "vanilla finish" tenant will be 2,008 sq. ft. and be done under BLD08-02332, requiring a Letter of Compliance. Work includes construction of 2 x 6, 16'+ high tenant separation wall to divide existing space; new accessible restroom, break room. waiting reception area; a second rear exit to the existing corridor system to access second exit from building and building common areas; installation of salon work stations, interior finishes & millwork. To provide complying guards and handrails at stairs & mezzanine open sides; and upgrade of electrical, mechanical, plumbing and sprinkler system to provide code compliance and meet tenant needs. All per reviewed plans to include red-line notes and attached plan review conditions of all reviewing agencies. NOTE: This building is fully fire sprinklered for substitution of one-hour construction. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 6/1/20098/5/2009 DONE
Permanent Occupancy UNPAID FEE  6/1/2009 DONE
DetailsTisha Gallop
FIRE-Final Inspection5/28/20095/29/20095/29/2009APASS
DetailsForrest France
C/N items are complete, fire life safety inspection passed. NOTE: No inspection card available on site for signature.
BLD-Final5/28/20095/29/20095/29/2009PPASS
DetailsTom Arcoraci
Jim- l Phone #: ###-####
BLD-Final5/27/20095/28/20095/28/2009PNR
DetailsDave Hannah
Jim Phone #: ###-#### needs fire finals first
FIRE-Final Inspection5/27/20095/28/20095/28/2009AFAIL
DetailsForrest France
Project related fire sprinkler permit is still in the "ready to issue" status and must be issued, called for final and approved prior to building life safety final, also noted hardware at the second exit door is not correct.
BLD-Other4/17/20094/17/20094/18/2009PNR
DetailsDave Hannah
Jim- ceiling cover Phone #: ###-#### ok to cover ceiling
Routing - PLAN CHECK4/3/2009 4/3/2009 PASS
DetailsDan Stuart
Received letter from architect reviewing existing wattage in this space prior to remodel and total watts planned as part of this remodel and declaring reduction in watts by 1,200 +. Copy of letter attached to plans and taken to permit desk to issue plan mod.
Telephone call  4/3/2009 DONE
Details
left vm for mark sanders at ###-#### - permit (plan mod) ready and fees given
Override - Parcel Holds  4/3/2009  
Override - Parcel Holds  4/3/2009  
CHANGE STATUS TO (ISS)  4/3/2009 DONE
DetailsTisha Gallop
(F) Reprint permit  4/3/2009 DONE
DetailsTisha Gallop
Routing - PLAN CHECK4/1/2009 4/1/2009 FAIL
DetailsDan Stuart
Modified plans indicate a 2,600 watt increase for lighting above the original reviewed plans for this space. A copy of the original modified plan review with correction requirements ans a cover letter were sent to Mark Sanders. and copied to George Slane, Jason Blais & Dave Hannah.
BLD-Framing/Rough-in3/17/20093/18/20093/20/2009PPASS
DetailsDave Hannah
jim - cover Phone #: ###-####
Plan Modification Accepted  3/19/2009 DONE
Resubmittals provided through Dave Hannah, Structural Inspector.
Override - Parcel Holds3/17/20091/1/19003/17/2009  
rough in cover
Plan resubmittals received  3/12/2009  
DetailsBarbara Stitt
Received 1 cover transmittal, 2 copies of sheets A1.0, A2.0, A3.0 and taken to Dave Hannah's box///3-12-09 @ 11:20am BAS
BLD-Conference3/9/20093/9/20093/9/2009PPASS
DetailsDave Hannah
Jim or Kevin ###-#### Phone #: ###-####
Telephone call  1/23/2009  
DetailsCathy Brown
lft vm with mark sanders ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  1/23/2009 DONE
DetailsCathy Brown
Issue PAID IN FULL permit  1/23/2009 DONE
Plan resubmittals received  1/22/2009  
DetailsDan Stuart
Received 1 response letter to Dan Stuart dated 1-20-09, 1 sheet of exhaust information, 3 copies of sheet A1.0 and taken to Dan Stuart's desk///1/20/09 BAS
PLANS/APPL TAKEN TO FRONT DESK  1/22/2009 PASS
Print Occupancy Form  1/22/2009 DONE
Routing - PLAN CHECK1/8/2009 1/22/2009 PASS
DetailsDan Stuart
Plan resubmittals of 1/20/09 answered previous plan review code compliance concerns in relation to this tenant space. Plans to permit desk to issue.
Plan assigned to (DRS)11/1/2008 1/22/2009 PASS
DetailsDan Stuart
1/22/2009 15:09:12 DRS - activity updated through activity BLDA022 from case BLD08-02331.
Plan Reviewer's activity  1/16/2009 DONE
E-mail to all invloved in meeting of 1/15/, Mark Sanders and Ken Howell. Responsibility of determining if shaft is rated and fire dampers are in place is responsibioity of owner and his agent. Need to open up shaft and ducting to determine complkiance then provide report of findings and proposed action. Reviewed with Mark over phone after he received comments.
Telephone call  1/14/2009 DONE
Talked with Mark Sanders to rehearse basically what Matt & I had discussed. Mark said they were not really sure if there was a rated shaft. I told him of the meeting planned for 1/15/09 with George, Jason, Jenifer and myself to review how and what our approach will be and then I will let him know.
Telephone call  1/9/2009 DONE
Call from Matt Rhees. He is helping Mark Sanders now. 1) Discussed extending the new dryer exhaust vent to the exterior wall in the alley, not using existing shafts. 2) Notes on plans added smoke/fire dampers at shaft penetrations for restroom exhaust and the outside air supply being added to space. I ask about the 22" vertical extension originally proposed. Matt indicated he had talked with original building remodel contractor, Mr. Campbell, for 1983 - 1988 projects and most projects in building, and was told there was no rated shaft and no fire dampers. 3) Told Matt I would get back with him after I discussed situation with Jason Blais.
Plan resubmittals received  1/8/2009 FAIL
Plan resubmittals of 1/6/08 did not address the code concerns and in fact added to the problem by the architect adding smoke fire dampers to all penetrations without extending the ducts all the way up the shaft to the exterior of the building. A fire/smoke damper cannot be installed in a dreyer vent system and the standby emergency power is still required because the duct do not extend to the exterior but depend on a continuously running fan per section 716.5.3 & 909.11, 2006 IBC. Resending last plan review remaining to be addressed to architect with copy to building owner and tenant.
Plan resubmittals requested  1/8/2009 DONE
e-mail to Mark Sanders with copy to Ken Howell.
Routing - PLAN CHECK1/6/2009 1/8/2009 FAIL
DetailsDan Stuart
Previous plan review items needing to be addressed were not addressed and changes to plan Sheet A1.0 added to the problems by calling for smoke/fire damper in dryer duct exhaust.
Plan resubmittals received  1/6/2009  
DetailsDan Stuart
Received 1 cover letter and 3 copies of sheet A1.0 and taken to Dan Stuart's desk 1-6-09 @ 1:50pm BAS
Routing - PLAN CHECK12/29/2008 1/5/2009 FAIL
DetailsDan Stuart
Response to Mark Sanders e-mail on code interpretation for when fire dampers are required and when smoke dampers are required. If ducts extended only 22" up shaft in fully sprinklered building, per the IBC 716.5.3, the dampers are not required when continuace exhaust is provided at top of shaft with emergency standby power. Mark will not address this issue for the new installations proposed and has not indicated he has reviewed what other items of concern are governed by the 2003 IMC and requirements are different than 2006 IBC.
Plan Reviewer's activity  1/5/2009 DONE
Mark Sanders e-mail of 12/29/08 concerning interpretation of Sec 716.5.3 and 909.11 concerning requirement for Standby Power per 2008 NEC. Also exhaust system is required to comply with the 2003 IMC but architect has not provided any indication that he has looked at the situation per the IMC requirements. I attached a modified copy of the plan review to an e-mail response to Mark reiterating items he needs to address.
Plan resubmittals requested  12/19/2008 DONE
E-mail to architect concerning compliance with Code Sec. 909.11 IBC.
Routing - PLAN CHECK12/19/2008 12/19/2008 FAIL
DetailsDan Stuart
Resubmittals inserted. Stanby power requirements and room construction / location were not addressed in resubmittals. E-mail to architect for resubmittals.
Plan resubmittals received  12/18/2008  
DetailsDan Stuart
Received 1 response letter to Dan Stuart dated 12-18-08 from Mark Sanders, 1 copy of intent letter dated 12-16-08 from Nicole Keulman, 3 copies of sheets A1.0, A3.0 and taken to Dan Stuart///12-18-08 BAS
Routing - PLAN CHECK12/3/2008 12/12/2008 FAIL
DetailsDan Stuart
Modified plan review listing items still needing to be addressed e-mailed to Mark Sanders.
Plan resubmittals received  12/10/2008  
DetailsBarbara Stitt
Received 1 response letter to Dan Stuart dated 12-8-08 from Mark Sanders, 2 copies of sheets A1.0, A2.0, A3.0 and taken to Dan Stuart's desk 12-10-08 @ 10:20am BAS
Routing - FIRE12/1/200812/1/200812/3/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  12/3/2008 FAIL
Failed Plan Check
Route to Impact Fee Review12/1/200812/4/200812/1/2008 PASS
DetailsCindy M. Gould
Tenant improvement no impact fee
Plan resubmittals requested  12/1/2008 DONE
Plan review e-mailed to architect - mark@taoidaho.com
Routing - PLAN CHECK11/3/2008 12/1/2008 FAIL
DetailsDan Stuart
Resubmittals required. Plan review e-mailed to architect. Plans routing to fire code analyst for review.
Routing - PUBLIC WORKS11/1/2008 11/3/2008 PASS
DetailsBeverly Hall
Routing PW Sewer Rating11/3/2008 11/3/2008 PASS
DetailsLouise Waldorf
Pending Assignment by JCB10/28/2008 11/1/2008 DONE
DetailsJason Blais
Plans ACCEPTED BY PLAN TECH  10/29/2008 DONE
DetailsAlexandra L. DeYoung
Recd Pcfee & Taken To Pln CK  10/29/2008 DONE
DetailsAlexandra L. DeYoung
Application received 10/28/2008   
DetailsAlexandra L. DeYoung