BLD-Final | 2/25/2009 | 2/25/2009 | 2/25/2009 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/25/2009 at 10:18:26 AM. Contact: ###-####. C/C issued
|
DOC - Permit Finaled | 2/25/2009 | 2/25/2009 | 2/25/2009 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 2/10/2009 | 2/11/2009 | 2/11/2009 | A | PASS |
Jim Sly
|
|
|
Phone ###-####
|
BLD-Framing/Rough-in | 2/10/2009 | 2/10/2009 | 2/11/2009 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/10/2009 at 9:12:12 AM. Contact: ###-####.
|
BLD-Concrete | 1/28/2009 | 1/28/2009 | 1/28/2009 | P | PASS |
Tom Arcoraci
|
|
|
nate Phone #: ###-####
|
Routing Walk-In (Zoning) | 1/26/2009 | 1/26/2009 | 1/26/2009 | P | PASS |
David Moser
|
|
|
1/26/2009 13:54:08 CTC - activity updated through activity BLDI252 from case BLD08-02354. Approved as per CUP08-00137
|
Routing Walk-In (BLD) | 1/26/2009 | 1/26/2009 | 1/26/2009 | P | DONE |
Perry Paine
|
|
|
1/26/2009 15:02:24 PEP - activity updated through activity BLDA022 from case BLD08-02354.
|
Case Summary (BLD) | | | 1/26/2009 | | |
|
|
|
|
Inspection Record Card- Bld | | | 1/26/2009 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/26/2009 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/26/2009 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 10/31/2008 | 10/31/2008 | 10/31/2008 | A | FAIL |
Perry Paine
|
|
|
Detached accessory structure in front of the main structure.
|
Application received | | 10/31/2008 | | | |
|
|
|
|