Information based on query as of Friday, July 5, 2024.
Permit Information
Permit NumberBLD08-02358
StatusFinaled
Name MODERN HOTEL INC
Site Address 1314 W GROVE ST
Project NameMODERN HOTEL
Customer Number 
ePlanReviewNo
Description
(MODERN HOTEL - COMMERCIAL KITCHEN) This building is NOT fire sprinklered. To convert 2 existing hotel suites located on the 1st story of an existing 2 story hotel building to a 492 square foot commercial kitchen to serve an existing bar and patio area. Work is to include a new doorway between the former hotel suites, new wider doors, new doors having a 45-minute fire-protection-rating, kitchen equipment, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW*
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  4/20/2010 DONE
DetailsBarbara Stitt
BLD-Final3/5/20093/6/20093/6/2009APASS
DetailsDave Hannah
David Phone #: ###-#### ok for perm occ
FIRE-Final Inspection3/5/20093/5/20093/5/2009PPASS
DetailsForrest France
Fire life safety final inspection passed.
BLD-Final2/12/20092/13/20092/13/2009AFAIL
DetailsDave Hannah
david Phone #: ###-#### needs 45 min door and fire final
FIRE-Final Inspection2/3/20092/3/20092/3/2009PFAIL
DetailsForrest France
Need to provide current certification tags for the existing fire extinguishers, noted FACP is overdue annual inspection.
Issue PAID IN FULL permit  12/12/2008 DONE
DetailsBarbara Stitt
Routing - PLAN CHECK12/2/2008 12/5/2008 PASS
DetailsCarl Westfall
Completed the resubmittal review. Drawings approved.
Plan assigned to (CJW)11/4/2008 12/5/2008 PASS
DetailsCarl Westfall
12/5/2008 11:14:25 CJW - activity updated through activity BLDA022 from case BLD08-02358.
PLANS/APPL TAKEN TO FRONT DESK  12/5/2008 DONE
Print Occupancy Form  12/5/2008 DONE
Details
Telephone call  12/5/2008 DONE
Details
left message w ashley for dwaine carver at ###-#### - permit ready and fees given
Permit Ready to Issue  12/5/2008 DONE
Details
Plan resubmittals received  12/3/2008  
DetailsCarl Westfall
Rec'd one copy of response letter, and two copies of sheets A1.1, A2.0, and A2.1; taken to Carl W
Routing - FIRE11/26/200811/26/200812/2/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  12/2/2008 FAIL
Failed Plan Check
Route to Impact Fee Review11/26/200812/2/200812/1/2008 PASS
DetailsCindy M. Gould
Routing - PLAN CHECK11/13/2008 11/26/2008 FAIL
DetailsCarl Westfall
The IBC plan review was started on November 24, 2008 and was finished on November 26, 2008. Revised drawings were required. See the plan review report.
Routing - PLUMBING11/7/2008 11/13/2008 PASS
DetailsBill VanDegrift
per plans and 2003 upc
Routing - PUBLIC WORKS11/4/2008 11/7/2008 PASS
DetailsBeverly Hall
Routing PW Environmental11/5/2008 11/6/2008 PASS
DetailsTerry Alber
Routing PW Sewer Rating11/5/2008 11/5/2008 PASS
DetailsLouise Waldorf
Pending Assignment by JCB11/4/2008 11/4/2008 DONE
DetailsJason Blais
Application received 10/31/200810/31/2008 DONE
DetailsAlexandra L. DeYoung
Plans ACCEPTED BY PLAN TECH  10/31/2008  
DetailsAlexandra L. DeYoung
Recd Pcfee & Taken To Pln CK  10/31/2008 DONE
DetailsAlexandra L. DeYoung