Case Summary (BLD) | | | 12/29/2014 | | DONE |
|
|
|
|
Second Notice | | 7/22/2009 | 8/5/2009 | | DONE |
|
|
|
|
First Notice | | 4/13/2009 | 7/22/2009 | | DONE |
|
|
|
|
BLD-Final | 4/10/2009 | 4/13/2009 | 4/13/2009 | A | PASS |
Jim Storey
|
|
|
dale - please call 1/2 hr prior Phone #: ###-#### final ok card on site.
|
Permanent Occupancy | | | 4/13/2009 | | DONE |
Tisha Gallop
|
|
|
|
FIRE-Final Inspection | 4/3/2009 | 4/6/2009 | 4/6/2009 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
BLD-Framing/Rough-in | 3/4/2009 | 3/5/2009 | 3/5/2009 | A | PASS |
Jim Storey
|
|
|
Dale Phone #: ###-####
|
BLD-Framing/Rough-in | 2/25/2009 | 2/26/2009 | 3/2/2009 | A | FAIL |
Jim Storey
|
|
|
dale Phone #: ###-#### no osb allowed in walls per603 type off const./ need backing for ada bars in bathroom.
|
BLD-Footing | 2/17/2009 | 2/18/2009 | 2/18/2009 | A | PART |
Jim Storey
|
|
|
Dale Phone #: ###-#### slab ok
|
BLD-Foundation | 2/9/2009 | 2/10/2009 | 2/10/2009 | P | PART |
Jim Storey
|
|
|
dale Phone #: ###-#### exavation ok for ft no bar in place and si required fot epoxy. si can verify before placment.
|
Issue PAID IN FULL permit | | | 1/23/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
OVERRIDE | | | 12/2/2008 | | |
|
|
|
|
OVERRIDE | | | 12/2/2008 | | |
|
|
|
|
OVERRIDE | | | 12/2/2008 | | |
|
|
|
|
OVERRIDE | | | 12/2/2008 | | |
|
|
|
|
Telephone call | | | 12/2/2008 | | DONE |
|
|
|
t/c w adam at ###-#### - permit ready and fees given
|
Override - Parcel Holds | | | 12/2/2008 | | |
|
|
|
|
Permit Ready to Issue | | | 12/2/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/1/2008 | | 12/1/2008 | | PASS |
Tim L. Woodard
|
|
|
Plans approved refer to Final Plan Review Report.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/1/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 12/1/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/1/2008 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 11/4/2008 | | 12/1/2008 | | PASS |
Tim L. Woodard
|
|
|
12/1/2008 15:06:54 TLW - activity updated through activity BLDA022 from case BLD08-02363.
|
Plan resubmittals received | | | 11/24/2008 | | |
Tim L. Woodard
|
|
|
Rec'd two copies of sheets T1.0, T2.0, A2.0; inserted by arch; taken back to Tim W
|
1st review completed | | | 11/20/2008 | | FAIL |
Tim L. Woodard
|
|
|
Failed plan review.
|
Routing - PUBLIC WORKS | 11/19/2008 | | 11/20/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing - Erosion and Sediment | 11/19/2008 | | 11/19/2008 | | PASS |
Tim L. Woodard
|
|
|
Comply with attached conditions. Waiver letter accepted. TLW
|
Routing - FIRE | | | 11/19/2008 | | PASS |
Tim L. Woodard
|
|
|
Field Verify
|
Routing - PLAN CHECK | | | 11/19/2008 | | FAIL |
Tim L. Woodard
|
|
|
Refer to plan review report.
|
Plans ACCEPTED BY PLAN TECH | | | 11/4/2008 | | DONE |
Darla L Downs
|
|
|
|
Application received | | 11/3/2008 | | | |
|
|
|
|