BLD-Final | 1/27/2010 | 1/28/2010 | 1/28/2010 | A | PASS |
Jim Sly
|
|
|
Leah Phone #: ###-####
|
DOC - Permit Finaled | 1/28/2010 | 1/28/2010 | 1/28/2010 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 1/22/2010 | 1/25/2010 | 1/25/2010 | P | NR |
Jim Sly
|
|
|
Leah please call 30 min before going out Phone #: ###-#### Still need Zoning final and need to verify that a plumbing permit was issued and finaled. (Was not attached to bldg permit) Notified owner.
|
BLD-Aging Inspection | 1/19/2010 | 1/19/2010 | 1/21/2010 | | PASS |
Dave Hannah
|
|
|
c/n on site
|
BLD-Final | 7/17/2009 | 7/17/2009 | 7/18/2009 | P | NR |
Dave Hannah
|
|
|
don Phone #: ###-#### needs zoning final
|
BLD-Framing/Rough-in | 3/12/2009 | 3/12/2009 | 3/12/2009 | P | PASS |
Dave Hannah
|
|
|
Don Phone #: ###-#### ok to cover
|
BLD-Framing/Rough-in | 2/16/2009 | 2/17/2009 | 2/17/2009 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/16/2009 at 8:54:17 AM. front porch ok to cover
|
BLD-Footing | 12/4/2008 | 12/4/2008 | 12/4/2008 | P | NR |
Dave Hannah
|
|
|
don Phone #: ###-####
|
Issue PAID IN FULL permit | | | 12/1/2008 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 11/4/2008 | 11/4/2008 | 11/5/2008 | P | DONE |
Carl D Madsen
|
|
|
11/5/2008 11:56:55 CDM - activity updated through activity BLDA022 from case BLD08-02369.
|
Case Summary (BLD) | | | 11/5/2008 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/5/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/5/2008 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 11/5/2008 | | |
|
|
|
|
Permit Ready to Issue | | | 11/5/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Routing Walk-In (Zoning) | 11/4/2008 | 11/4/2008 | 11/4/2008 | P | PASS |
Sarah Schafer
|
|
|
Approved per DRH08-00356
|
Application received | | 11/4/2008 | | | |
|
|
|
|