Permit Information
Permit NumberBLD08-02393
StatusFinaled
Name HEARTLAND CONSTRUCTION LLC
Site Address 1675 S MAPLE GROVE RD
Project NameCommunity Connection - Bld A
Customer Number 
ePlanReviewNo
Description
Community Connection - Building A - To construct a new 7,800 square foot, one story, wood framed office building and related site improvements. The tenant is a limited office use consisting of instructional independence learning and physical therapy for handicapped individuals. This building will contain play rooms, therapy rooms, offices, conference rooms, reception and waiting area, restrooms, break room and lunch room. This building will be fully fire sprinkled. All construction per the approved plans and attached comment list. DRH07-00579 JCM NEED RP PRIOR TO ISSUANCE. 8-6-09 FINAL CERT OF VALUE $ 925,,347.00 ///DLD
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 7/24/20098/6/2009 DONE
Second Notice 7/22/20098/6/2009 DONE
First Notice 6/29/20097/24/2009 DONE
sent by mail
First Notice 6/29/20097/22/2009 DONE
Permanent Occupancy  6/29/2009 DONE
Permanent Occupancy  6/29/2009 DONE
DetailsAlexandra L. DeYoung
PubWorks Occupancy Approval6/23/20096/23/20096/23/2009 DONE
DetailsTerry Records
Final grading and drainage complete and approved
Zoning Approval6/19/20096/22/20096/22/2009 PASS
DetailsJosh Wilson
BLD-Final6/1/20096/2/20096/2/2009PPART
DetailsMike Jordan
christine Phone #: ###-####. ok for temp occ. Needs to install remaing glazing in doors, provide hc signs and complete firecaulking in riser room.
FIRE-Final Inspection6/1/20096/2/20096/2/2009APASS
DetailsTroy Cobbley
Life Safety Passed
Temporary Occupancy6/2/20098/31/20096/2/2009 DONE
DetailsTisha Gallop
FIRE-Final Inspection6/1/20096/1/20096/1/2009PFAIL
DetailsTroy Cobbley
The northwest exit discharge light failed to operate.
Zoning Approval Temp5/28/20095/28/20095/28/2009 PASS
DetailsJosh Wilson
Temp occ while Building B and remaining site improvements are completed.
BLD-Other5/20/20095/21/20095/21/2009APASS
DetailsMike Jordan
Christine- grid Phone #: ###-####. Grid ok.
BLD-Other5/19/20095/20/20095/20/2009PFAIL
DetailsMike Jordan
Christine- grid Phone #: ###-####. Installed grid not per approved plan.
BLD-Framing/Rough-in4/24/20094/24/20094/24/2009PPASS
DetailsMike Jordan
christine Phone #: ###-####. All issues resolved. Received engineering noting that 2x6 with double top plate is adequate for piont loads. Will have scanned into permit.
BLD-Energy code compliance4/24/20094/24/20094/24/2009PPASS
DetailsMike Jordan
christine Phone #: ###-####
BLD-Framing/Rough-in4/22/20094/23/20094/23/2009APART
DetailsMike Jordan
christine Phone #: ###-####. Needs to add lateral bracing on bottom chords, provide letter from engineer regarding point loads on 2x6 walls. Also needs to provide tbh on truss eg1 and 2.
BLD-Framing/Rough-in4/22/20094/22/20094/22/2009PPART
DetailsMike Jordan
christine Phone #: ###-####. ok to insul. exterior walls and one side only. Needs to provide new truss engineering and sprinkler ri insp.
BLD-Framing/Rough-in3/26/20093/26/20093/26/2009PPART
DetailsMike Jordan
roof inspection-christine Phone #: ###-####. Nailing on roof diaphragm ok. Also gave contractor c/n noting to resubmit mezzanine drawings and all applicable engineering showing bonus truss in leiu of TJI and additional square footage added.
BLD-Framing/Rough-in3/20/20093/23/20093/23/2009APART
DetailsMike Jordan
building a only please--shear nail christine Phone #: ###-####. Shear nailing on exterior walls only. ok.
FIRE-Conference3/17/20093/17/20093/17/2009PDONE
DetailsTroy Cobbley
I spoke to Brian Johnson with Shilo Automatic Sprinkler about the sizing of the piping from the FDC to the floating main. I gave my interpretation of NFPA 13-8.17.2 but defered him to Tim Frost. The entry is being made under this permit due to the overhead sprinkler permit not being issued at this time.
BLD-Foundation3/3/20093/4/20093/4/2009APASS
DetailsMike Jordan
Ian Phone #: ###-####. Stemwall for dumpster enclosure ok.
BLD-Foundation3/2/20093/3/20093/3/2009APASS
DetailsMike Jordan
ian Phone #: ###-####. Perimeter stemwalls and column pad pdestals. ok.
BLD-Footing2/27/20092/27/20092/27/2009PPASS
DetailsMike Jordan
Ian Phone #: ###-####. Perimeter footings and column pad footings ok.
BLD-Footing2/27/20092/27/20092/27/2009PCANC
DetailsMike Jordan
ian Phone #: ###-####
BLD-Footing2/25/20092/26/20092/26/2009PNR
DetailsMike Jordan
ian Phone #: ###-####. Contractor will reschedule insp.
Issue PAID IN FULL permit  2/24/2009 DONE
Telephone call  2/18/2009 DONE
DetailsAlexandra L. DeYoung
LM for chad with Dave- permit ready, fees given, also need ACHD and RP
Permit Ready to Issue  2/18/2009 DONE
DetailsAlexandra L. DeYoung
Plan assigned to (JCM)11/12/2008 2/17/2009 PASS
DetailsJohn Menard
2/17/2009 15:07:54 JCM - activity updated through activity BLDA022 from case BLD08-02393.
Routing - PLAN CHECK1/30/2009 2/17/2009 PASS
DetailsJohn Menard
Plan resubmittals received  2/17/2009  
DetailsJohn Menard
Received transmittal and two copies of pages A2.1, A2.3; inserted by Architect and taken back to John Menard
Plan Reviewer's activity  2/17/2009 PASS
DetailsJohn Menard
Reviewed and approved final revised plans with red lined notes and attached plan review clarification notes. JCM
PLANS/APPL TAKEN TO FRONT DESK  2/17/2009 DONE
DetailsJohn Menard
Print Occupancy Form  2/17/2009 DONE
DetailsAlexandra L. DeYoung
Routing - FIRE1/29/2009 1/30/2009 PASS
DetailsScott Arellano
Attached updated IFC comments to plans.
Plan resubmittals requested  1/29/2009 DONE
DetailsJohn Menard
E-mailed the architect requesting additional revisions. JCM
Plan Reviewer's activity  1/29/2009 PASS
DetailsJohn Menard
Reviewed and approved structural revisions. JCM
Plan resubmittals received  1/28/2009  
DetailsJohn Menard
Rec'd four copies of sheets- S0.1, S1.1, S3.1, S5.1, FP1.0, A2.1, A2.3, & A9.1 and four copies of structural calcs- inserted by architect- taken to John M
Routing - PLUMBING12/12/2008 12/12/2008 PASS
DetailsBill VanDegrift
per plans and 2003 upc
Routing - PUBLIC WORKS12/10/2008 12/12/2008 PASS
DetailsBeverly Hall
Routing PW Sewer Design11/14/2008 12/11/2008 PASS
DetailsJon R. Gunnerson
Connect onto existing 6-inch service provided.
Routing PW Drainage12/10/2008 12/10/2008 PASS
DetailsTerry Records
Routing - PLAN CHECK12/8/2008 12/10/2008  
Routing - FIRE12/3/200812/3/200812/8/2008 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
1st review completed  12/8/2008 FAIL
Failed PW, Plan Check, Fire
Plan resubmittals received  12/4/2008  
DetailsBarbara Stitt
Received 9 sets of sheets C2, C3, C4, C5, C6 were inserted into plans BLD08-02293, and BLD08-02295 and sheets C2 & C3 into BLD08-02292 by architects office and returned to desks taken from 12-4-08 BAS
Route to Impact Fee Review12/3/200812/8/200812/3/2008 PASS
DetailsCindy M. Gould
Routing - PLAN CHECK12/3/2008 12/3/2008 FAIL
DetailsJohn Menard
Routing - PLANNING11/20/2008 12/3/2008 PASS
DetailsSue Cummings
CAR07-00070 & CUP07-00177
Plan resubmittals requested  12/2/2008 DONE
DetailsJohn Menard
E-mailed the architect a copy of the plan review requesting revisions. JCM
Plan resubmittals requested  11/25/2008 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural plan review comment requesting revisions. JCM
Routing Off Site - STRUCTURAL11/12/2008 11/25/2008 FAIL
DetailsJohn Menard
Called Action Couriers for pick up -Received comment list from consulting structural engineer requesting revisions. JCM
Routing - PLANNING11/20/2008 11/20/2008 PASS
DetailsJosh Wilson
DRH07-00597-Josh Wilson PASS
CUP07-00177- Sue Cummings
Routing - PLUMBING11/18/2008 11/20/2008 FAIL
DetailsBill VanDegrift
need to pass sewer design prior to plumbing review acceptance.
Routing - Erosion and Sediment11/17/2008 11/18/2008 PASS
DetailsSteven Webb
ESC plan approved with attached conditions. ESC08-00979
Routing PW Solid Waste11/17/2008 11/17/2008 PASS
DetailsPeter J. McCullough
Routing PW Drainage11/17/2008 11/17/2008 FAIL
DetailsBrian Murphy
grading plan failed
Routing PW Street Lights  11/17/2008 PASS
DetailsHank Alarcon
Routing - PUBLIC WORKS11/14/2008 11/17/2008 FAIL
DetailsLouise Waldorf
Refer to Sewer Design - Jon Gunnerson and Drainage - Terry Records.
Routing - PLANNING Land Div11/12/2008 11/14/2008 PASS
DetailsTodd Tucker
property has not changed since it was annexed into the city.
Routing PW Sewer Rating11/14/2008 11/14/2008 PASS
DetailsConnie Baumgartner
Application received 11/10/200811/12/2008 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  11/12/2008 DONE
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  11/12/2008 DONE
DetailsBarbara Stitt
Routing PW Sewer Design12/10/2008    
DetailsJon R. Gunnerson
Routing - PLAN CHECK12/12/2008