Permit Information
Permit NumberBLD08-02394
StatusFinaled
Name DATUM CONSTRUCTION MANAGEMENT INC
Site Address 2333 S APPLE ST
Project NameBLUE COW FROZEN YOGURT
Customer Number 
ePlanReviewNo
Description
(BLUE COW FROZEN YOGURT) To build out an 1,800 sq. ft. portion of a SHELL building (BLD07-03193) for a new tenant. Work includes construction of interior non-bearing walls to create a dining area, office, work/service area, two fully accessible restrooms, a kitchen, maintenance room and a corridor to access all areas and as an exit. Work will include electrical, mechanical and plumbing construction. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 3/4/20098/5/2009 DONE
Permanent Occupancy  3/4/2009 DONE
DetailsTisha Gallop
BLD-Final3/2/20093/3/20093/3/2009APASS
DetailsJim Storey
Jim Phone #: ###-#### c/n made ok card on site and signed.
FIRE-Final Inspection3/2/20093/2/20093/2/2009PPASS
DetailsForrest France
Field verified correction item has been completed, fire life safety finaled.
BLD-Final2/23/20092/26/20092/26/2009PPART
DetailsDave Hannah
jim - late afternoon please Phone #: ###-#### ok for temp occ. needs tactile exit signs and lower mirrors over lavatories
FIRE-Final Inspection2/24/20092/25/20092/25/2009APART
DetailsTroy Cobbley
A temporary occupancy was given until one of the main entry/exit doors is provided with approved single action hardware and the locking hardware is removed.
FIRE-Final Inspection2/23/20092/24/20092/24/2009PCANC
DetailsTroy Cobbley
due to time constraints
BLD-Framing/Rough-in1/9/20091/9/20091/9/2009PPASS
DetailsJim Storey
JIM Phone #: ###-#### c/n made ok
BLD-Framing/Rough-in1/2/20091/5/20091/5/2009APART
DetailsJim Storey
jason Phone #: ###-#### screw top track at soffit to suuds at soffit cantalever. need hvac.
Plan assigned to (DRS)11/10/200811/10/200812/15/2008 PASS
DetailsDan Stuart
12/15/2008 12:00:54 DRS - activity updated through activity BLDA022 from case BLD08-02394.
Routing - FIRE12/12/2008 12/15/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  12/15/2008 FAIL
Failed Plan Check
Routing - PLAN CHECK12/15/2008 12/15/2008 PASS
DetailsDan Stuart
To permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  12/15/2008 PASS
Print Occupancy Form  12/15/2008 DONE
Details
Print Occupancy Form  12/15/2008 DONE
Telephone call  12/15/2008 DONE
Details
t/c w ed webber at ###-#### - permit ready and fees given - also need gc name, rce# and rp name
Permit Ready to Issue  12/15/2008 DONE
Details
Issue PAID IN FULL permit  12/15/2008  
Routing - PUBLIC WORKS12/12/2008 12/12/2008 PASS
DetailsLouise Waldorf
Added fee for drinking fountains
Routing - PLAN CHECK12/5/2008 12/11/2008 PEND
DetailsDan Stuart
Inserted resubmittals into plans. Routed back to PW for drinking fountain fees and then to fire code analyst.
Plan resubmittals received  12/11/2008  
received transmittal from brs arch & "3" sheets of responses from brs & "1 sheet from plumbing plan review & "3" sets of comments (4) pages each from stapley engineering --also "3" sets of plans with each sheet of A1.1, A1.2, A3.1, A6.1, A7.1, A9.1, A10.1, k1.1, MO.O, MO.1, H1.O, P1.O, P2.1, EO.O, E2.OF, E2.OL, E2.OMP, E2.OP, E2.OS, E3.O, E4.O, E4.1, & E4.2, --plans taken to Dan Stuart
Routing - FIRE12/3/200812/3/200812/5/2008 CANC
DetailsScott Arellano
Routed back to plan review for floor plan design change.
Route to Impact Fee Review12/3/200812/8/200812/4/2008 PASS
DetailsCindy M. Gould
Tenant improvement in existing building
Plan resubmittals requested  12/3/2008 DONE
Plan review e-mailed to architect for resubmittal requirements.
Routing - PLAN CHECK11/24/2008 12/3/2008 FAIL
DetailsDan Stuart
Copy of plan review items needing corrected e-mailed to architect. Plans to fire code analyst for review.
Routing - PLUMBING11/20/2008 11/24/2008 PASS
DetailsBill VanDegrift
water to0 yogurt mechines will be mreduced to 3/4" install over floorb sinkj or janitor sink. r.p. for coffee maker to be located over a floor sink. r.p. on the service isn't required by the plumbing code. if backflow preventor is installed use dcva.
Routing - Erosion and Sediment11/19/2008 11/20/2008 PASS
DetailsSteven Webb
ESC plan waiver approved with attached conditions. ESC08-00980
Routing - PLANNING11/13/2008 11/13/2008 PASS
DetailsSarah Schafer
Approved.
Routing - PUBLIC WORKS11/12/2008 11/13/2008 PASS
DetailsBeverly Hall
Routing PW Sewer Rating11/13/2008 11/13/2008 PASS
DetailsLouise Waldorf
Plans ACCEPTED BY PLAN TECH  11/10/2008 DONE
DetailsDarla L Downs
Recd Pcfee & Taken To Pln CK  11/10/2008 DONE
Application received 11/10/2008