First Notice | | 3/4/2009 | 8/5/2009 | | DONE |
|
|
|
|
Permanent Occupancy | | | 3/4/2009 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 3/2/2009 | 3/3/2009 | 3/3/2009 | A | PASS |
Jim Storey
|
|
|
Jim Phone #: ###-#### c/n made ok card on site and signed.
|
FIRE-Final Inspection | 3/2/2009 | 3/2/2009 | 3/2/2009 | P | PASS |
Forrest France
|
|
|
Field verified correction item has been completed, fire life safety finaled.
|
BLD-Final | 2/23/2009 | 2/26/2009 | 2/26/2009 | P | PART |
Dave Hannah
|
|
|
jim - late afternoon please Phone #: ###-#### ok for temp occ. needs tactile exit signs and lower mirrors over lavatories
|
FIRE-Final Inspection | 2/24/2009 | 2/25/2009 | 2/25/2009 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given until one of the main entry/exit doors is provided with approved single action hardware and the locking hardware is removed.
|
FIRE-Final Inspection | 2/23/2009 | 2/24/2009 | 2/24/2009 | P | CANC |
Troy Cobbley
|
|
|
due to time constraints
|
BLD-Framing/Rough-in | 1/9/2009 | 1/9/2009 | 1/9/2009 | P | PASS |
Jim Storey
|
|
|
JIM Phone #: ###-#### c/n made ok
|
BLD-Framing/Rough-in | 1/2/2009 | 1/5/2009 | 1/5/2009 | A | PART |
Jim Storey
|
|
|
jason Phone #: ###-#### screw top track at soffit to suuds at soffit cantalever. need hvac.
|
Plan assigned to (DRS) | 11/10/2008 | 11/10/2008 | 12/15/2008 | | PASS |
Dan Stuart
|
|
|
12/15/2008 12:00:54 DRS - activity updated through activity BLDA022 from case BLD08-02394.
|
Routing - FIRE | 12/12/2008 | | 12/15/2008 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 12/15/2008 | | FAIL |
|
|
|
Failed Plan Check
|
Routing - PLAN CHECK | 12/15/2008 | | 12/15/2008 | | PASS |
Dan Stuart
|
|
|
To permit desk to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/15/2008 | | PASS |
|
|
|
|
Print Occupancy Form | | | 12/15/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/15/2008 | | DONE |
|
|
|
|
Telephone call | | | 12/15/2008 | | DONE |
|
|
|
t/c w ed webber at ###-#### - permit ready and fees given - also need gc name, rce# and rp name
|
Permit Ready to Issue | | | 12/15/2008 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/15/2008 | | |
|
|
|
|
Routing - PUBLIC WORKS | 12/12/2008 | | 12/12/2008 | | PASS |
Louise Waldorf
|
|
|
Added fee for drinking fountains
|
Routing - PLAN CHECK | 12/5/2008 | | 12/11/2008 | | PEND |
Dan Stuart
|
|
|
Inserted resubmittals into plans. Routed back to PW for drinking fountain fees and then to fire code analyst.
|
Plan resubmittals received | | | 12/11/2008 | | |
|
|
|
received transmittal from brs arch & "3" sheets of responses from brs & "1 sheet from plumbing plan review & "3" sets of comments (4) pages each from stapley engineering --also "3" sets of plans with each sheet of A1.1, A1.2, A3.1, A6.1, A7.1, A9.1, A10.1, k1.1, MO.O, MO.1, H1.O, P1.O, P2.1, EO.O, E2.OF, E2.OL, E2.OMP, E2.OP, E2.OS, E3.O, E4.O, E4.1, & E4.2, --plans taken to Dan Stuart
|
Routing - FIRE | 12/3/2008 | 12/3/2008 | 12/5/2008 | | CANC |
Scott Arellano
|
|
|
Routed back to plan review for floor plan design change.
|
Route to Impact Fee Review | 12/3/2008 | 12/8/2008 | 12/4/2008 | | PASS |
Cindy M. Gould
|
|
|
Tenant improvement in existing building
|
Plan resubmittals requested | | | 12/3/2008 | | DONE |
|
|
|
Plan review e-mailed to architect for resubmittal requirements.
|
Routing - PLAN CHECK | 11/24/2008 | | 12/3/2008 | | FAIL |
Dan Stuart
|
|
|
Copy of plan review items needing corrected e-mailed to architect. Plans to fire code analyst for review.
|
Routing - PLUMBING | 11/20/2008 | | 11/24/2008 | | PASS |
Bill VanDegrift
|
|
|
water to0 yogurt mechines will be mreduced to 3/4" install over floorb sinkj or janitor sink. r.p. for coffee maker to be located over a floor sink. r.p. on the service isn't required by the plumbing code. if backflow preventor is installed use dcva.
|
Routing - Erosion and Sediment | 11/19/2008 | | 11/20/2008 | | PASS |
Steven Webb
|
|
|
ESC plan waiver approved with attached conditions. ESC08-00980
|
Routing - PLANNING | 11/13/2008 | | 11/13/2008 | | PASS |
Sarah Schafer
|
|
|
Approved.
|
Routing - PUBLIC WORKS | 11/12/2008 | | 11/13/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Sewer Rating | 11/13/2008 | | 11/13/2008 | | PASS |
Louise Waldorf
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/10/2008 | | DONE |
Darla L Downs
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/10/2008 | | DONE |
|
|
|
|
Application received | | 11/10/2008 | | | |
|
|
|
|