Third Notice | | 10/9/2009 | 10/7/2009 | | DONE |
|
|
|
Final values and fees calculated together with Bld09-00337 and Bld08-02428; all final fees were charged on the TI permit Bld09-00337.
|
Second Notice | | 9/27/2009 | 9/29/2009 | | DONE |
|
|
|
|
First Notice | 8/28/2009 | 8/28/2009 | 9/17/2009 | | DONE |
Jim Storey
|
|
|
|
BLD-Final | 8/27/2009 | 8/28/2009 | 8/28/2009 | A | PASS |
Jim Storey
|
|
|
kelly Phone #: ###-####
|
DOC - Permit Finaled | 8/28/2009 | 8/28/2009 | 8/28/2009 | P | PASS |
Jim Storey
|
|
|
|
Inspection Record Card- Bld | | | 8/24/2009 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/24/2009 | | DONE |
|
|
|
|
Zoning Approval Temp | 8/4/2009 | 8/4/2009 | 8/4/2009 | | PASS |
Josh Wilson
|
|
|
Bonded improvements have been completed and bond may be released. Will hold final occupancy for completion of signs required by CUP.
|
BLD-Aging Inspection | 8/3/2009 | 8/3/2009 | 8/3/2009 | | PASS |
Jim Storey
|
|
|
p$z has bond posted until nov.
|
BLD-Conference | 6/3/2009 | 6/3/2009 | 6/3/2009 | P | PART |
Jim Storey
|
|
|
shell ok to the point of life saftey and bonded for completion of work with p&z. ec and bld finals to be performed on unleased area north of ti.
|
Zoning Approval Temp | 6/3/2009 | 6/3/2009 | 6/3/2009 | | PASS |
Josh Wilson
|
|
|
Bond for $21,202.50 has been submitted for incomplete landscaping, stucco, and parking striping. Temporary occ until November 3, 2009.
|
FIRE-Final Inspection | 6/2/2009 | 6/2/2009 | 6/2/2009 | P | PASS |
Forrest France
|
|
|
Building shell life safety inspection completed okay, hardware at the west exit doors to be made compliant prior to occupancy approvals.
|
BLD-Conference | 5/14/2009 | 5/14/2009 | 5/14/2009 | P | PASS |
Jim Storey
|
|
|
recieved si and engineers letter to resolve hold downs. ok to insulate.
|
Additional plans submitted | | | 5/14/2009 | | DONE |
Tisha Gallop
|
|
|
received Epoxy Inspection Report; put in Jim Story's box, notified him it was recieved.
|
BLD-Foundation | 3/24/2009 | 3/25/2009 | 3/25/2009 | A | PASS |
Jim Storey
|
|
|
Ian Phone #: ###-####
|
BLD-Footing | 3/24/2009 | 3/25/2009 | 3/25/2009 | A | PASS |
Jim Storey
|
|
|
dane Phone #: ###-####
|
Meeting | | | 3/12/2009 | | DONE |
Sam Zahorka
|
|
|
Meeting with Kelly Fisher about his under slab plumbing for future tenant. Under slab plumbing is approved on plans for Shell permit. No above slab plumbing/fixtures allowed under shell permit. Tenant Improvement permit required for above slab work. SRZ
|
BLD-Framing/Rough-in | 2/17/2009 | 2/17/2009 | 2/17/2009 | P | PART |
Jim Storey
|
|
|
Wall sheeting Phone #: ###-#### nailling ok missing hold downs 4 locations 2 east 2 west center of bldg. pending engineering to resolve.
|
Override - Parcel Holds | 2/17/2009 | 1/1/1900 | 2/17/2009 | | |
|
|
|
framing
|
BLD-Framing/Rough-in | 2/5/2009 | 2/6/2009 | 2/6/2009 | A | PART |
Jim Storey
|
|
|
kelly fisher Phone #: ###-#### roof perimitor nailling ok to build crickets.
|
Override - Parcel Holds | 2/5/2009 | 1/1/1900 | 2/5/2009 | | |
|
|
|
framing only
|
CHANGE STATUS TO (ISS) | | | 2/4/2009 | | DONE |
|
|
|
mod fee paid and back to issue
|
Plan assigned to (JCM) | 1/23/2009 | 1/23/2009 | 1/26/2009 | | PASS |
John Menard
|
|
|
1/26/2009 09:36:41 JCM - activity updated through activity BLDA022 from case BLD08-02428.
|
Plan Reviewer's activity | | | 1/26/2009 | | PASS |
John Menard
|
|
|
Reviewed and approved structural plan modification to change the buildings roof structural supports from exterior walls and center beam and columns to only the exterior walls and full span roof trusses. JCM
|
Routing - PLAN CHECK | 1/23/2009 | | 1/26/2009 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/26/2009 | | DONE |
John Menard
|
|
|
|
Print Occupancy Form | | | 1/26/2009 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 1/23/2009 | | DONE |
Barbara Stitt
|
|
|
Plan modification accepted for the removalof center beam and revision to clear span building. 3 copies of the following submitted sheets S0.1, S1.1, S2.1, S5.1, S7.1, S7.2, S7.3 and 3 sets of revised structural calculations. Plans taken to Dan Stuart.
|
BLD-Foundation | 1/14/2009 | 1/14/2009 | 1/14/2009 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 1/14/2009 at 11:22:25 AM. Contact: ###-####.walls ok pending center ft pads
|
BLD-Footing | 1/13/2009 | 1/13/2009 | 1/13/2009 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 1/13/2009 at 9:41:32 AM. Contact: ###-####.
|
Issue PAID IN FULL permit | | | 1/7/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
CHANGE STATUS TO (RDY) | | | 12/10/2008 | | DONE |
|
|
|
|
Telephone call | | | 12/10/2008 | | DONE |
|
|
|
Called Kelly permit ready and fee given Also need ACHD & RP for ESC
|
Plan resubmittals received | | | 12/9/2008 | | DONE |
|
|
|
received plumbing comment response letter given to Bill Vandegrift.
|
Routing - PLUMBING | 12/9/2008 | | 12/9/2008 | | PASS |
Bill VanDegrift
|
|
|
will have easement to sherwood or sewer to ann morrison prior to final per letter dated 12/4/08- resubmitted dated 12/9/08.
|
Routing - PLAN CHECK | 12/9/2008 | | 12/9/2008 | | PASS |
John Menard
|
|
|
|
Plan Reviewer's activity | | | 12/9/2008 | | PASS |
John Menard
|
|
|
Reviewed and approved the requested structural revisions. JCM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/9/2008 | | DONE |
John Menard
|
|
|
|
Inspection Record Card- Bld | | | 12/9/2008 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 11/18/2008 | | 12/9/2008 | | PASS |
John Menard
|
|
|
12/9/2008 14:52:56 JCM - activity updated through activity BLDA022 from case BLD08-02428.
|
Routing - FIRE | 12/3/2008 | 12/3/2008 | 12/8/2008 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing PW Sewer Design | 11/19/2008 | | 12/8/2008 | | PASS |
Jon R. Gunnerson
|
|
|
Plans approved per letter dated 12/04/2008 from Joe Thompson to Boise Building Dept., New sewer connections will require tap permit.
|
1st review completed | | | 12/8/2008 | | FAIL |
|
|
|
Failed PW, Structural
|
Routing - PUBLIC WORKS | 12/8/2008 | | 12/8/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Drainage | 12/8/2008 | | 12/8/2008 | | PASS |
Brian Murphy
|
|
|
|
Plan resubmittals received | | | 12/5/2008 | | |
John Menard
|
|
|
Rec'd one transmittal letter, and response letter, and three copies of sheets S0.1, S2.1, & S7.3; taken back to fire review
|
Route to Impact Fee Review | 12/3/2008 | 12/8/2008 | 12/4/2008 | | PASS |
Cindy M. Gould
|
|
|
|
Plan Reviewer's activity | | | 12/3/2008 | | PASS |
John Menard
|
|
|
Reviewed and approved shell plans for nonstructural code requirements. JCM
|
Routing - PLANNING | 12/1/2008 | | 12/3/2008 | | PASS |
Josh Wilson
|
|
|
OK per DRH08-00321
|
Routing - PLAN CHECK | 12/3/2008 | | 12/3/2008 | | PASS |
John Menard
|
|
|
|
Routing - PLUMBING | 11/26/2008 | | 12/1/2008 | | FAIL |
Bill VanDegrift
|
|
|
pass grading review prior tp shell approval
|
Plan resubmittals requested | | | 12/1/2008 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the structural plan review requeting revisions. JCM
|
Routing - Erosion and Sediment | 11/25/2008 | | 11/26/2008 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions. ESC08-00994
|
Routing - PUBLIC WORKS | 11/19/2008 | | 11/25/2008 | | FAIL |
Connie Baumgartner
|
|
|
|
Routing PW Solid Waste | 11/24/2008 | | 11/25/2008 | | PASS |
Peter J. McCullough
|
|
|
|
Routing Off Site - STRUCTURAL | 11/19/2008 | | 11/25/2008 | | FAIL |
John Menard
|
|
|
called Action couriers for pick up - Received comment list requesting revisions. JCM
|
Routing PW Street Lights | 11/20/2008 | | 11/24/2008 | | PASS |
Hank Alarcon
|
|
|
|
Routing PW Drainage | 11/24/2008 | | 11/24/2008 | | FAIL |
Brian Murphy
|
|
|
NEED CROSSDRAINAGE ACCESS AGREEMENT . BRIAN MURPHY ###-####
|
Plan resubmittals received | | | 11/21/2008 | | DONE |
Barbara Stitt
|
|
|
Received 1 cover sheet and 2 copies of sheet P1.1 from courier service//11-20-08 Contacted Shelly with Musgrove to find out which permit set the plans were to be inserted into and advise that someone from her office needed to come down and insert them.//11-20-08
|
Plan resubmittals received | | | 11/21/2008 | | DONE |
Barbara Stitt
|
|
|
Spoke with Walt Baumgartner to explain the process that the engineer and/or architects office is to insert resubmitals in routing plans and clarifed that the resubmitals of sheets P1.1 were to go into the sheel permit///11-21-08 @ 8:30am BAS
|
Routing PW Environmental | 11/21/2008 | | 11/21/2008 | | PASS |
Walt Baumgartner
|
|
|
Approved - resubmit plumbing sheets ok, shows first tenant space plumbing routed to grease line.
|
Routing PW Environmental | | | 11/20/2008 | | FAIL |
Walt Baumgartner
|
|
|
Shell & core shows plumbing for one tenant space. Directed mechanical engineer to resubmit new plumbing sheets to show floor drain, floor sink and wall hard plumb connections for future sinks routed to segragated grease line and 1500 gallon GI shown.
|
Plan resubmittals received | | | 11/20/2008 | | |
|
|
|
received letter of transmittal from musgrove eng. & "2" sheets each of P1.1-- the inserter is shelly weatherby
|
Routing PW Sewer Rating | 11/19/2008 | | 11/19/2008 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING Land Div | 11/19/2008 | | 11/19/2008 | | PASS |
Joan Johnson
|
|
|
confernce with suprvsr - configuration indicates only one split since 1978, - Ok per DAA,
one time split of bld parcel
|
Plans ACCEPTED BY PLAN TECH | | | 11/18/2008 | | DONE |
Darla L Downs
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 11/18/2008 | | DONE |
|
|
|
|
Pending Assignment by JCM | 11/18/2008 | | 11/18/2008 | | BLDA |
John Menard
|
|
|
11/18/2008 15:47:28 JCM - activity updated through activity BLDA166 from case BLD08-02428.
|
Application received | | 11/17/2008 | 11/17/2008 | | DONE |
Darla L Downs
|
|
|
|
Routing PW Sewer Design | | | | | |
Jon R. Gunnerson
|
|
|
|
Routing - PUBLIC WORKS | 12/8/2008 | | | | |
Bill VanDegrift
|
|
|
|