Permit Information
Permit NumberBLD08-02429
StatusFinaled
Name KELLY FISHER CONSTRUCTION LLC
Site Address 1265 S CAPITOL BLVD
Project NameGRADING & DRAINAGE
Customer Number 
ePlanReviewNo
Description
Must have valid RP prior to issuance of permit. Grading and Drainage To grub, clean, excavate, grade, import and compact site earth materials in preparation for the future construction of a retail shell building . No structural construction is allowed under this permit. All Grading work is subject to the Grading and Drainage Plans Approved by the Public Works Department. (DRH # 08-00321 ).
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection8/3/20098/3/20098/3/2009 PASS
DetailsJim Storey
DOC - Permit Finaled8/3/20098/3/20098/3/2009PPASS
DetailsJim Storey
BLD-Conference6/3/20096/3/20096/3/2009PPART
DetailsJim Storey
tr signed off for pw/ on temp with p/z
PubWorks Occupancy Approval6/3/20096/3/20096/3/2009 DONE
DetailsTiffany Lowery
BLD-Aging Inspection3/11/20093/11/20093/12/2009 PART
DetailsJim Storey
wip
CHANGE STATUS TO (RDY)  12/10/2008 DONE
Telephone call  12/10/2008  
Called Kelly permit ready and fee given Also need RP for ESC
Issue PAID IN FULL permit  12/10/2008 DONE
Plan assigned to (DLD) Darla11/18/200811/18/200812/9/2008 PASS
DetailsDarla L Downs
12/9/2008 16:17:42 DLD - activity updated through activity BLDA022 from case BLD08-02429.
PLANS/APPL TAKEN TO FRONT DESK  12/9/2008 DONE
Routing - PLUMBING12/8/2008 12/9/2008 PASS
DetailsBill VanDegrift
will have easement to sherwood or sewer to ann morrison prior to final per letter dated 12/4/08- resubmitted dated 12/9/08.
Plan resubmittals received  12/9/2008 DONE
received plumbing comment response letter given to Bill Vandegrift.
Routing PW Drainage12/4/2008 12/8/2008 PASS
DetailsBrian Murphy
Routing - PUBLIC WORKS12/8/2008 12/8/2008 PASS
DetailsBeverly Hall
Routing PW Sewer Design11/24/2008 12/8/2008 PASS
DetailsJon R. Gunnerson
Approved per letter dated 12/04/2008 from Joe Thompson to Boise Bld Dept, Any new sewer connections will require a tap permit.
1st review completed  12/4/2008 FAIL
Failed PW, Plumbing, Plan Check
Routing - PLAN CHECK12/4/2008 12/4/2008 PASS
DetailsDarla L Downs
Plans in hold box - They have failed in Plumbing,Public Works, Public Works Drainage,Public Works SWR design.
Routing - FIRE12/1/2008 12/4/2008 PASS
DetailsScott Arellano
Approved as shown. No fire code review comments attached.
Routing - PLANNING Land Div11/18/2008 12/4/2008 PASS
DetailsJoan Johnson
1978 one time split reviewed/ auth by DAA
jj
Plan resubmittals received  12/2/2008 DONE
DetailsAlexandra L. DeYoung
Rec'd 5 copies of sheets C3.0 and C4.0; inserted by arch rep; taken back to fire review
Routing - PLANNING11/26/2008 12/1/2008 PASS
DetailsJosh Wilson
Routing - PLAN CHECK12/1/2008 12/1/2008 FAIL
DetailsDarla L Downs
Plans have still failed in Public Works and in Plumbing. Sent plans to fire for review///dld
Routing - PLUMBING11/26/2008 11/26/2008 FAIL
DetailsBill VanDegrift
public works has stated that the sewer service to this property crosses another property without proper easement and the existing service is leaking. a new sewer service will need to be provided to this property. if the new service is to cross another property an easement will be required prior to plan approval.
Routing - Erosion and Sediment11/25/2008 11/26/2008 PASS
DetailsSteven Webb
ESC plan approved with attached conditions. ESC08-0096
Routing - PUBLIC WORKS11/18/2008 11/25/2008 FAIL
DetailsConnie Baumgartner
Routing PW Solid Waste11/24/2008 11/25/2008 PASS
DetailsPeter J. McCullough
Routing PW Drainage11/18/2008 11/24/2008 FAIL
DetailsBrian Murphy
NEED CROSS DRAINAGE ACCESS AGGREEMENT. BRIAN MURPHY ###-####
Routing PW Street Lights  11/24/2008 PASS
DetailsHank Alarcon
Routing PW Sewer Rating  11/24/2008 PASS
DetailsConnie Baumgartner
Plan resubmittals received  11/21/2008  
DetailsBarbara Stitt
Received 5 copies of sheets C1.0C2.0, C3.0, C3.1, C4.0, C5.0 and inserted into plans civil engineers office ///11-21-08 @ 9:00am BAS
Plan routing begun/NEW & ADDTN  11/18/2008  
DetailsDarla L Downs
Plans ACCEPTED BY PLAN TECH  11/18/2008 DONE
DetailsDarla L Downs
First Notice8/3/20098/3/2009   
DetailsJim Storey
Application received 11/17/2008   
Routing - PLAN CHECK12/9/2008