BLD-Aging Inspection | 8/3/2009 | 8/3/2009 | 8/3/2009 | | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 8/3/2009 | 8/3/2009 | 8/3/2009 | P | PASS |
Jim Storey
|
|
|
|
BLD-Conference | 6/3/2009 | 6/3/2009 | 6/3/2009 | P | PART |
Jim Storey
|
|
|
tr signed off for pw/ on temp with p/z
|
PubWorks Occupancy Approval | 6/3/2009 | 6/3/2009 | 6/3/2009 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Aging Inspection | 3/11/2009 | 3/11/2009 | 3/12/2009 | | PART |
Jim Storey
|
|
|
wip
|
CHANGE STATUS TO (RDY) | | | 12/10/2008 | | DONE |
|
|
|
|
Telephone call | | | 12/10/2008 | | |
|
|
|
Called Kelly permit ready and fee given Also need RP for ESC
|
Issue PAID IN FULL permit | | | 12/10/2008 | | DONE |
|
|
|
|
Plan assigned to (DLD) Darla | 11/18/2008 | 11/18/2008 | 12/9/2008 | | PASS |
Darla L Downs
|
|
|
12/9/2008 16:17:42 DLD - activity updated through activity BLDA022 from case BLD08-02429.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/9/2008 | | DONE |
|
|
|
|
Routing - PLUMBING | 12/8/2008 | | 12/9/2008 | | PASS |
Bill VanDegrift
|
|
|
will have easement to sherwood or sewer to ann morrison prior to final per letter dated 12/4/08- resubmitted dated 12/9/08.
|
Plan resubmittals received | | | 12/9/2008 | | DONE |
|
|
|
received plumbing comment response letter given to Bill Vandegrift.
|
Routing PW Drainage | 12/4/2008 | | 12/8/2008 | | PASS |
Brian Murphy
|
|
|
|
Routing - PUBLIC WORKS | 12/8/2008 | | 12/8/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Sewer Design | 11/24/2008 | | 12/8/2008 | | PASS |
Jon R. Gunnerson
|
|
|
Approved per letter dated 12/04/2008 from Joe Thompson to Boise Bld Dept, Any new sewer connections will require a tap permit.
|
1st review completed | | | 12/4/2008 | | FAIL |
|
|
|
Failed PW, Plumbing, Plan Check
|
Routing - PLAN CHECK | 12/4/2008 | | 12/4/2008 | | PASS |
Darla L Downs
|
|
|
Plans in hold box - They have failed in Plumbing,Public Works, Public Works Drainage,Public Works SWR design.
|
Routing - FIRE | 12/1/2008 | | 12/4/2008 | | PASS |
Scott Arellano
|
|
|
Approved as shown. No fire code review comments attached.
|
Routing - PLANNING Land Div | 11/18/2008 | | 12/4/2008 | | PASS |
Joan Johnson
|
|
|
1978 one time split reviewed/ auth by DAA
jj
|
Plan resubmittals received | | | 12/2/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
Rec'd 5 copies of sheets C3.0 and C4.0; inserted by arch rep; taken back to fire review
|
Routing - PLANNING | 11/26/2008 | | 12/1/2008 | | PASS |
Josh Wilson
|
|
|
|
Routing - PLAN CHECK | 12/1/2008 | | 12/1/2008 | | FAIL |
Darla L Downs
|
|
|
Plans have still failed in Public Works and in Plumbing. Sent plans to fire for review///dld
|
Routing - PLUMBING | 11/26/2008 | | 11/26/2008 | | FAIL |
Bill VanDegrift
|
|
|
public works has stated that the sewer service to this property crosses another property without proper easement and the existing service is leaking. a new sewer service will need to be provided to this property. if the new service is to cross another property an easement will be required prior to plan approval.
|
Routing - Erosion and Sediment | 11/25/2008 | | 11/26/2008 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions. ESC08-0096
|
Routing - PUBLIC WORKS | 11/18/2008 | | 11/25/2008 | | FAIL |
Connie Baumgartner
|
|
|
|
Routing PW Solid Waste | 11/24/2008 | | 11/25/2008 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Drainage | 11/18/2008 | | 11/24/2008 | | FAIL |
Brian Murphy
|
|
|
NEED CROSS DRAINAGE ACCESS AGGREEMENT. BRIAN MURPHY ###-####
|
Routing PW Street Lights | | | 11/24/2008 | | PASS |
Hank Alarcon
|
|
|
|
Routing PW Sewer Rating | | | 11/24/2008 | | PASS |
Connie Baumgartner
|
|
|
|
Plan resubmittals received | | | 11/21/2008 | | |
Barbara Stitt
|
|
|
Received 5 copies of sheets C1.0C2.0, C3.0, C3.1, C4.0, C5.0 and inserted into plans civil engineers office ///11-21-08 @ 9:00am BAS
|
Plan routing begun/NEW & ADDTN | | | 11/18/2008 | | |
Darla L Downs
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/18/2008 | | DONE |
Darla L Downs
|
|
|
|
First Notice | 8/3/2009 | 8/3/2009 | | | |
Jim Storey
|
|
|
|
Application received | | 11/17/2008 | | | |
|
|
|
|
Routing - PLAN CHECK | 12/9/2008 | | | | |
|
|
|
|