Third Notice | | 12/7/2009 | 12/1/2009 | | DONE |
|
|
|
|
Telephone call | | | 12/1/2009 | | DONE |
Tisha Gallop
|
|
|
called and left vm for Donal Olson to call me back reguarding final values submitted. Need to break down plm and mech values per multiple contractors.
|
Third Notice | | 10/30/2009 | 11/23/2009 | | DONE |
|
|
|
mailed
|
Case Summary (BLD) | | | 9/17/2009 | | DONE |
Tisha Gallop
|
|
|
|
Second Notice | | 7/24/2009 | 9/4/2009 | | DONE |
|
|
|
|
First Notice | | 4/20/2009 | 7/24/2009 | | DONE |
|
|
|
|
Permanent Occupancy UNPAID FEE | | | 4/20/2009 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 4/16/2009 | 4/17/2009 | 4/17/2009 | A | PASS |
Jim Sly
|
|
|
Don- call 30 mins prior to going for access Phone #: ###-#### OK for Perm Occ.
|
BLD-Final | 4/15/2009 | 4/15/2009 | 4/15/2009 | P | NR |
Mike Jordan
|
|
|
Don Phone #: ###-####> Needs elec. final.
|
FIRE-Final Inspection | 4/10/2009 | 4/13/2009 | 4/13/2009 | P | PASS |
Troy Cobbley
|
|
|
life safety passed.
|
FIRE-Final Inspection | 4/8/2009 | 4/9/2009 | 4/9/2009 | A | FAIL |
Troy Cobbley
|
|
|
don Phone #: ###-#### or ###-#### Provide the correct address as discussed and remove the door between the common bathroom corridor and the Office 120/future tenant as per the approved plans. The owner disagreed with both items. I got the direct line for addressing to have him call Chris and I also left a message on Tims Woodards phone about the door. There was nothing more I could do so I left a correction notice.
|
BLD-Final | 3/16/2009 | 3/16/2009 | 3/16/2009 | P | NR |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 12/8/2008 | 12/8/2008 | 12/8/2008 | P | PASS |
Jim Sly
|
|
|
DON\\PLEASE CALL PRIOR TO GOING Phone #: ###-####
|
Telephone call | | | 11/28/2008 | | DONE |
Cathy Brown
|
|
|
lft vm with Donald Olson ###-#### that permit and fees are ready to be picked up but needs gc
|
Permit Ready to Issue | | | 11/28/2008 | | DONE |
Cathy Brown
|
|
|
|
Issue PAID IN FULL permit | | | 11/28/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/18/2008 | | 11/26/2008 | | PASS |
Tim L. Woodard
|
|
|
Approved pending compliance with additional redlines on plans.
|
Plan assigned to (TLW) | 11/18/2008 | | 11/26/2008 | | PASS |
Tim L. Woodard
|
|
|
11/26/2008 11:34:15 TLW - activity updated through activity BLDA022 from case BLD08-02435.
|
Routing - FIRE | | | 11/26/2008 | | PASS |
Tim L. Woodard
|
|
|
Field Verify
|
1st review completed | | | 11/26/2008 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/26/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 11/26/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/26/2008 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 11/18/2008 | | 11/18/2008 | | PASS |
Beverly Hall
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/18/2008 | | DONE |
Darla L Downs
|
|
|
|
Routing PW Sewer Rating | 11/18/2008 | | 11/18/2008 | | PASS |
Louise Waldorf
|
|
|
|
Application received | | 11/18/2008 | | | |
|
|
|
|