Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD08-02435
StatusFinaled
Name TRIPLE O LLC
Site Address 3775 N EAGLE RD
Project NameOLSON PROFESSIONAL OFFICE COMP
Customer Number 
ePlanReviewNo
Description
(**VANILLA FINISH** - Olson Professional Office Complex ) Permit to build out for the first time a 1,671 square foot tenant space w/in a 8,930 square foot office shell (BLD07-00305) Work to include: [installation of interior non-bearing walls to create six offices, one break room, a mechanical room, separate sex accessible restrooms, a conference room, and a waiting room], install electrical, install mechanical, install plumbing fixtures, and installation of interior finishes in compliance with chapter 8 of the IBC. This building is not fire sprinklered. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 12/7/200912/1/2009 DONE
Telephone call  12/1/2009 DONE
DetailsTisha Gallop
called and left vm for Donal Olson to call me back reguarding final values submitted. Need to break down plm and mech values per multiple contractors.
Third Notice 10/30/200911/23/2009 DONE
mailed
Case Summary (BLD)  9/17/2009 DONE
DetailsTisha Gallop
Second Notice 7/24/20099/4/2009 DONE
First Notice 4/20/20097/24/2009 DONE
Permanent Occupancy UNPAID FEE  4/20/2009 DONE
DetailsTisha Gallop
BLD-Final4/16/20094/17/20094/17/2009APASS
DetailsJim Sly
Don- call 30 mins prior to going for access Phone #: ###-####
OK for Perm Occ.
BLD-Final4/15/20094/15/20094/15/2009PNR
DetailsMike Jordan
Don Phone #: ###-####> Needs elec. final.
FIRE-Final Inspection4/10/20094/13/20094/13/2009PPASS
DetailsTroy Cobbley
life safety passed.
FIRE-Final Inspection4/8/20094/9/20094/9/2009AFAIL
DetailsTroy Cobbley
don Phone #: ###-#### or ###-#### Provide the correct address as discussed and remove the door between the common bathroom corridor and the Office 120/future tenant as per the approved plans. The owner disagreed with both items. I got the direct line for addressing to have him call Chris and I also left a message on Tims Woodards phone about the door. There was nothing more I could do so I left a correction notice.
BLD-Final3/16/20093/16/20093/16/2009PNR
DetailsJim Sly
BLD-Framing/Rough-in12/8/200812/8/200812/8/2008PPASS
DetailsJim Sly
DON\\PLEASE CALL PRIOR TO GOING Phone #: ###-####
Telephone call  11/28/2008 DONE
DetailsCathy Brown
lft vm with Donald Olson ###-#### that permit and fees are ready to be picked up but needs gc
Permit Ready to Issue  11/28/2008 DONE
DetailsCathy Brown
Issue PAID IN FULL permit  11/28/2008 DONE
Routing - PLAN CHECK11/18/2008 11/26/2008 PASS
DetailsTim L. Woodard
Approved pending compliance with additional redlines on plans.
Plan assigned to (TLW)11/18/2008 11/26/2008 PASS
DetailsTim L. Woodard
11/26/2008 11:34:15 TLW - activity updated through activity BLDA022 from case BLD08-02435.
Routing - FIRE  11/26/2008 PASS
DetailsTim L. Woodard
Field Verify
1st review completed  11/26/2008 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  11/26/2008 DONE
Case Summary (BLD)  11/26/2008 DONE
Print Occupancy Form  11/26/2008 DONE
Routing - PUBLIC WORKS11/18/2008 11/18/2008 PASS
DetailsBeverly Hall
Plans ACCEPTED BY PLAN TECH  11/18/2008 DONE
DetailsDarla L Downs
Routing PW Sewer Rating11/18/2008 11/18/2008 PASS
DetailsLouise Waldorf
Application received 11/18/2008