First Notice | 11/20/2009 | 11/20/2009 | 11/24/2009 | | DONE |
Dave Hannah
|
|
|
|
BLD-Final | 11/19/2009 | 11/20/2009 | 11/20/2009 | A | PASS |
Dave Hannah
|
|
|
DARYL Phone #: ###-####
|
DOC - Permit Finaled | 11/20/2009 | 11/20/2009 | 11/20/2009 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 11/18/2009 | 11/18/2009 | 11/18/2009 | P | PASS |
Forrest France
|
|
|
Project related fire alarm corrections are complete, fire life safety final approved, inspection passed.
|
FIRE-Final Inspection | 8/10/2009 | 8/11/2009 | 8/11/2009 | A | NR |
Forrest France
|
|
|
Fire life safety approval pending fire alarm upgrade work for exisitng devices at the common areas and exit corridors (synchronization).
|
BLD-Final | 8/5/2009 | 8/5/2009 | 8/6/2009 | P | NR |
Dave Hannah
|
|
|
DARYL ###-#### needs fire finals first
|
BLD-Framing/Rough-in | 6/10/2009 | 6/11/2009 | 6/11/2009 | A | PART |
Dave Hannah
|
|
|
darrell - ceiling Phone #: ###-#### ok to cover cdeiling
|
BLD-Framing/Rough-in | 5/7/2009 | 5/8/2009 | 5/8/2009 | A | PASS |
Dave Hannah
|
|
|
Daryl- wall Phone #: ###-####
|
BLD-Other | 4/17/2009 | 4/20/2009 | 4/20/2009 | A | PASS |
Dave Hannah
|
|
|
ceiling insp//Daryl Phone #: ###-#### ok to cover ceiling
|
BLD-Wall cover | 3/30/2009 | 3/30/2009 | 3/30/2009 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/30/2009 at 8:01:12 AM. Contact: ###-####.
|
BLD-Other | 2/13/2009 | 2/17/2009 | 2/17/2009 | A | PART |
Dave Hannah
|
|
|
Daryl- ceiling Phone #: ###-#### ok to cover ceiling
|
BLD-Framing/Rough-in | 1/29/2009 | 1/30/2009 | 1/30/2009 | A | PASS |
Dave Hannah
|
|
|
darrell Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 1/29/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
(F) Reprint permit | | | 1/29/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
BLD-Framing/Rough-in | 1/27/2009 | 1/28/2009 | 1/28/2009 | A | NR |
Dave Hannah
|
|
|
Daryl Phone #: ###-####
|
Plan assigned to (DRS) | 1/27/2009 | 1/27/2009 | 1/28/2009 | | PASS |
Dan Stuart
|
|
|
1/28/2009 13:22:27 DRS - activity updated through activity BLDA022 from case BLD08-02461.
|
Case Summary (BLD) | | | 1/28/2009 | | |
|
|
|
|
Override - Parcel Holds | | | 1/28/2009 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 1/28/2009 | | PASS |
|
|
|
Plan modification adding 1-hour horizontal ceiling above WIG room 1-231 per NER-258 & USG Applications attached to and part of approved plan.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/28/2009 | | PASS |
|
|
|
Plan modification to permit desk to issue.
|
Inspection Record Card- Bld | | | 1/28/2009 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/28/2009 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 1/28/2009 | | DONE |
Barbara Stitt
|
|
|
Emailed Curtis and told him that permit is ready & fees due 1-28-09 BAS
|
Plan Modification Accepted | | | 1/27/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
BLD08-02461 Rec'd Plan Modification to create a corridor seperation over wigs 1-231 using tunnel construction, due to the location of a existing ductwork///ALR
|
Issue & PRINT to be Invoiced | | | 12/24/2008 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Bld | | | 12/22/2008 | | DONE |
|
|
|
|
Telephone call | | | 12/22/2008 | | DONE |
|
|
|
left vm for curtis at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 12/22/2008 | | DONE |
|
|
|
|
Routing - FIRE | 12/17/2008 | 12/17/2008 | 12/19/2008 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Plan assigned to (DRS) | 11/24/2008 | | 12/19/2008 | | PASS |
Dan Stuart
|
|
|
12/19/2008 18:30:04 DRS - activity updated through activity BLDA022 from case BLD08-02461.
|
1st review completed | | | 12/19/2008 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 12/19/2008 | | 12/19/2008 | | PASS |
Dan Stuart
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/19/2008 | | PASS |
|
|
|
|
Route to Impact Fee Review | 12/17/2008 | 12/22/2008 | 12/18/2008 | | PASS |
Cindy M. Gould
|
|
|
Tenant improvement no impact fees
|
Routing - PLAN CHECK | 11/28/2008 | | 12/17/2008 | | PEND |
Dan Stuart
|
|
|
Routing to fire code analyst for review. Red-lined plans for required code compliance for accessible approach at door 104 with copy of report and requirement to Dana Kaufman architect to be verified by filed inspection.
|
Routing - PLUMBING | 11/25/2008 | | 11/28/2008 | | PASS |
Bill VanDegrift
|
|
|
no new med gas, per plans and 2003 upc.
|
Routing PW Sewer Rating | 11/25/2008 | | 11/25/2008 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 11/24/2008 | | 11/25/2008 | | PASS |
Beverly Hall
|
|
|
|
Pending Assignment by JCB | 11/21/2008 | | 11/24/2008 | | DONE |
Jason Blais
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/21/2008 | | DONE |
Darla L Downs
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/21/2008 | | DONE |
Darla L Downs
|
|
|
|
Application received | | 11/20/2008 | 11/20/2008 | | |
Darla L Downs
|
|
|
|
Case Summary (BLD) | | | 11/20/2008 | | DONE |
|
|
|
|