Second Notice BLD | 1/2/2009 | 1/2/2009 | 1/2/2009 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 12/16/2008 | 1/2/2009 | | DONE |
|
|
|
|
BLD-Final | 12/15/2008 | 12/16/2008 | 12/16/2008 | A | PASS |
Tom Arcoraci
|
|
|
wayne Phone #: ###-####
|
Permanent Occupancy | | | 12/16/2008 | | DONE |
Barbara Stitt
|
|
|
|
FIRE-Final Inspection | 12/4/2008 | 12/4/2008 | 12/4/2008 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
BLD-Conference | 12/4/2008 | 12/4/2008 | 12/4/2008 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Final | 12/4/2008 | 12/4/2008 | 12/4/2008 | P | PART |
Tom Arcoraci
|
|
|
ok for temp needs handrail guard rail at mess
|
BLD-Final | 12/2/2008 | 12/3/2008 | 12/3/2008 | P | NR |
Tom Arcoraci
|
|
|
Wayne Phone #: ###-####
|
FIRE-Final Inspection | 12/2/2008 | 12/3/2008 | 12/3/2008 | A | FAIL |
Troy Cobbley
|
|
|
Repair exit signs/emergency lights, provide a fire extinguisher for the mezzanine, provide stickers at the exit doors.
|
Plan assigned to (TLW) | 11/24/2008 | | 12/2/2008 | | DONE |
Tim L. Woodard
|
|
|
NO NEW WORK IS AUTHORIZED UNDER THIS PERMIT.
|
1st review completed | | | 12/2/2008 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/2/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 12/2/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/2/2008 | | DONE |
|
|
|
|
Telephone call | | | 12/2/2008 | | DONE |
Cathy Brown
|
|
|
tlk to wayne eldredge ###-#### that bld permit is ready to be picked and is already paid for
|
Permit Ready to Issue | | | 12/2/2008 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/2/2008 | | DONE |
|
|
|
|
Application received | | 11/24/2008 | 11/24/2008 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/24/2008 | | DONE |
Barbara Stitt
|
|
|
|