Third Notice | | 2/9/2010 | 2/3/2010 | | DONE |
|
|
|
|
Third Notice | | 1/17/2010 | 1/28/2010 | | DONE |
|
|
|
mailed, e-mailed and called
|
Telephone call | | | 1/28/2010 | | DONE |
Tisha Gallop
|
|
|
called and left vm need good Fax# and request FV.//Terry called me back said fax not working and to e-mail it to him //1/28/10 LEG
|
Second Notice | | 1/8/2010 | 1/12/2010 | | DONE |
|
|
|
|
First Notice | | 12/14/2009 | 12/29/2009 | | DONE |
Barbara Stitt
|
|
|
E-mailed
|
BLD-Final | 10/14/2009 | 10/14/2009 | 10/14/2009 | P | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 10/14/2009 | 10/14/2009 | 10/14/2009 | P | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 10/14/2009 | 10/14/2009 | 10/14/2009 | | PASS |
Jim Storey
|
|
|
|
Permanent Occupancy | | | 10/14/2009 | | DONE |
|
|
|
|
BLD-Final | 8/13/2009 | 8/14/2009 | 8/14/2009 | P | PASS |
Jim Storey
|
|
|
Terry Phone #: ###-#### signed card on site final ok
|
FIRE-Final Inspection | 8/13/2009 | 8/14/2009 | 8/14/2009 | A | PASS |
Forrest France
|
|
|
C/N items verified for completion, fire life safety finaled.
|
FIRE-Final Inspection | 8/6/2009 | 8/6/2009 | 8/6/2009 | P | FAIL |
Forrest France
|
|
|
The existing building fire sprinkler system is overdue annual inspection per the most recent riser tag dated 2006.
|
BLD-Final | 7/22/2009 | 7/23/2009 | 7/23/2009 | A | FAIL |
Jim Storey
|
|
|
terry Phone #: ###-####
|
BLD-Aging Inspection | 6/25/2009 | 6/25/2009 | 6/25/2009 | | PASS |
Jim Storey
|
|
|
no call
|
BLD-Framing/Rough-in | 2/17/2009 | 2/17/2009 | 2/17/2009 | P | PART |
Jim Storey
|
|
|
terry Phone #: ###-#### ok need plm reset 18 inch to c/l of stool. framing ok to cover.
|
Issue PAID IN FULL permit | | | 1/5/2009 | | DONE |
|
|
|
|
Telephone call | | | 12/30/2008 | | DONE |
|
|
|
t/c w doug tamara at ###-#### - permit ready and fees given - also need gc name and rce#
|
Permit Ready to Issue | | | 12/30/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/29/2008 | | 12/29/2008 | | PASS |
Tim L. Woodard
|
|
|
Approved per resubmittals and redlines on plans. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/29/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 12/29/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/29/2008 | | DONE |
|
|
|
|
Plan assigned to (TLW) | | | 12/29/2008 | | PASS |
Tim L. Woodard
|
|
|
12/29/2008 11:20:07 TLW - activity updated through activity BLDA022 from case BLD08-02498.
|
Plan resubmittals received | | | 12/22/2008 | | |
Tim L. Woodard
|
|
|
Received 1 cover transmittal letter, 2 copies of sheets A2.1, A9.0 and taken to Tim Woodard///12-20-08 @ 8:30am BAS
|
Routing - PLAN CHECK | 12/12/2008 | | 12/12/2008 | | FAIL |
Tim L. Woodard
|
|
|
Refer to plan review report. TLW
|
Routing - FIRE | | | 12/12/2008 | | PASS |
Tim L. Woodard
|
|
|
Field Verify
|
Routing - Erosion and Sediment | 12/12/2008 | | 12/12/2008 | | PASS |
Tim L. Woodard
|
|
|
Scope of work does not exceed allowences on sheet #707 therefore no ESC permit is required. Per attached waiver letter Architect identified 15 ft. or saw cutting. TLW
|
1st review completed | | | 12/12/2008 | | FAIL |
|
|
|
Failed Plan Check
|
Routing - PUBLIC WORKS | 12/1/2008 | | 12/2/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Sewer Rating | 12/2/2008 | | 12/2/2008 | | PASS |
Louise Waldorf
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/1/2008 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/28/2008 | | |
|
|
|
|
Application received | | 11/28/2008 | | | |
|
|
|
|