Permit Information
Permit NumberBLD08-02513
StatusFinaled
Name C-B CONTRACTORS INC
Site Address 7009 W FRANKLIN RD
Project NameBishop Kelly High School
Customer Number 
ePlanReviewNo
Description
(MAINTENANCE STORAGE SHED) (Bishop Kelly high School) 3/18/09 PLAN MODIFICATION SHOWING INTERIOR CONSTRUCTION OF NEW WALLS & STORAGE DECK ABOVE FOR SEPARATE STORAGE AREAS. To obtain a permit to replace BLD05-02633 which was prepared by Mike Otto & taken to permit desk but was not picked up by contractor. Work has been done. Scope of work involved installation an engineered foundation and moving an existing 2,340 sq. ft. one story building to be placed on the new foundation. The building will be used as a Maintenance Shop. An alternate has been accepted by Building Official, George Slane, in lieu of IBC Sec. 3408 for moved buildings. All code requirements for the moved structure will be per field inspectors approval and attached letter from structural engineer Keith Jones regarding the existing concrete foundation. Fire Dept. vehicle access and fire hydrant location was covered under BLD08-00892. There is no electrical, plumbing or mechanical work submitted with this project scope. CUP08-00082 drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
MISC ACTIONS  11/25/2009 DONE
DetailsTisha Gallop
put GC (C-B Contractors) on hold for final value of this project.
Third Notice 11/1/200911/5/2009 DONE
faxed (did not go through, no answer), mailed and called
Telephone call  11/5/2009 DONE
DetailsTisha Gallop
called and left vm in general mailbox need final values. If not hear from them w/in 2 weeks will put company on hold.
Third Notice 10/10/200910/22/2009 DONE
faxed, mailed and called
Telephone call  10/22/2009 DONE
DetailsTisha Gallop
called C-B Contractors and left voice message in general mailbox need final values and to have someone call me back.
Third Notice 9/28/20099/30/2009 DONE
Second Notice 9/17/20099/18/2009 DONE
First Notice 6/23/20099/17/2009 DONE
BLD-Final6/22/20096/23/20096/23/2009APASS
DetailsTom Arcoraci
joel Phone #: ###-####
Permanent Occupancy  6/23/2009 DONE
DetailsAlexandra L. DeYoung
FIRE-Final Inspection6/18/20096/19/20096/19/2009APASS
DetailsForrest France
Corrections field verified, life safety inspection passed. NOTE: signature card not available.
FIRE-Final Inspection5/19/20095/20/20095/20/2009AFAIL
DetailsTroy Cobbley
The revised plans showing the additional offices was not available on site. No inspection was performed.
BLD-Aging Inspection4/15/20094/15/20094/15/2009 PASS
DetailsTom Arcoraci
CHANGE STATUS TO (ISS)  4/6/2009 DONE
DetailsTisha Gallop
picked up and paid for plan mod
Plan assigned to (DRS)3/27/20093/27/20094/2/2009 PASS
DetailsDan Stuart
4/2/2009 12:00:53 DRS - activity updated through activity BLDA022 from case BLD08-02513.
Routing - FIRE4/2/2009 4/2/2009 PASS
DetailsScott Arellano
Walked plans over & reviewed changes with Scott. No changes in fire code plan review needed. drs
Routing - PLAN CHECK3/18/2009 4/2/2009 PEND
DetailsDan Stuart
To fire to see if they want to review.
Routing - PLAN CHECK4/2/2009 4/2/2009 PASS
DetailsDan Stuart
To permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  4/2/2009 PASS
Telephone call  4/2/2009 DONE
Details
t/c w richard at ###-#### - permit ready (plan mod) and fees given
Override - Parcel Holds  4/2/2009  
Permit Ready to Issue  4/2/2009 DONE
Details
Plan Modification Accepted  3/26/2009  
DetailsDan Stuart
Plan modification accepted for Bld08-02513 (Bishop Kelly maintenance shed) because additional wood framing was added to the plan to create a secure storage room and an athletic equipment room. See th attached plans for documentation. Additional framing is identified by revision cloud (1) FRAMING REVISIONS 03.02.09; submitted on sheets A2.11 and letter from Richard Honsinger (Architect); routed to Dan Stuart
Routing - PLAN CHECK3/18/2009 3/18/2009 FAIL
DetailsDan Stuart
Plan Mod application required and additional items for code compliance issues required. E-mail to architect to provide.
Plan resubmittals received  3/18/2009 DONE
DetailsDan Stuart
Received 1 cover transmittal and 3 copies of sheet A2.11 and taken to Dan Stuart's desk///3-18-09 @ 9:15am BAS
FIRE-Final Inspection2/11/20092/13/20092/13/2009AFAIL
DetailsTroy Cobbley
Resubmit the building plans showing the new storage and office within the building. Provide fire extinguishers in both of the storage areas and provide approved single action hardware on all doors.
BLD-Final2/11/20092/11/20092/11/2009PNR
DetailsTom Arcoraci
joel Phone #: ###-#### needs fire insp
BLD-Final2/10/20092/11/20092/11/2009ANR
DetailsTom Arcoraci
Joel Phone #: ###-####
Zoning Approval2/11/20092/11/20092/11/2009 PASS
DetailsCody Riddle
BLD-Final1/26/20091/27/20091/27/2009ANR
DetailsTom Arcoraci
joel Note: please call 1/2 hr prior to inspection Phone #: ###-####
Issue PAID IN FULL permit  1/14/2009 DONE
DetailsAlexandra L. DeYoung
Route to Impact Fee Review12/16/200812/19/200812/22/2008 PASS
DetailsCindy M. Gould
Fire and Police impact fees applied per David Selvage
Print Occupancy Form  12/22/2008 DONE
Telephone call  12/22/2008 DONE
Details
left message w richard for andrew erstad at ###-#### - permit ready and fees given - also need gc name and rce#
Permit Ready to Issue  12/22/2008 DONE
Details
Routing - FIRE12/16/200812/16/200812/19/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
Plan assigned to (DRS)12/5/200812/5/200812/19/2008 PASS
DetailsDan Stuart
12/19/2008 18:33:16 DRS - activity updated through activity BLDA022 from case BLD08-02513.
1st review completed  12/19/2008 PASS
Routing - PLAN CHECK12/19/2008 12/19/2008 PASS
DetailsDan Stuart
PLANS/APPL TAKEN TO FRONT DESK  12/19/2008 PASS
Routing - PLAN CHECK12/5/2008 12/16/2008 PEND
DetailsDan Stuart
No resubmittals required based on records on file for BLD05-02633 and fire dept. follow up tied to BLD08-00892 (bleachers & press box). To fire code analyst for review.
Routing - Erosion and Sediment12/5/2008 12/8/2008 PASS
DetailsSteven Webb
ESC plan approved with attached conditions. ESC08-01026
Routing - PLANNING12/8/2008 12/8/2008 PASS
DetailsCody Riddle
Must comply with setbacks and conditions of CUP08-00082.
Plan routing begun/NEW & ADDTN  12/5/2008 DONE
Plans ACCEPTED BY PLAN TECH  12/5/2008 DONE
DetailsDarla L Downs
Application received 12/4/200812/4/2008 DONE
DetailsDarla L Downs
Intake Approval  12/4/2008 PASS
Had plan intake with Weston Schuette, Erstad Arch. Plan accepted into system.