BLD-Final | 8/31/2009 | 9/1/2009 | 9/1/2009 | A | PASS |
Jim Storey
|
|
|
Alan Phone #: ###-####
|
DOC - Permit Finaled | 9/1/2009 | 9/1/2009 | 9/1/2009 | P | PASS |
Jim Storey
|
|
|
|
BLD-Grading Inspection | 9/1/2009 | 9/1/2009 | 9/1/2009 | A | DONE |
Terry Records
|
|
|
Final grading and drainage approved
|
BLD-Final | 8/27/2009 | 8/28/2009 | 8/28/2009 | A | FAIL |
Jim Storey
|
|
|
Alan Phone #: ###-#### saftey glazing/ handrails.
|
BLD-Energy code compliance | 5/7/2009 | 5/8/2009 | 5/8/2009 | A | PASS |
Jim Storey
|
|
|
Alan Phone #: ###-####
|
BLD-Other | 5/5/2009 | 5/6/2009 | 5/6/2009 | A | PART |
Jim Storey
|
|
|
Alan- foam and seal Phone #: ###-#### seal draft stop and pipe chase fur out/ holddown basement behind lav back wall. ok to insulate.
|
BLD-Other | 4/8/2009 | 4/9/2009 | 4/9/2009 | A | PASS |
Jim Storey
|
|
|
Alan- sheer wall Phone #: ###-#### gyp on wall and soffit ok to cover exterior.
|
BLD-Framing/Rough-in | 3/27/2009 | 3/27/2009 | 3/27/2009 | P | PASS |
Jim Storey
|
|
|
shear nail inspection please-Allan Phone #: ###-#### sheer nailling ok
|
BLD-Foundation | 2/3/2009 | 2/3/2009 | 2/3/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/3/2009 at 7:44:13 AM. Contact: ###-####.
|
BLD-Footing | 2/2/2009 | 2/2/2009 | 2/2/2009 | P | PASS |
Jim Storey
|
|
|
gary Phone #: ###-####
|
BLD-Foundation | 1/22/2009 | 1/22/2009 | 1/22/2009 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 1/22/2009 at 7:24:51 AM. Contact: ###-####.
|
BLD-Footing | 1/19/2009 | 1/20/2009 | 1/20/2009 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 1/19/2009 at 8:25:51 AM. Contact: ###-####.ft ok west side of bld.
|
PubWorks Subgrade Approval | 1/13/2009 | 1/13/2009 | 1/13/2009 | | PART |
Terry Records
|
|
|
Lower level footings approved by the geotechnicla engineer. Footings for the garage will require separate approval.
|
Issue PAID IN FULL permit | | | 1/8/2009 | | DONE |
|
|
|
|
Plan assigned to (PEP) | 12/9/2008 | 12/9/2008 | 12/24/2008 | | DONE |
Perry Paine
|
|
|
|
Routing Walk-In (BLD) | 12/9/2008 | 12/9/2008 | 12/24/2008 | P | PASS |
Perry Paine
|
|
|
|
Routing - PLAN CHECK | 12/9/2008 | | 12/24/2008 | | PASS |
Perry Paine
|
|
|
Perry Paine
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/24/2008 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/24/2008 | | DONE |
|
|
|
|
Telephone call | | | 12/24/2008 | | DONE |
|
|
|
Called left message permit ready and fee given ///DLD
|
Permit Ready to Issue | | | 12/24/2008 | | DONE |
|
|
|
|
Plan resubmittals received | | | 12/17/2008 | | DONE |
|
|
|
recieved new lan sheete a-5; a-8; and a-9 with engineers supplemental calculations for the relocation of lateral bracing for the new structure.
|
Telephone call | | | 12/12/2008 | | |
|
|
|
|
Telephone call | | | 12/12/2008 | | DONE |
|
|
|
spoke with John Wolf with Lochsa engineering and he has done recalculations for the front and rear walls that will be sent to the plan designer and could be submitted to this department by tuesday.
|
Route to Impact Fee Review | 12/9/2008 | 12/12/2008 | 12/10/2008 | | PASS |
Cindy M. Gould
|
|
|
No Impact fee replacement home for one demolished due to fire.
|
Application received | | 12/9/2008 | 12/9/2008 | | DONE |
Barbara Stitt
|
|
|
|
Routing Walk-In (BLD) | 12/9/2008 | 12/9/2008 | 12/9/2008 | P | PASS |
David Moser
|
|
|
12/9/2008 14:51:16 DEM - activity updated through activity BLDI252 from case BLD08-02527. Approved as per CVA08-00041
|
Routing - Addressing | 12/9/2008 | | 12/9/2008 | | PASS |
Chris Pichardo
|
|
|
|
Routing - PUBLIC WORKS GRADING | 12/9/2008 | | 12/9/2008 | | PASS |
Terry Records
|
|
|
Approved as Category 3
|
Routing PW Sewer Rating | 12/9/2008 | | 12/9/2008 | | PASS |
Louise Waldorf
|
|
|
|
PubWorks Subgrade Approval | 2/3/2009 | 2/3/2009 | | | PASS |
Brian Murphy
|
|
|
Footing subgrade approval letter received
|