Case Summary (BLD) | | | 8/9/2016 | | DONE |
|
|
|
|
Routing PW Street Lights | | | 5/7/2014 | | PASS |
Hank Alarcon
|
|
|
Called and faxed Steve Christensen on 12/29/2008 and advised him of correction required on street lighting plans.
|
Third Notice | | 11/15/2009 | 11/6/2009 | | DONE |
|
|
|
|
Telephone call | | | 11/6/2009 | | DONE |
Tisha Gallop
|
|
|
per phone call with Sean Matier/Benchmark const.; KMD final total $33,800 (all the mech. value), Paige final value is $27,000 (all the plm value), he doesn't know what value for Jim Russell Excavation because he had the contract for the all the site work and parking lot and not know what portion of that was just for the underground sewer/water lines.
|
Third Notice | | 10/31/2009 | 11/5/2009 | | DONE |
|
|
|
|
Second Notice | | 9/28/2009 | 10/21/2009 | | DONE |
Barbara Stitt
|
|
|
|
First Notice | | 9/1/2009 | 9/18/2009 | | DONE |
|
|
|
|
PubWorks Occupancy Approval | 9/3/2009 | 9/3/2009 | 9/3/2009 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 8/31/2009 | 9/1/2009 | 9/1/2009 | A | PASS |
Jim Sly
|
|
|
Shawn Phone #: ###-#### OK for Perm Occ.
|
Permanent Occupancy | | | 9/1/2009 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 8/28/2009 | 8/31/2009 | 8/31/2009 | P | NR |
Jim Sly
|
|
|
Shawn Phone #: ###-#### need P/W
|
FIRE-Final Inspection | 8/28/2009 | 8/31/2009 | 8/31/2009 | A | PASS |
Troy Cobbley
|
|
|
life safety passed. The lights have been repaired.
|
BLD-Final | 8/27/2009 | 8/28/2009 | 8/28/2009 | P | NR |
Jim Sly
|
|
|
Shawn Phone #: ###-#### Need Fire for Perm....P/W.....
|
FIRE-Final Inspection | 8/27/2009 | 8/28/2009 | 8/28/2009 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was being given with mark sentennos permission until the two missing emergency lights have been installed. All other items are passed. I waited while the sample tubes in the duct detector were installed correctly.
|
Zoning Approval | 8/28/2009 | 8/28/2009 | 8/28/2009 | | PASS |
Andrea Tuning
|
|
|
|
BLD-Other | 8/18/2009 | 8/19/2009 | 8/18/2009 | A | PASS |
Jim Sly
|
|
|
shawn - ceiling grid Phone #: ###-#### Ceiling Grid Pass................Disregard previous framing Inspection....(ie...Eng to Ok double stud nai...........) Mistake.....
|
BLD-Framing/Rough-in | 8/17/2009 | 8/18/2009 | 8/18/2009 | A | PART |
Jim Sly
|
|
|
Shawn Phone #: ###-#### Shear panel nailing OK......Waiting for OK from Eng for attachment of double studs at panel ends.... (Pre mfg panels)
|
BLD-Energy code compliance | 7/29/2009 | 7/30/2009 | 7/30/2009 | A | PASS |
Jim Storey
|
|
|
Shawn Phone #: ###-#### roof made ok
|
BLD-Energy code compliance | 7/27/2009 | 7/28/2009 | 7/28/2009 | A | PART |
Jim Storey
|
|
|
shawn Phone #: ###-#### ok need recalc. for roof deck to meet r 30
|
BLD-Framing/Rough-in | 7/27/2009 | 7/28/2009 | 7/28/2009 | A | PASS |
Jim Storey
|
|
|
shawn Phone #: ###-#### drive thru roof nailling ok to cover
|
BLD-Framing/Rough-in | 7/24/2009 | 7/24/2009 | 7/24/2009 | P | PASS |
Mike Jordan
|
|
|
Shawn if possible around 2 pm Phone #: ###-####. Interior and exterior framed walls and hardlids ok. All straps installed. Interior shear walls ok.
|
BLD-Framing/Rough-in | 7/21/2009 | 7/21/2009 | 7/21/2009 | P | PART |
Mike Jordan
|
|
|
Shawn-if possible around 2 or 2:30 please Phone #: ###-####. Extrior shear nailing and nailing for roof diapragm. Also inspected and verified straps on exterior side of roof. Still needs to nstall straps for drag struts below.
|
BLD-Framing/Rough-in | 7/14/2009 | 7/14/2009 | 7/14/2009 | P | PART |
Jim Sly
|
|
|
SHAWN Phone #: ###-#### Inspection of hold downs and fireblocking at (3) popped out walls........West wall toward Eagle Rd. OK to cover.
|
BLD-Conference | 7/9/2009 | 7/9/2009 | 7/9/2009 | P | PASS |
Jim Sly
|
|
|
shaun Phone #: ###-#### Verified hold down at W. wall ....Electrical room......OK to cover.
|
BLD-Foundation | 6/22/2009 | 6/23/2009 | 6/23/2009 | A | PART |
Jim Sly
|
|
|
shawn - stem wall Phone #: ###-#### Wall OK pending MTI inspection, tests and approvals.
|
BLD-Foundation | 6/17/2009 | 6/18/2009 | 6/18/2009 | A | PART |
Jim Sly
|
|
|
shawn - late morning - pouring at 1 Phone #: ###-#### Rebar appears OK at footings except for an area for truck access to be completed later. MTI special insp on Compressive strength for concrete.
|
Issue PAID IN FULL permit | | | 6/12/2009 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 6/10/2009 | | 6/11/2009 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/11/2009 | | DONE |
John Menard
|
|
|
|
Print Occupancy Form | | | 6/11/2009 | | DONE |
|
|
|
|
Telephone call | | | 6/11/2009 | | DONE |
|
|
|
left vm for steve christiansen at ###-#### - permit ready and fees given - also need ACHD receipt and RP name
|
Permit Ready to Issue | | | 6/11/2009 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 12/19/2008 | | 6/11/2009 | | PASS |
John Menard
|
|
|
6/11/2009 09:16:35 JCM - activity updated through activity BLDA022 from case BLD08-02568.
|
Routing - PUBLIC WORKS | 6/4/2009 | | 6/10/2009 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Drainage | | | 6/10/2009 | | FAIL |
Brian Murphy
|
|
|
NEED REVISION TO DETAIL SHEET BRIAN MURPHY ###-####
|
Routing PW Drainage | 6/10/2009 | | 6/10/2009 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLANNING | 6/10/2009 | | 6/10/2009 | | FAIL |
Andrea Tuning
|
|
|
Waiting for the applicant to submit a cross access agreement. ANT 6-10-09
|
Routing - PLAN CHECK | 6/10/2009 | | 6/10/2009 | | |
John Menard
|
|
|
|
Routing - PLANNING | 6/10/2009 | | 6/10/2009 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLAN CHECK | 4/1/2009 | | 6/4/2009 | | |
John Menard
|
|
|
|
Routing - PLANNING Land Div | 6/4/2009 | | 6/4/2009 | | PASS |
Todd Tucker
|
|
|
Subdivision has been recorded.
|
Routing - PUBLIC WORKS | 3/27/2009 | | 4/1/2009 | | FAIL |
Connie Baumgartner
|
|
|
Failed by Brian Murphy, contact at ###-#### for more information.
|
Routing PW Drainage | 3/27/2009 | | 3/31/2009 | | FAIL |
Brian Murphy
|
|
|
Need cross drainage access agreement Brian Murphy ###-####
|
Routing - PLAN CHECK | 3/26/2009 | | 3/27/2009 | | |
John Menard
|
|
|
|
Routing PW Street Lights | 3/27/2009 | | 3/27/2009 | | PASS |
Hank Alarcon
|
|
|
|
Routing - FIRE | 3/23/2009 | | 3/26/2009 | | PASS |
Scott Arellano
|
|
|
Attached updated IFC comments to plans
|
Routing - PLAN CHECK | 3/20/2009 | | 3/23/2009 | | |
John Menard
|
|
|
|
Routing - PLANNING | 3/23/2009 | | 3/23/2009 | | FAIL |
Andrea Tuning
|
|
|
Waiting for the applicant to submit a cross access agreement. ANT 3-23-09
|
Routing - PLAN CHECK | 3/23/2009 | | 3/23/2009 | | PASS |
John Menard
|
|
|
|
Plan Reviewer's activity | | | 3/23/2009 | | PASS |
John Menard
|
|
|
Reviewed and and approved structural and nonstructural plan revisions. JCM
|
Routing - PUBLIC WORKS | 3/16/2009 | | 3/20/2009 | | FAIL |
Louise Waldorf
|
|
|
Refer to site drainage
|
Routing - Erosion and Sediment | 3/13/2009 | | 3/16/2009 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions. ESC08-01043
|
Plan resubmittals received | | | 3/13/2009 | | |
|
|
|
Received three copies of O & M manual, Drainage Report, ESC application and narrative, five copies of sheets C1.0, C1.1, C1.2, C1.3, C1.4, C1.5; inserted by arch. rep and taken back to ESC
|
Routing - PUBLIC WORKS | 3/6/2009 | | 3/13/2009 | | FAIL |
Louise Waldorf
|
|
|
Refer to site drainage
|
Routing PW Street Lights | 3/6/2009 | | 3/9/2009 | | FAIL |
Hank Alarcon
|
|
|
Called E2CO Electrical Engineering Company ###-#### on 03/09/2009. Advised Jeff that plan did not meet ISPWC standards or City of Boise street lighting standards and to resubmit street light plans.
|
Routing - PLUMBING | 3/2/2009 | | 3/5/2009 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Routing - PLAN CHECK | 1/14/2009 | | 3/2/2009 | | |
John Menard
|
|
|
|
Plan resubmittals received | | | 3/2/2009 | | DONE |
|
|
|
received 4 responses & 4 copies of sheets C1.3,A1.1,A5.5,A6.1,S2.0,S3.1,E1.0,E3.2 insreted by Steve Christansen from LCA architects. taken back to John M.
|
Route to Impact Fee Review | 1/12/2009 | 1/15/2009 | 1/14/2009 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - FIRE | 1/12/2009 | 1/12/2009 | 1/14/2009 | | FAIL |
Scott Arellano
|
|
|
Faxed and emailed resubmittal items to architect.
|
Application received | | 12/18/2008 | 1/14/2009 | | DONE |
Barbara Stitt
|
|
|
|
1st review completed | | | 1/14/2009 | | FAIL |
|
|
|
Failed PW, ESC, Structural, Plumbing, Planning, Plan Check, Fire
|
Plan resubmittals requested | | | 1/13/2009 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
Routing - PLAN CHECK | 1/7/2009 | | 1/12/2009 | | FAIL |
John Menard
|
|
|
|
Plan resubmittals requested | | | 1/12/2009 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
Routing - PLANNING | 1/6/2009 | | 1/7/2009 | | FAIL |
Andrea Tuning
|
|
|
The applicant has not provided the cross access agreement that was required with the DR application.
ANT 1-7-09
|
Routing - Erosion and Sediment | 1/5/2009 | | 1/6/2009 | | FAIL |
Steven Webb
|
|
|
ESC plan does not meet requirements per BMC 8-17. Faxed ESC checklist to PD. Re-submittal is required.
|
Routing - PUBLIC WORKS | 12/23/2008 | | 1/5/2009 | | FAIL |
Louise Waldorf
|
|
|
Refer to street lighting and site drainage
|
Routing PW Solid Waste | 1/2/2009 | | 1/5/2009 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Sewer Rating | | | 1/5/2009 | | PASS |
Louise Waldorf
|
|
|
|
Routing PW Drainage | | | 1/2/2009 | | FAIL |
Brian Murphy
|
|
|
CROSS DRAINAGE ACCESS AGREEMENT 18 INCHES OF ASTM SAND LENGTH AND WIDTH OF SAND FILTERS. BRIAN MURPHY ###-####
|
Routing PW Sewer Design | 12/23/2008 | | 12/29/2008 | | PASS |
Jon R. Gunnerson
|
|
|
Connect onto 4-inch sanitary sewer service to be constructed under DRI-1479 FirstChurch Commercial Subdivision.
|
Plan resubmittals requested | | | 12/23/2008 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the structural review requesting revisions. JCM
|
Routing - PLANNING Land Div | 12/19/2008 | | 12/23/2008 | | FAIL |
Todd Tucker
|
|
|
The Final Plat has not been recorded yet. As such, DO NOT issue the Building Permit until the Final Plat has been recorded with the Ada County Recorders Office.
|
Routing Off Site - STRUCTURAL | 12/19/2008 | | 12/23/2008 | | FAIL |
John Menard
|
|
|
Called Action Couriers for pick up - Received comment list from consulting structural engineer requesting revisions. JCM
|
Pending Assignment by JCM | 12/19/2008 | | 12/19/2008 | | BLDA |
John Menard
|
|
|
12/19/2008 08:27:55 JCM - activity updated through activity BLDA166 from case BLD08-02568.
|
Plans ACCEPTED BY PLAN TECH | | | 12/18/2008 | | DONE |
Darla L Downs
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 12/18/2008 | | DONE |
|
|
|
|
Routing - PLUMBING | 1/6/2009 | | 1/6/2008 | | FAIL |
Bill VanDegrift
|
|
|
min. grade on the 3" roof drain and overflow will be 1/4" per foot. provide a site plan showing exterior rain water piping from the building to the point of disposal.
|
Routing PW Drainage | 3/9/2009 | | | | FAIL |
Brian Murphy
|
|
|
NO new revisions. Need crosss access agreement
|
Routing PW Drainage | 3/20/2009 | | | | FAIL |
|
|
|
NEED CROSS DRAINAGE ACCESSS AGREEMENT
|