First Notice | | 4/16/2009 | 8/5/2009 | | DONE |
|
|
|
sent by mail 8-5-09
|
FIRE-Final Inspection | 4/15/2009 | 4/16/2009 | 4/16/2009 | A | PASS |
Forrest France
|
|
|
Noted correction items verified for completion, fire life safety passed.
|
BLD-Final | 4/15/2009 | 4/16/2009 | 4/16/2009 | P | PASS |
Dave Hannah
|
|
|
karl Phone #: ###-#### ok for perm occ
|
Permanent Occupancy UNPAID FEE | | | 4/16/2009 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Conference | 4/14/2009 | 4/14/2009 | 4/15/2009 | P | PART |
Dave Hannah
|
|
|
carl Phone #: ###-#### needs fire finals
|
FIRE-Final Inspection | 4/13/2009 | 4/14/2009 | 4/14/2009 | A | FAIL |
Forrest France
|
|
|
The new pair of partition doors when closed create a non-sprinklered space, need to provide missing suite address numbers, provide approved door hardware at the west exits, post max. occupant load signs per review comments, provide directional arrow at the second exit sign for the bar area.
|
Zoning Approval | 4/13/2009 | 4/13/2009 | 4/13/2009 | | DONE |
Colleen T Carroll
|
|
|
Zoning not required
|
FIRE-Final Inspection | 4/10/2009 | 4/10/2009 | 4/10/2009 | P | NR |
Forrest France
|
|
|
Project related fire alarm test failed.
|
BLD-Framing/Rough-in | 3/13/2009 | 3/13/2009 | 3/13/2009 | P | PASS |
Jim Storey
|
|
|
Karl Phone #: ###-#### PLEASE CALL 1/2 HR BEFORE GOING OUT.c/n ok to cover.
|
BLD-Framing/Rough-in | 3/9/2009 | 3/10/2009 | 3/10/2009 | A | PART |
Dave Hannah
|
|
|
Karl- call 30 mins prior to going Phone #: ###-#### ok to cover int walls
|
BLD-Framing/Rough-in | 2/5/2009 | 2/6/2009 | 2/6/2009 | P | PART |
Dave Hannah
|
|
|
karl pence Phone #: ###-#### ok to cover floors and one side wall behind bar
|
BLD-Conference | 1/27/2009 | 1/28/2009 | 1/28/2009 | A | PASS |
Dave Hannah
|
|
|
carl Phone #: ###-####
|
Print Occupancy Form | | | 1/26/2009 | | DONE |
|
|
|
|
Telephone call | | | 1/26/2009 | | |
Cathy Brown
|
|
|
lft vm for jim murray ###-#### that permit and fees are ready to be picked but need GC/RCE #
|
Permit Ready to Issue | | | 1/26/2009 | | DONE |
Cathy Brown
|
|
|
|
Issue PAID IN FULL permit | | | 1/26/2009 | | DONE |
|
|
|
|
Plan resubmittals received | | | 1/23/2009 | | DONE |
|
|
|
received 1 letter of transmittal, 1 response sheet. taken to Tim W.
|
Routing - PLAN CHECK | 1/23/2009 | | 1/23/2009 | | PASS |
Tim L. Woodard
|
|
|
With letter from architect verifying that he would install quick responce heads in the corridor plans were approved. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/23/2009 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 1/5/2009 | | 1/23/2009 | | PASS |
Tim L. Woodard
|
|
|
1/23/2009 15:41:45 TLW - activity updated through activity BLDA022 from case BLD09-00002.
|
Telephone call | | | 1/22/2009 | | DONE |
Tim L. Woodard
|
|
|
Left message with Nate to check on status of corridor issue and to inform him I will be out of office Jan. 27th through Jan. 29th. TLW
|
Plan resubmittals received | | | 1/14/2009 | | |
Tim L. Woodard
|
|
|
Rec'd one copy of tranmittal letter and two copies of response letter and two copies of sheets A2.1 & E2.0- taken to Tim W
|
Routing - PLAN CHECK | 1/5/2009 | | 1/13/2009 | | FAIL |
Tim L. Woodard
|
|
|
Refer to plan review report. TLW
|
Routing - FIRE | | | 1/13/2009 | | PASS |
Tim L. Woodard
|
|
|
Field Verify. TLW
|
1st review completed | | | 1/13/2009 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing PW Sewer Rating | 1/5/2009 | | 1/5/2009 | | PASS |
Louise Waldorf
|
|
|
|
Routing PW Environmental | 1/5/2009 | | 1/5/2009 | | PASS |
Walt Baumgartner
|
|
|
Plans show bar service only. No food service authorized. Plans indicated much of old Boogie Woogies kitchen plumbing to be abandoned. Site has existing GI located in sidewalk.
|
Routing - PUBLIC WORKS | 1/5/2009 | | 1/5/2009 | | PASS |
Beverly Hall
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/5/2009 | | DONE |
Darla L Downs
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/5/2009 | | DONE |
|
|
|
|
Application received | | 1/2/2009 | | | |
|
|
|
|