Second Notice | | 7/23/2009 | 8/10/2009 | | DONE |
|
|
|
|
First Notice | | 6/24/2009 | 7/23/2009 | | DONE |
|
|
|
|
BLD-Final | 6/23/2009 | 6/24/2009 | 6/24/2009 | A | PASS |
Dave Hannah
|
|
|
steve Phone #: ###-#### ok for perm occ
|
Zoning Approval | 6/24/2009 | 6/24/2009 | 6/24/2009 | | DONE |
Matthew A Halitsky
|
|
|
Window only.
|
Permanent Occupancy | | | 6/24/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
FIRE-Final Inspection | 6/23/2009 | 6/23/2009 | 6/23/2009 | P | PASS |
Forrest France
|
|
|
Life safety is satisfactory pending the removal of the manual thumbturn deadbolt at the second exit door to be done prior to structural final for verification at that time.
|
BLD-Conference | 6/12/2009 | 6/12/2009 | 6/12/2009 | P | CANC |
Dave Hannah
|
|
|
Steve Phone #: ###-####
|
BLD-Final | 5/6/2009 | 5/6/2009 | 5/7/2009 | P | NR |
Dave Hannah
|
|
|
steve Phone #: ###-#### ok to use the restroom that was remodeled
|
BLD-Conference | 4/8/2009 | 4/8/2009 | 4/8/2009 | P | DONE |
Dave Hannah
|
|
|
steve - please call 1/2 hr prior Phone #: ###-####
|
Issue PAID IN FULL permit | | | 4/8/2009 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/7/2009 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/7/2009 | | DONE |
|
|
|
|
Telephone call | | | 4/7/2009 | | DONE |
|
|
|
t/c w tim wilson at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 4/7/2009 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 1/8/2009 | | 4/7/2009 | | PASS |
Carl Westfall
|
|
|
4/7/2009 08:18:48 CJW - activity updated through activity BLDA022 from case BLD09-00008.
|
Routing - PLAN CHECK | 3/9/2009 | | 4/6/2009 | | DONE |
Carl Westfall
|
|
|
Sent back to Planning for approval.
|
Routing - PLANNING | 4/6/2009 | | 4/6/2009 | | PASS |
Matthew A Halitsky
|
|
|
Height no greater than 3 feet.
|
Routing - PLAN CHECK | 4/6/2009 | | 4/6/2009 | | DONE |
Carl Westfall
|
|
|
All agencies have signed-off.
|
Plan resubmittals received | | | 3/23/2009 | | |
Tisha Gallop
|
|
|
Received letter addressed to Carl Westfall, copy of e-mail correspondence, 8 1/2" x 11" sketch of outdoor barrier, CDHD review, liability insurance, and license agreements; taken to Carl Westfall
|
Routing - PLANNING | 3/9/2009 | | 3/9/2009 | | FAIL |
Matthew A Halitsky
|
|
|
Certificate of Appropriateness required.
Routed to plan check.
|
Routing - PLAN CHECK | 1/21/2009 | | 3/9/2009 | | PASS |
Carl Westfall
|
|
|
(2-13-09) Started the resubmittal review. (1) If the door swings out a license agreement with ACHD is required, George Slane must approve a modification, and Planning must approve it. (2) Where are the fire dampers at the floor level? (3) Provide a sidewalk seating layout. Approval by the City Clerk is required. (4) Will grab bars be installed in the upgraded Women's restroom? Need to know some answers before the review can continue. Left a message for the Architect. Waiting for a return call.
(3-9-09) Finished the resubmittal review. Drawings approved with "red lines".
|
Plan resubmittals received | | | 3/5/2009 | | |
Carl Westfall
|
|
|
Received transmittal, response letter, letter addressed to George Slane, two copies of Temporary License Agreement and plan sheets cover, A-1, M0.0, M0.1, P1.0, H1.0; taken to Carl Westfall
|
Plan resubmittals received | | | 2/20/2009 | | DONE |
|
|
|
received license agreement for Willib's Saloon Sidewalk Cafe take to Carl Westfall
|
Plan Reviewer's activity | | | 2/17/2009 | | DONE |
|
|
|
Sent an E-mail to follow-up on the voice mail that was left on Friday. Waiting for the resolution of several issues.
|
Plan resubmittals received | | | 2/12/2009 | | |
Carl Westfall
|
|
|
Rec'd transmittal sheet, respose letter and two copies of sheets-A-1, M0.0; M0.1, P1.0; H1.0; taken to Carl W
|
Routing - FIRE | 1/15/2009 | 1/15/2009 | 1/21/2009 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 1/21/2009 | | FAIL |
|
|
|
Failed Plan Check
|
Route to Impact Fee Review | 1/15/2009 | 1/21/2009 | 1/16/2009 | | PASS |
Cindy M. Gould
|
|
|
Tenant improvement no fees
|
Routing - PLAN CHECK | 1/13/2009 | | 1/15/2009 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on January 13, 2009 and was finished on January 15, 2009. Revised drawings were required. See the plan review report.
|
Routing - PLUMBING | 1/9/2008 | | 1/13/2009 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc. a cross connection porotection upgrade may be required for this building.
|
Routing - PUBLIC WORKS | 1/8/2009 | | 1/9/2009 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Sewer Rating | 1/9/2009 | | 1/9/2009 | | PASS |
Louise Waldorf
|
|
|
|
Routing PW Environmental | 1/9/2009 | | 1/9/2009 | | PASS |
Walt Baumgartner
|
|
|
based on current kitchen operation and menu, no grease abatement required at this time.
|
Pending Assignment by JCB | 1/7/2009 | | 1/8/2009 | | DONE |
Jason Blais
|
|
|
|
Override - Parcel Holds | | | 1/7/2009 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/7/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Intake Approval | | | 1/7/2009 | | PASS |
Tim L. Woodard
|
|
|
Central District Health Stamp Recieved. TLW
|
Plans ACCEPTED BY PLAN TECH | | | 1/7/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Intake Approval | | | 1/6/2009 | | FAIL |
Tim L. Woodard
|
|
|
Refer to circled items on checklist attached to this case. TLW
|
Application received | | 1/6/2009 | | | |
Darla L Downs
|
|
|
|