BLD-Final | 2/12/2014 | 2/13/2014 | 2/13/2014 | P | DONE |
Jim Sly
|
|
|
Expired.
|
DOC - Permit Expired | 2/13/2014 | 2/13/2014 | 2/13/2014 | P | PASS |
Jim Sly
|
|
|
|
BLD-Aging Inspection | 2/7/2014 | 2/7/2014 | 2/12/2014 | | CANC |
Jim Sly
|
|
|
|
BLD-Conference | 8/13/2013 | 8/13/2013 | 8/13/2013 | P | PART |
Jim Sly
|
|
|
No one at home....left note to contact me about this project, so I can schedule an appt. with owner.
|
BLD-Aging Inspection | 8/7/2013 | 8/7/2013 | 8/13/2013 | | PEND |
Jim Sly
|
|
|
Scheduled for PM.
|
BLD-Final | 4/18/2013 | 4/19/2013 | 4/19/2013 | A | CANC |
Jim Sly
|
|
|
Travis phone ###-####
|
BLD-Aging Inspection | 5/7/2012 | 5/7/2012 | 5/14/2012 | | PASS |
Jim Sly
|
|
|
|
BLD-Final | 8/22/2011 | 8/22/2011 | 8/23/2011 | P | PEND |
Jim Sly
|
|
|
Called.....no return call. Re-sched.....
|
Issue PAID IN FULL permit | | | 4/22/2009 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/27/2009 | | DONE |
|
|
|
|
Telephone call | | | 3/27/2009 | | DONE |
Barbara Stitt
|
|
|
Left voice message at ###-#### regarding the permit is ready, fees due and need current RP information///3-27-09 @ 9:45am BAS
|
Plan assigned to (PEP) | 1/14/2009 | 1/14/2009 | 3/26/2009 | | PASS |
Perry Paine
|
|
|
3/26/2009 15:07:02 PEP - activity updated through activity BLDA022 from case BLD09-00038.
|
Routing Walk-In (PW Hillside) | 1/13/2009 | 1/13/2009 | 3/26/2009 | P | DONE |
Terry Records
|
|
|
Approved as Category 1 with conditions of approval in letter from Public Works attached to the plan and this case. 3/26/9
1/13/2009 14:53:04 ALR - activity updated through activity BLDI254 from case BLD09-00038.
|
Routing Walk-In (BLD) | 1/13/2009 | 1/13/2009 | 3/26/2009 | P | DONE |
Perry Paine
|
|
|
3/26/2009 15:07:02 PEP - activity updated through activity BLDA022 from case BLD09-00038.
|
Case Summary (BLD) | | | 3/26/2009 | | DONE |
Perry Paine
|
|
|
|
Inspection Record Card- Bld | | | 3/26/2009 | | DONE |
Perry Paine
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/26/2009 | | DONE |
Perry Paine
|
|
|
|
1st review completed | | | 3/26/2009 | | DONE |
Perry Paine
|
|
|
|
Plan resubmittals received | | | 3/13/2009 | | FAIL |
Terry Records
|
|
|
Geotechnical report by MTI indicated that the design for the wall repair was only conceptual and would require further design before it could be considered final. Spoke with Pat Raimes.
Received 1 cover transmittal, 1 copy of hillside report and 4 copies of grading & drainage plans and taken to Terry Records desk///3-13-09 @ 12:00pm BAS
|
Plan resubmittals requested | | | 1/15/2009 | | DONE |
Perry Paine
|
|
|
Mr. Raymes,
RE: BLD09-00038.......ESC09-00006
Upon further review of you submitted plans with fellow plan reviewers, we have agreed that the plans submitted must illustrate the proposed final project. At this time the redlining of the submitted plans is not acceptable for the retaining walls.
Also the design of the pool shall call out the placement of reinforcing due to the lack of fill placement information at the most northern part of the pool that is over that fill, the design of the pool needs to show that the pool will withstand the gravity/water loading.
Also, your ESC plan waiver request has been accepted by Steve Webb.
Best,
Perry
|
Routing - Erosion and Sediment | 1/13/2009 | | 1/14/2009 | | PASS |
Steven Webb
|
|
|
ESC plan waiver approved with attached conditions and soils analysis report recommendations as attached to plans. ESC09-00006
|
Routing Walk-In (Zoning) | 1/13/2009 | 1/13/2009 | 1/13/2009 | P | PASS |
Lucinda Grames
|
|
|
|
Application received | | 1/13/2009 | 1/13/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|