Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD09-00056
StatusExpired
Name CBH
Site Address 1388 S GOLDKING WAY
Project NameUnion Square Sub Club House
Customer Number 
ePlanReviewNo
Description
(Union Square Subdivision Club House) - ** 12-21-09 PLAN MODIFICATION TO ADD INTERIOR WALLS TO CREATE OFFICES, REMOVE A WINDOW AND SIDELIGHT, REMOVE THE BOSTON RIDGE VENT, AND MODIFY THE REAR PATIO PER THE APPROVED PLANS.** To construct a new 1064 square foot, one story, wood framed, residential community clubhouse with a 514 sq.ft. common room, a 128 sq.ft. kitchen, a 72 sq.ft. restroom lobby area, two accessible restrooms, attached 105 sq.ft. covered front patio, attached 120 sq. ft. covered rear patio, a 149 sq.ft. attached pool equipment room, and related site improvements. The occupant load for the clubhouse is 71 and shall be posted in a conspicuous place, near the main exit. This permit does not include the installation of the swimming pool. A separate permit is requried to construct the swimming pool. All construction shall be per the approved plans, Engineering, approvals from all other reviewing departments, and the attached plan review report. DRH08-00397 and CUP08-00009 per Planning and Zoning. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Expired1/14/20111/14/20111/14/2011PPASS
DetailsMike Jordan
Noted to CBH that if they want an extension, that a letter to Jennifer Gilliland would be required. No work has been started to date. Permit is almost 2 years old. Permit is technically expired. Can reopen with Jennifer Gilliland approval.
BLD-Aging Inspection10/29/201010/29/201011/1/2010 CANC
DetailsMike Jordan
Work has not started.
BLD-Aging Inspection1/4/20101/4/20101/4/2010 PASS
DetailsMike Jordan
wip.
CHANGE STATUS TO (ISS)  12/22/2009 DONE
(F) Reprint permit  12/22/2009 DONE
Plan assigned to (SRZ)12/15/200912/15/200912/21/2009 PASS
DetailsSam Zahorka
12/21/2009 11:52:24 SRZ - activity updated through activity BLDA022 from case BLD09-00056.
Routing - PLAN CHECK12/15/2009 12/21/2009 PASS
DetailsSam Zahorka
Case Summary (BLD)  12/21/2009 DONE
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  12/21/2009 DONE
DetailsSam Zahorka
Print Occupancy Form  12/21/2009 DONE
Telephone call  12/21/2009 DONE
called Dave permit ready and fee given 12-21-09 dld
Permit Ready to Issue  12/21/2009  
Routing - PLANNING12/15/2009 12/15/2009 PASS
DetailsAndrea Tuning
Plan Modification Accepted  12/15/2009  
DetailsTisha Gallop
Plan modification accepted for Bld09-00056 (Union Square Club House) to add interior walls to create offices, remove window and side light, remove the Boston Ridge, and modify the rear patio; submitted on sheets S1.1, S2.1, A1.1, A2.1, A3.1, A4.1, A5.1, A7.1, A8.1, A9.1, and revised cert of value; routed to Sam Zahorka
Received Certificate of Value  12/15/2009 DONE
DetailsTisha Gallop
received revised cert of value per Plan Modification submitted 12/15/09; new project value is $37,400; ele $2,800; plm $3,740; mech $5,225; fire n/a
Telephone call  10/5/2009 DONE
Details
tanya faxed over the ACHD receipt and said that they will be the contractor for this job
Issue PAID IN FULL permit  10/5/2009 DONE
Telephone call  9/15/2009 DONE
Details
t/c w tanya w corey barton at ###-#### - she said they are going to be picking up the permit and wanted to know what the fees were - fees given - also need gc name, rce# and ACHD receipt
Routing - PLAN CHECK2/26/2009 3/2/2009 PASS
DetailsSam Zahorka
Plan assigned to (SRZ)1/22/2009 3/2/2009 PASS
DetailsSam Zahorka
3/2/2009 08:53:28 SRZ - activity updated through activity BLDA022 from case BLD09-00056.
PLANS/APPL TAKEN TO FRONT DESK  3/2/2009 DONE
DetailsSam Zahorka
Print Occupancy Form  3/2/2009 DONE
Details
Telephone call  3/2/2009 DONE
Details
t/c w david glancey at ###-#### - permit ready and fees given - also need gc name, rce# and ACHD receipt
Permit Ready to Issue  3/2/2009 DONE
Details
Plan resubmittals received  2/27/2009  
received 1 transmittal,and 3 copies of sheet E1.0 taken to Sam Z..
Plan resubmittals received  2/26/2009  
Received two copies of sheet E1.0; inserted by rep. and taken back to Public Works
Routing - PUBLIC WORKS2/26/2009 2/26/2009 PASS
DetailsBeverly Hall
Routing PW Street Lights2/23/2009 2/26/2009 PASS
DetailsHank Alarcon
.
Routing - PUBLIC WORKS2/20/2009 2/24/2009 FAIL
DetailsBeverly Hall
Routing - PLAN CHECK2/24/2009 2/24/2009 PEND
DetailsSam Zahorka
Others to pass. Routed to Public Works.
Plan resubmittals received  2/24/2009 DONE
received 1 transmittal, and 3 copies of sheet E1.0 had David Glancey insert and returned to Sam Z.
Routing PW Drainage2/20/2009 2/23/2009 PASS
DetailsBrian Murphy
Case Summary (BLD)  2/20/2009 DONE
Routing - PLAN CHECK2/13/2009 2/20/2009 PEND
DetailsSam Zahorka
Pending others to pass. Routed to Public Works drainage.
Routing - FIRE2/9/20092/9/20092/13/2009 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  2/13/2009 FAIL
Failed Public Works, Plan Check
Plan resubmittals received  2/12/2009  
DetailsSam Zahorka
Receieved 1 (2pgs) cover transmittal, 2 copies of G1.1, A1.1, A10.1 and taken to Sam Zahorka's desk///2-12-09 BAS
Plan resubmittals received  2/12/2009  
Rec'd one copy of transmittal letter for Brian; one copy of drainage calcs, storm drain o&m; and two copies of sheets C-1.1 & C-2.1
Telephone call  2/10/2009 DONE
DetailsSam Zahorka
Returned David Glancey's telephone call. Answered questions concerning IBC plan review corrections. Explained routing process and gave him Public Works contact.
Route to Impact Fee Review2/9/20092/12/20092/9/2009 PASS
DetailsCindy M. Gould
Case Summary (BLD)  2/9/2009 DONE
Routing - PLAN CHECK2/4/2009 2/9/2009 FAIL
DetailsSam Zahorka
Emailed corrections to the architect.
Routing - PLANNING1/30/2009 2/4/2009 PASS
DetailsAndrea Tuning
Routing - PLUMBING1/29/2009 1/30/2009 PASS
DetailsBill VanDegrift
per plans and 2003 upc
Routing PW Drainage  1/29/2009 FAIL
DetailsBrian Murphy
NO DRAINAGE REPORT. BRIAN MURPHY ###-####
Routing - Erosion and Sediment1/28/2009 1/29/2009 PASS
DetailsSteven Webb
ESC plan approved with attached conditions. ESC09-00012
Routing - PUBLIC WORKS1/22/2009 1/28/2009 FAIL
DetailsLouise Waldorf
Refer to Street Lighting & Site Drainage
Routing PW Solid Waste1/28/2009 1/28/2009 PASS
DetailsPeter J. McCullough
Approved for wheeled cart service only. Use of dumpsters not permitted.
Routing PW Sewer Rating1/23/2009 1/23/2009 PASS
DetailsLouise Waldorf
Routing - PLANNING Land Div1/22/2009 1/22/2009 PASS
DetailsDave Abo
Lot 2, Block 4 Union Square #1
Plan routing begun/NEW & ADDTN  1/22/2009 DONE
Plans ACCEPTED BY PLAN TECH  1/22/2009 DONE
DetailsDarla L Downs
Recd Pcfee & Taken To Pln CK  1/22/2009 DONE
Pending Assignment by JCM1/22/2009 1/22/2009 BLDA
DetailsJohn Menard
1/22/2009 14:51:26 JCM - activity updated through activity BLDA160 from case BLD09-00056.
Routing PW Sewer Design1/23/2009 1/23/2008 PASS
DetailsJon R. Gunnerson
Connect to existing service provided. Invert at 2710.07
Application received 1/16/2009