(F) Reprint permit | | | 2/11/2010 | | DONE |
|
|
|
|
DOC - Permit Finaled | | | 4/23/2009 | | DONE |
|
|
|
O k to doc final per Bob A. and surety bond has been returned.
|
BLD-Final | 4/20/2009 | 4/21/2009 | 4/21/2009 | A | PASS |
Dave Hannah
|
|
|
Dave .....sending back to you....not comfortable finaling with all the concrete left on site. Jim Sly Contact Jack at 919-845 all buildings have been removed several concrete slabs and foundations still at site not remove at this time to help keep site stable ok per bob archibald ok to release bond
|
BLD-Final | 4/20/2009 | 4/20/2009 | 4/20/2009 | P | DEFR |
Jim Sly
|
|
|
Jack Phone #: ###-#### Deferred to ESC inspector ....and Struct insp familiar with project.
|
BLD-Conference | 1/29/2009 | 1/30/2009 | 1/30/2009 | A | PASS |
Dave Hannah
|
|
|
jack Phone #: ###-####
|
Issue PAID IN FULL permit | | | 1/23/2009 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | 1/22/2009 | | | |
|
|
|
|