BLD-Final | 11/24/2009 | 12/2/2009 | 12/2/2009 | A | PASS |
Tony Young
|
|
|
Matt; Phone #: ###-#### call 1st for key
|
BLD-Final | 12/1/2009 | 12/1/2009 | 12/1/2009 | P | PASS |
Tony Young
|
|
|
Matt; Phone #: ###-#### call 1st for key
|
DOC - Permit Finaled | 12/1/2009 | 12/1/2009 | 12/1/2009 | P | PASS |
Tony Young
|
|
|
c of c issued
|
DOC - Permit Finaled | 12/1/2009 | 12/1/2009 | 12/1/2009 | P | PASS |
Tony Young
|
|
|
c of c issued
|
BLD-Final | 12/1/2009 | 12/1/2009 | 12/1/2009 | P | PASS |
Tony Young
|
|
|
Matt; Phone #: ###-#### call 1st for key
|
BLD-Final | 11/23/2009 | 11/24/2009 | 11/24/2009 | P | NH |
Tony Young
|
|
|
Matt; Phone #: ###-####
|
BLD-Final | 11/20/2009 | 11/23/2009 | 11/23/2009 | P | PART |
Tony Young
|
|
|
Matt; Phone #: ###-#### need key for main level,, basement ok
|
Zoning Approval | 11/23/2009 | 11/23/2009 | 11/23/2009 | | DONE |
Matthew A Halitsky
|
|
|
|
BLD-Energy code compliance | 8/21/2009 | 8/24/2009 | 8/25/2009 | A | PASS |
Tony Young
|
|
|
Chris Phone #: ###-#### Please call 15 min before going out ok to cover all now
|
BLD-Framing/Rough-in | 8/20/2009 | 8/21/2009 | 8/21/2009 | P | PART |
Tony Young
|
|
|
Chris Phone #: ###-#### Please call 15 min before going out,, upper and main level ok to cover,, basement ok after elec passes
|
BLD-Framing/Rough-in | 8/20/2009 | 8/20/2009 | 8/20/2009 | P | PART |
Tony Young
|
|
|
Chris Phone #: ###-#### Please call 15 min before going out on site conf. need a stamp on struct eng letter,, need electrical to look at one more time before cover,, fire blocks as needed
|
Routing Walk-In (BLD) | 7/23/2009 | 7/23/2009 | 7/23/2009 | A | PASS |
Perry Paine
|
|
|
no requirement for access to the basement from the main level interior
|
BLD-Framing/Rough-in | 7/14/2009 | 7/15/2009 | 7/15/2009 | P | PART |
Tony Young
|
|
|
steve Phone #: ###-#### general walk through,, need trades rough ok,, need letter of compliance from structural engineer
|
Plan assigned to (PEP) | 2/13/2009 | 2/13/2009 | 6/10/2009 | | DONE |
Perry Paine
|
|
|
|
BLD-Conference | 4/10/2009 | 4/14/2009 | 4/14/2009 | A | PASS |
Tony Young
|
|
|
Christophe Phone #: ###-#### conf . w/ trade inspectors, owners agent,, trade people,, will need to open walls, will need structural engineer report
|
Routing Walk-In (Zoning) | 4/3/2009 | 4/3/2009 | 4/3/2009 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 4/3/2009 | 4/3/2009 | 4/3/2009 | P | DONE |
Barbara Stitt
|
|
|
4/3/2009 15:10:36 B_S - activity updated through activity BLDC405 from case BLD09-00076.
|
Case Summary (BLD) | | | 4/3/2009 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/3/2009 | | |
|
|
|
|
Received Certificate of Value | | | 4/3/2009 | | DONE |
|
|
|
|
1st review completed | | | 4/3/2009 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/3/2009 | | DONE |
Barbara Stitt
|
|
|
|
Routing Walk-In (BLD) | 3/10/2009 | 3/10/2009 | 3/10/2009 | P | FAIL |
Perry Paine
|
|
|
|
Routing Walk-In (Zoning) | 2/13/2009 | 2/13/2009 | 2/13/2009 | P | PASS |
Matthew A Halitsky
|
|
|
|
Routing Walk-In (BLD) | 2/13/2009 | 2/13/2009 | 2/13/2009 | P | FAIL |
Perry Paine
|
|
|
This project is for the remodel of an existing single family dwelling converting it to a duplex. Applicant was given multifamily dwelling/addition checklist; application and instructions. He will meet with the owners and make decision of how to make this non permitted remodel project.
|
Routing Walk-In (Zoning) | 1/22/2009 | 1/22/2009 | 2/13/2009 | P | DONE |
Tisha Gallop
|
|
|
2/13/2009 14:23:29 LEG - activity updated through activity BLDI254 from case BLD09-00076.
|
Routing Walk-In (BLD) | 3/3/2009 | 3/3/2009 | 2/3/2009 | P | PASS |
Perry Paine
|
|
|
More information required. Applicant was again instructed that they cannot proceed without a plan for the project. they are to return in the next few days. I will consult with srz for assistance. pep2-3-2009
|
Application received | | 1/22/2009 | | | |
|
|
|
|