Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD09-00077
StatusFinaled
Name EKC INC
Site Address 400 N ALLUMBAUGH ST
Project NameDetox Center
Customer Number 
ePlanReviewNo
Description
(Region Four Substance Abuse and Mental Health Crisis Center) - To construct a 9,189 sq. ft.building for use as and "I-2" occupancy care & treatment facility. This building is fully sprinklered as required for occupancy use group. Work includes perimeter footings, foundation, floor/wall/roof construction, interior walls to create rooms & support areas for short term stay / treatment rooms, staff observation and work stations and accessible restrooms & bathing facilities throughout building; installation of electrical, mechanical, plumbing, sprinkler & alarm systems, interior & exterior finishes & millwork; and all associated site work. drs (CUP08-00139) (DRH08-00404)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 7/26/20108/2/2010 DONE
First Notice 6/18/20107/16/2010 DONE
MISC ACTIONS  6/8/2010 DONE
DetailsTisha Gallop
Per April W. in addressing, new address is 400 N Allumbaugh; see attached scanned documents
Permanent Occupancy  6/8/2010 DONE
DetailsTisha Gallop
Zoning Approval6/2/20106/2/20106/2/2010 DONE
DetailsAndrea Tuning
Landscaping has been installed and permanent occupancy can be issued.
CHANGE STATUS TO (TMP)  5/27/2010 DONE
Temporary Occupancy is being extended an additional 90 days to allow contractor (EKC) to complete landscaping. New expiration date is August 30, 2010.
FIRE-Final Inspection5/25/20105/26/20105/26/2010APASS
DetailsTroy Cobbley
Life safety passed.
BLD-Final5/25/20105/26/20105/26/2010PPASS
DetailsTom Arcoraci
Brandon-PLease call at least 30 mins prior to inspection Phone #: ###-####
BLD-Conference4/28/20104/28/20104/28/2010PPASS
DetailsTom Arcoraci
on temp occ
BLD-Aging Inspection4/28/20104/28/20104/28/2010 PASS
DetailsTom Arcoraci
Zoning Approval Temp3/2/20103/2/20103/2/2010 PASS
DetailsJosh Wilson
Temporary occupancy. Bond has been placed with the City for the landscaping.
Temporary Occupancy UNPAID FEE  3/2/2010 DONE
BLD-Final2/25/20102/25/20102/25/2010PPART
DetailsTom Arcoraci
dale Phone #: ###-#### some accessible issues, fire proofing and glass items . ok for temp
FIRE-Final Inspection2/24/20102/24/20102/24/2010PPART
DetailsTroy Cobbley
A temporary occupancy was given with Scott's permission until the privacy curtains have been installed and it is verified that they meet NFPA 13 requirements for obstructions.
FIRE-Final Inspection2/19/20102/22/20102/22/2010PFAIL
DetailsTroy Cobbley
The project related fire alarm inspection was cancelled and the project related fire sprinkler permit had not been called in so I performed a conference with Dale and went over life safety items. Along with needing the project related fire permits satified an exit discharge light needs repaired out of the north exit, fire dept access signage provided and provide a copy of the missing fire life safety plan review notes.
PubWorks Occupancy Approval2/17/20102/17/20102/17/2010 DONE
DetailsTiffany Lowery
Meeting  2/17/2010 DONE
I had a conference with Dale, the superintendent, about the obstructions caused by the common area curtains that have not yet arrived. He requested a temporary occupancy since the building needs to open prior to the arrival of the curtains. I let him know I would need to talk to Scott Arellano.
BLD-Framing/Rough-in2/5/20102/8/20102/8/2010APASS
DetailsTom Arcoraci
Ceiling grid inspection please-Dale Phone #: ###-####
BLD-Other1/26/20101/26/20101/26/2010PPASS
DetailsTom Arcoraci
Dale Phone #: ###-#### wip ok
BLD-Other1/13/20101/20/20101/20/2010APASS
DetailsTom Arcoraci
wip
BLD-Wall cover1/5/20101/13/20101/13/2010APASS
DetailsTom Arcoraci
BLD-Other1/4/20101/5/20101/5/2010APASS
DetailsTom Arcoraci
ceiling cover/Dale Phone #: ###-####
BLD-Wall cover12/9/200912/16/200912/16/2009APASS
DetailsTom Arcoraci
BLD-Framing/Rough-in12/15/200912/15/200912/15/2009PPASS
DetailsTom Arcoraci
dale Phone #: ###-#### wip ok to cover grid fire stop 1 hr walls
BLD-Wall cover12/1/200912/9/200912/9/2009APASS
DetailsTom Arcoraci
wip ok
BLD-Framing/Rough-in12/1/200912/1/200912/1/2009PPASS
DetailsTom Arcoraci
Dale Phone #: ###-#### wip ok
BLD-Wall cover11/19/200911/24/200911/24/2009APASS
DetailsTom Arcoraci
wip ok
BLD-Other11/19/200911/19/200911/19/2009PPASS
DetailsTom Arcoraci
BLD-Wall cover11/18/200911/18/200911/18/2009PPASS
DetailsTom Arcoraci
wip ok
BLD-Wall cover11/13/200911/18/200911/18/2009APASS
DetailsTom Arcoraci
wip ok
BLD-Energy code compliance11/12/200911/13/200911/13/2009APASS
DetailsTom Arcoraci
Dale Phone #: ###-####
BLD-Wall cover11/12/200911/12/200911/12/2009PPASS
DetailsTom Arcoraci
wip ok
BLD-Wall cover11/12/200911/12/200911/12/2009APASS
DetailsTom Arcoraci
wip ok
BLD-Wall cover11/10/200911/11/200911/12/2009PPASS
DetailsTom Arcoraci
wip ok
BLD-Wall cover11/4/200911/11/200911/12/2009APASS
DetailsTom Arcoraci
wip ok
BLD-Wall cover11/4/200911/4/200911/4/2009PPASS
DetailsTom Arcoraci
roof cover ok wip ok checked misc hardware wip ok
BLD-Wall cover11/3/200911/4/200911/4/2009APART
DetailsTom Arcoraci
BLD-Wall cover10/28/200911/4/200911/3/2009APASS
DetailsTom Arcoraci
BLD-Other10/28/200910/28/200910/28/2009PPASS
DetailsTom Arcoraci
wip ok
BLD-Other10/23/200910/23/200910/23/2009PPASS
DetailsTom Arcoraci
BLD-Framing/Rough-in10/20/200910/21/200910/21/2009APART
DetailsTom Arcoraci
dale Phone #: ###-####
BLD-Other10/6/200910/7/200910/7/2009APASS
DetailsTom Arcoraci
dale - roof sheating Phone #: ###-####
BLD-Foundation8/25/20098/26/20098/26/2009PPASS
DetailsMike Jordan
Dale Phone #: ###-####. Interior footings ok.
BLD-Foundation7/8/20097/9/20097/9/2009APART
DetailsTom Arcoraci
Dale Phone #: ###-####
BLD-Footing7/2/20097/6/20097/6/2009PPART
DetailsDave Hannah
Dale Phone #: ###-#### mti will be on site for spec inspection
Issue PAID IN FULL permit  6/8/2009 DONE
OVERRIDE  6/3/2009  
Routing - PLAN CHECK6/2/2009 6/3/2009 PASS
DetailsDan Stuart
Plans & Plat approved by DAA. Plans to permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  6/3/2009 PASS
Print Occupancy Form  6/3/2009 DONE
Details
Telephone call  6/3/2009 DONE
8:50 a.m. Left Richard Bogue a message letting him know permit is ready. I gave him fee amount, let him know we need copy of ACHD impact fee receipt, RP, GC and RCE/T. I also left message for Margie Kennedy at Hummel.
Permit Ready to Issue  6/3/2009 DONE
Details
Plan assigned to (DRS)1/23/2009 6/3/2009 PASS
DetailsDan Stuart
6/3/2009 06:23:17 DRS - activity updated through activity BLDA022 from case BLD09-00077.
Routing - PLANNING Land Div6/1/2009 6/2/2009 PASS
DetailsDave Abo
Final Plat recorded on 6/01/2009.
Routing - PLAN CHECK6/1/2009 6/1/2009 PEND
DetailsDan Stuart
Received copy of approval of final plating from Margie Kennedy. Plans and copy of final signed plat (8-1/2" x 11" sheets) routed to Dave Abo, Planning Land Div
Routing - PLAN CHECK5/1/2009 5/4/2009 PEND
DetailsDan Stuart
Permit pending approval of final platting process / signature's by Dave Abo Planning & Land Division. All other agencies have reviewed and approved the plans with attached conditions which are all part of the reviewed plans.
Plan resubmittals received  5/1/2009  
received 1 transmittal letter,1 resopnse,and 4 copies of sheets A2.02,A2.03,A8.01,M1.02,M2.12,M3.12,E0.01,E0.02,E2.01,E2.02,E2.11,E2.12,E2.21 inserted by Margie from Hummel Arch. Taken back to Dan S.
Plan resubmittals requested  4/17/2009 DONE
Copy of remaining outstanding code compliance items needing to be addressed e-mailed to architect.
Routing - PLAN CHECK4/14/2009 4/17/2009 FAIL
DetailsDan Stuart
Additional resubmittals of items incompletely addressed in resubmittals of 3/26/09 e-mailed to architect.
Routing - PLANNING4/13/2009 4/14/2009 PASS
DetailsSarah Schafer
Construction must comply with the requirements of the CUP approval. DR pass per redlines regarding exterior material colors
Routing - PLANNING4/13/2009 4/13/2009 PASS
DetailsCody Riddle
Cody Riddle- CUP08-00139 & CUP08-00071

Construction must comply with the requirements of CUP approval.
Plan Reviewer's activity  4/13/2009 DONE
Plans were routed back to me in Plan Review without having been routed back to Planning for their review. I took plans to Andrea Tunings desk for here to review and then route to Cody Riddle before comong back to me.
Routing - PLUMBING4/6/2009 4/9/2009 PASS
DetailsBill VanDegrift
provide an approved indirect waste receptor or an air gap fitting for the dishwasher drainage in the day room.
Routing PW Sewer Rating4/3/2009 4/6/2009 PASS
DetailsConnie Baumgartner
Plan resubmittals received  4/6/2009  
DetailsTisha Gallop
Received three copies of sheets C1.0, C2.0, C3.0, C4.0, C6.0, C6.1, one copy of Shallow Injection Well Inventory Form and check for $75.00. Plans and form given to Brian Murphy per his request and check for $75 put in safe to apply to fees when permit is ready to be issued.
(F) Reprint permit  4/6/2009 DONE
DetailsTisha Gallop
Routing - PUBLIC WORKS3/30/2009 4/6/2009 PASS
DetailsBeverly Hall
Routing PW Drainage3/31/2009 4/3/2009 PASS
DetailsBrian Murphy
Routing - PLANNING Land Div3/26/2009 3/30/2009 FAIL
DetailsDave Abo
Final Plat is not recorded.
Plan resubmittals received  3/26/2009  
DetailsTisha Gallop
Received transmittal, response letter from Hummel Architects, response letter from WRG Design, Project Start Up for Special Inspections application, ES Legacy Report, Alternate Code Request, four copies of drainage report and three copies of pages A0.03, A1.01, A1.02, A2.02, A2.03, A2.04, A2.05, A2.06, A5.01, A7.01, A8.01, A8.03, A8.04, A8.07, A8.09, A9.01, A9.02, S5.01, S0.01, M0.00, M1.01, M1.02, M2.11, M2.12, M3.12 and four copies of sheets C1.0, C2.0, C3.0, C4.0, C4.1, C5.0, C6.0, C6.1, ESC-1, ESC-2, L1.01, L2.01; inserted by arch. rep. and taken back to Dan Stuart
Routing - PLAN CHECK3/5/2009 3/26/2009 PEND
DetailsDan Stuart
New resubmittal sheets inserted into original plans with old sheets removed by architects representative. Plans routing for review by all previously failed agencies.
Routing Off Site - STRUCTURAL3/17/2009 3/25/2009 PASS
DetailsDan Stuart
RECEIVED E-MAIL FROM CONTRACT STRUCTURAL ENGINEERING REVIEW FOR THIS PROJECT. RESUBMITTALS ANSWERED ALL QUESTIONS. NO ADDITIONAL COMMENTS OR CONCERNS OF STRUCTURAL REVIEW.
Telephone call  3/17/2009 DONE
DetailsTisha Gallop
Called Action Couriers for pick up
Plan resubmittals received  3/16/2009  
DetailsDan Stuart
Received 1 cover transmittal, 3 copies of responses from Lochsa Engineering (Calcs), 3 copies of sheets S0.01, S1.01, S1.02, S1.03, S4.01, S5.01, S5.02, S5.03, S5.04, S6.01, S7.01 and taken to Dan Stuart's desk 3-16-09 @ 3:55pm BAS
Route to Impact Fee Review3/6/20093/11/20093/9/2009 PASS
DetailsCindy M. Gould
Routing - FIRE3/3/20093/6/20093/5/2009 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  3/5/2009 FAIL
Failed Public Works, Erosion & Soil Control, Structural, Plumbing, Planning, Plan Check
Plan resubmittals requested  3/3/2009 DONE
Routing - PLAN CHECK2/10/2009 3/3/2009 FAIL
DetailsDan Stuart
Copy of plan review e-mailed to architect. resubmittals required. Plans routed to fire code analyst.
Routing - PLANNING2/9/2009 2/10/2009 FAIL
DetailsSarah Schafer
Sarah Schafer - DRH08-00198
Susan Riggs - CUP08-00071

The applicatn has not met condition 1d and 1i. The applicant will be required to submit written documentation form the Boise City Public Works Department approving the location of the trash enclosure. The applicant has also submitted a landscape plan that includes permabark even though condition 1i specifically states that permabark is prohibited and an organic bark mulch must be utilized in all planters. 2-10-19 ANT for SMS
Routing Off Site - STRUCTURAL1/23/2009 2/9/2009 FAIL
DetailsDan Stuart
Recieved PDF copy of structural plan review. Corrections and resubmittals required. Copy of structural plan review PDF report attached to e-maile to Margie Kennedy, Hummel Architects, to coordinate response from Lochsa Engineering, as the Design Professional In Responsible Charge.
Routing - PLUMBING2/3/2009 2/9/2009 FAIL
DetailsBill VanDegrift
P-5 floor drain at the coffee makers in rooms 136 day room and room 209 control room must not be located with in a cabinet. Page A2.02 shows a flushing floor sink in room 202, plumbing plans show a P-5 floor drain. verify. show water lines to P-4 flushing floor sinks. A2.03 shows a flushing clinical sink in room 114, fixture schedule lists a utility sink with 2" waste and 1/2" supplies. verify. IBCrequires a high/low drinking fountain, provide location. P-1. P-2. P-3 requireflushometer valves. fixture schedule shows 1/2" supplies, update fixture schedule. Note 7 page A 2.03 shows "water", provide water supplies, waste connections and fixture schedule listing.
Plan resubmittals requested  2/9/2009 DONE
Copy of PDF structural plan review document attached to e-mail to Margie Kennedy. Engineering resubmittals are required.
Routing PW Solid Waste2/3/2009 2/3/2009 PASS
DetailsPeter J. McCullough
Routing PW Sewer Rating2/2/2009 2/3/2009 FAIL
DetailsConnie Baumgartner
Routing - Erosion and Sediment2/3/2009 2/3/2009 PASS
DetailsSteven Webb
ESC plan approved with attached conditions. ESC09-00021.
Routing - PUBLIC WORKS1/26/2009 2/3/2009 FAIL
DetailsConnie Baumgartner
Failed by Brian Murphy in drainage. ###-####
Routing PW Drainage1/28/2006 2/2/2009 FAIL
DetailsBrian Murphy
BOISE CITY STORMWATER INSPECTION NOTE FOR SEEPAGE BED,GRADING 2 FEET P LINE?SHORT CIRCUITING IN BED AND SAND DEPTH. BRIAN MURPHY ###-####
Routing PW Street Lights1/27/2009 1/28/2009 PASS
DetailsHank Alarcon
Routing - PLANNING Land Div1/23/2009 1/26/2009 FAIL
DetailsDave Abo
Do not issue building permit until Final Plat of Lanier's Promise Subdivision is recorded.
Application received 1/23/20091/23/2009 DONE
DetailsAlexandra L. DeYoung
Pending Assignment by JCM1/23/2009 1/23/2009 BLDA
DetailsJohn Menard
1/23/2009 10:49:48 JCM - activity updated through activity BLDA168 from case BLD09-00077.
Plan routing begun/NEW & ADDTN  1/23/2009 DONE
DetailsAlexandra L. DeYoung