Case Summary (BLD) | | | 5/6/2010 | | DONE |
Sam Zahorka
|
|
|
|
Second Notice BLD | 3/4/2009 | 3/4/2009 | 3/31/2009 | | DONE |
Patricia Smith
|
|
|
First Notice has not been responded to.
|
First Notice | 2/12/2009 | 2/12/2009 | 3/4/2009 | | DONE |
Mike Jordan
|
|
|
|
BLD-Final | 2/11/2009 | 2/12/2009 | 2/12/2009 | A | PASS |
Mike Jordan
|
|
|
gary Phone #: ###-####
|
DOC - Permit Finaled | 2/12/2009 | 2/12/2009 | 2/12/2009 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 2/12/2009 | 2/12/2009 | 2/12/2009 | A | PASS |
Mike Jordan
|
|
|
gary Phone #: ###-####
|
BLD-Framing/Rough-in | 2/6/2009 | 2/6/2009 | 2/6/2009 | P | PASS |
Jim Sly
|
|
|
Roger Phone #: ###-####
|
BLD-Footing | 2/3/2009 | 2/3/2009 | 2/3/2009 | P | PASS |
Mike Jordan
|
|
|
Roger Phone #: ###-####. Footings for new patio cover.
|
Plan assigned to (SRZ) | 1/30/2009 | 1/30/2009 | 1/30/2009 | | PASS |
Sam Zahorka
|
|
|
1/30/2009 14:12:41 SRZ - activity updated through activity BLDA022 from case BLD09-00095.
|
CHANGE STATUS TO (REV) | | | 1/30/2009 | | |
Sam Zahorka
|
|
|
|
1st review completed | | | 1/30/2009 | | DONE |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/30/2009 | | DONE |
Sam Zahorka
|
|
|
|
Case Summary (BLD) | | | 1/30/2009 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/30/2009 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 1/30/2009 | | DONE |
Barbara Stitt
|
|
|
Called Roger and told him that permit is ready & fees due///1-30-09 BAS
|
Permit Ready to Issue | | | 1/30/2009 | | DONE |
Barbara Stitt
|
|
|
|
Issue PAID IN FULL permit | | | 1/30/2009 | | DONE |
Tisha Gallop
|
|
|
|
Case Summary (BLD) | | | 1/30/2009 | | DONE |
Sam Zahorka
|
|
|
|
Telephone call | | | 1/30/2009 | | DONE |
Sam Zahorka
|
|
|
Telephone conversation with Joe Lane at Lochsa Engineering about the Engineering calculations. The 2003 IBC references the same wood design standard (National Design Specification) NDS as the 2006 IBC. The Patio cover has been designed within the stress limits of the adopted codes and is designed to resist the minimum wind and seismic loads set forth in this code. SRZ
|
Routing - PLAN CHECK | 1/28/2009 | | 1/30/2009 | | PASS |
Sam Zahorka
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/28/2009 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/28/2009 | | DONE |
Darla L Downs
|
|
|
|
Application received | | 1/28/2009 | | | |
|
|
|
|