Third Notice | | 11/24/2009 | 11/16/2009 | | DONE |
|
|
|
|
Third Notice | | 10/25/2009 | 11/10/2009 | | DONE |
|
|
|
faxed and mailed
|
Second Notice | | 10/9/2009 | 10/15/2009 | | DONE |
|
|
|
|
First Notice | | 9/26/2009 | 9/29/2009 | | DONE |
|
|
|
|
Permanent Occupancy | | | 9/16/2009 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 9/14/2009 | 9/15/2009 | 9/15/2009 | A | PASS |
Tony Young
|
|
|
Harry Phone #: ###-#### card was signed by inspector, but open alarm permit in computer
|
Zoning Approval | 9/15/2009 | 9/15/2009 | 9/15/2009 | | PASS |
David Moser
|
|
|
CUP08-00132
|
Temporary Occupancy UNPAID FEE | | | 9/15/2009 | | DONE |
Tisha Gallop
|
|
|
|
FIRE-Final Inspection | 9/14/2009 | 9/14/2009 | 9/14/2009 | P | PASS |
Troy Cobbley
|
|
|
life safety passed. the emergency lights have been repaired.
|
FIRE-Final Inspection | 9/11/2009 | 9/11/2009 | 9/11/2009 | P | FAIL |
Troy Cobbley
|
|
|
Both of the exit discharge lights need repaired and the emergency light in the north exit corridor from the new locker room needs repaired. I notified the general contractor that when the forward flush on the sprinkler system was performed all of the dirt and debri would be washed down to Hill Road and cause problems with Erosion Control.
|
BLD-Final | 9/11/2009 | 9/11/2009 | 9/11/2009 | P | NR |
Tony Young
|
|
|
Harry Phone #: ###-#### need trades
|
BLD-Other | 8/24/2009 | 8/25/2009 | 8/25/2009 | A | PASS |
Mike Jordan
|
|
|
Harry Phone #: ###-####. Ceiling grid ok.
|
BLD-Framing/Rough-in | 7/24/2009 | 7/27/2009 | 7/27/2009 | A | PART |
Tony Young
|
|
|
harry Phone #: ###-#### 2 hr ok
|
BLD-Framing/Rough-in | 7/23/2009 | 7/24/2009 | 7/24/2009 | A | PART |
Jim Storey
|
|
|
perry Phone #: ###-#### ok to cover all but hard lid so to insp. of 2 hr fire stopping above ceilling.
|
Elevation Cert Rec'd-Final | | | 6/11/2009 | | PASS |
|
|
|
|
BLD-Other | 5/11/2009 | 5/12/2009 | 5/12/2009 | A | DONE |
Mike Jordan
|
|
|
Herry Phone #: ###-####. Will have special insp. Noted some changes in rebar, check rfi. Will recall footing insp when ready. Also noted bottom of footing has been approved by special insp. agency.
|
Issue PAID IN FULL permit | | | 5/8/2009 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/6/2009 | | PASS |
|
|
|
|
Print Occupancy Form | | | 5/6/2009 | | DONE |
|
|
|
|
Telephone call | | | 5/6/2009 | | DONE |
|
|
|
t/c w scott henson at ###-#### - permit ready and fees given - also need gc name and rce#
|
Permit Ready to Issue | | | 5/6/2009 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/27/2009 | | 5/6/2009 | | PASS |
Dan Stuart
|
|
|
Plans approved by all reviewing agencies W/ conditions of reviewing agencies attached to and considered part of the reviewed plans. Inserted new S-1 Sheet and calc sheet and modified plan review conditions.To permit desk to issue.
|
Routing Off Site - STRUCTURAL | 5/5/2009 | | 5/6/2009 | | PASS |
Dan Stuart
|
|
|
Letter from Structural Engineer, Keith Jones, approving structural. New Sheet S-1 and calculations provided to indicate correct rebar lap for masonry wall.
|
Plan assigned to (DRS) | 2/2/2009 | | 5/6/2009 | | PASS |
Dan Stuart
|
|
|
5/6/2009 07:40:28 DRS - activity updated through activity BLDA022 from case BLD09-00109.
|
Telephone call | | | 5/5/2009 | | DONE |
|
|
|
Talked with Steve Call, Design Engineer for metal building foundation and CMU wall. Center column bolting to be (4) 3/4" x 12" in length. Redlined on plans.
|
Plan resubmittals received | | | 5/5/2009 | | |
|
|
|
Received 1 transmittal,3 re-bar 8 1/2 x11 and 3 copies of sheet S1.0 taken to Dan S.
|
Routing Off Site - STRUCTURAL | 4/27/2009 | | 4/30/2009 | | FAIL |
Dan Stuart
|
|
|
Resubmittals required for slender masonry wall design for lap splices and details on Sheet S1.0. Sent by e-mail to architect.
|
Plan resubmittals requested | | | 4/30/2009 | | DONE |
|
|
|
Copy of items needing corrected and resubmitted e-mailed to architect.
|
Plan resubmittals received | | | 4/24/2009 | | |
Tisha Gallop
|
|
|
Received transmittal, three copies of plans for pre-engineered steel building, three copies of calcs for pre-engineered steel building, three copies of supplemental structural calcs and plan sheets S2.0, S2.1, S3.1; inserted by arch. rep. and taken back to Dan Stuart
|
Routing - PLAN CHECK | 3/6/2009 | | 3/9/2009 | | FAIL |
Dan Stuart
|
|
|
New plan sheet A1.1 inserted into plans. Revised corrected Alternate Request Letter provided for review for approval by building offical and fire marshall. Copy of letter to building official.
Structural plans, engineering calcs and verification that current design data for foundation is compliant with structural building plans when received. Copy e-mailed to architect.
|
Route to Impact Fee Review | 3/6/2009 | 3/11/2009 | 3/6/2009 | | PASS |
Cindy M. Gould
|
|
|
|
Plan resubmittals received | | | 3/6/2009 | | |
Dan Stuart
|
|
|
Received four copies of sheet A1.1; taken to Dan Stuart
|
Plan Reviewer's activity | | | 3/5/2009 | | DONE |
|
|
|
Began review of plan resubmittals of 2/23/09. Note on Plan Sheet A1.1 concerning the Alternate Request Letter and the type of construction for the new building were incorrect. E-mailed architect indicating information to be added to Sheet A1.1 concerning alternate request and the approval there of by the Building Official & Fire Marshall. Requested four corrected copies of this sheet.
|
Plan resubmittals requested | | | 3/5/2009 | | DONE |
|
|
|
Requested corrected Sheet A1.1, four copies, with corrected note & details for the Alternate Request Letter and correct construction type for the new addition to Scott Henson.
|
Plan Reviewer's activity | | | 3/5/2009 | | DONE |
|
|
|
Notified by architect that the modified Alternate Request Letter of 2/23/09 was not the alternate signed by the B.O & F. M. I reviwed the signed document and he was correct. I reviewed the alternate request letter of 2/23/09 and found that the code analysis for the original building and then the code analysis with the new addition to the existing with the new sprinkler system were not corrected per my e-mail to architect of 2/22/09. I added suggested corrections to the code analysis data to sheet 1 & 2 of alternate request letter and code equations used and e-mailed to architect to correct on letter and then resubmit pages 1 & 2 and I will take to building official and fire marshall for there signature so that all data in the letter is correct and in agreement with proposals for acceptance by Boise City.
|
Plan Reviewer's activity | | | 3/5/2009 | | DONE |
|
|
|
Notified by e-mail that the project had gone out to bid and once awarded the winning contractor would work on providing building four sets of plans and three sets of design / engineering calcs all stamped by and Idaho licensed structural engineer for review. Once received, the plans will be imediately routed to Boise City PDS contract structural review engineering company for review and comment. It was estimated by architect that this could be in two to three weeks. I will continue the review process on plan resubmittals of 2/23/09.
|
Routing - PLAN CHECK | 2/19/2009 | | 3/5/2009 | | FAIL |
Dan Stuart
|
|
|
Incorrect data on plans for code analysis and incorrect data in Alternate request letter. Corrections suggested for code analysis to plans and to the Alternate letter were e-mailed to the architect.
Resubmittals required.
|
Plan resubmittals received | | | 3/5/2009 | | DONE |
|
|
|
received 1 transmittal and 1 plan acceptance from ACHD. taken to Dan S.
|
Plan Reviewer's activity | | | 2/26/2009 | | DONE |
|
|
|
Received copy of approval of alternate for Hillside Jr. High with signatures of George Slane, B.O. and Mark Senteno, Fire Marshall and sent PDF copy to Scott Henson, LCA, for his records.
|
Plan resubmittals received | | | 2/25/2009 | | |
Dan Stuart
|
|
|
Received transmittal, response letter, Project Start Up for Special Inspection application, three copies of Structural Calculations, and four copies of plan sheets A1.1, A2.0, A5.0, A6.0, U1, M0.0, M3.0, M4.0; inserted by arch. rep. and taken back to Dan Stuart
|
Routing - PUBLIC WORKS | 2/18/2009 | | 2/19/2009 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Flood Plain | 2/19/2009 | | 2/19/2009 | | PASS |
Jim Wyllie
|
|
|
Received Elevation Certificate showing compliance with Boise City Floodplain Ordinance Requirements. Jim Wyllie / ###-####
|
Routing - Erosion and Sediment | 2/19/2009 | | 2/19/2009 | | PASS |
Steven Webb
|
|
|
ESC plan approved under BLD09-00108
|
Routing - FIRE | 2/12/2009 | 3/6/2009 | 2/18/2009 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 2/18/2009 | | FAIL |
|
|
|
Failed Public Works, Erosion & Soil Control, and Plan Check
|
Routing - PLAN CHECK | 2/18/2009 | | 2/18/2009 | | FAIL |
Dan Stuart
|
|
|
Routing plans back to public works for flood plain recheck.
|
Plan resubmittals requested | | | 2/12/2009 | | DONE |
|
|
|
Plan review report with required resubmittals e-mailed to architect.
|
Routing - PLAN CHECK | 2/5/2009 | | 2/12/2009 | | FAIL |
Dan Stuart
|
|
|
Resubmittals required. Original structural submittals and engineering for metal building were not provided. Copy of plan review e-mailed to architect. Routing to fire code analyst for review.
|
Routing - PLANNING | 2/4/2009 | | 2/9/2009 | | PASS |
David Moser
|
|
|
cup08-00132 David Moser
|
Routing - PLUMBING | 2/4/2009 | | 2/4/2009 | | PASS |
Bill VanDegrift
|
|
|
locker rooms and grading plans ok
|
Routing PW Drainage | 2/3/2009 | | 2/4/2009 | | PASS |
Brian Murphy
|
|
|
LESS THAN 10 %.
|
Routing - Erosion and Sediment | 2/4/2009 | | 2/4/2009 | | FAIL |
Steven Webb
|
|
|
This ESC permit is to cover Bld09-00108 (grading/drainage) and Bld09-00109 (building addition) for Hillside Jr High School. ok per Jason B.
|
Routing - PUBLIC WORKS | 2/3/2009 | | 2/4/2009 | | FAIL |
Louise Waldorf
|
|
|
Refer to flood plain review by JEW
|
Routing PW Sewer Rating | | | 2/4/2009 | | PASS |
Louise Waldorf
|
|
|
|
Routing PW Flood Plain | 2/4/2009 | | 2/4/2009 | | FAIL |
Jim Wyllie
|
|
|
Elevation Certificate not provided with building plans. Elevation Certificate showing compliance with Boise City Floodplain Ordinance needs to be provided prior to building permit approval. Jim Wyllie / ###-####
|
Routing - PLANNING Land Div | 2/2/2009 | | 2/3/2009 | | PASS |
Todd Tucker
|
|
|
Property is larger than five acres in size.
|
Routing - Addressing | 2/3/2009 | | 2/3/2009 | | PASS |
April Wing
|
|
|
|
Pending Assignment by JCM | 2/2/2009 | | 2/2/2009 | | BLDA |
John Menard
|
|
|
2/2/2009 11:35:01 JCM - activity updated through activity BLDA168 from case BLD09-00109.
|
Routing Off Site - STRUCTURAL | 2/2/2009 | | 2/2/2009 | | FAIL |
Dan Stuart
|
|
|
No structural plans and calculations submitted for the pre-engineered metal building. Plans will be routed for outside review after receiving required structural plans and calcs. JCM
|
Plans ACCEPTED BY PLAN TECH | | | 2/2/2009 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/2/2009 | | DONE |
Tisha Gallop
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 2/2/2009 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | 1/30/2009 | | | |
|
|
|
|
Routing - PUBLIC WORKS GRADING | | | | | PASS |
Terry Records
|
|
|
Not hillside
|