First Notice | 6/2/2009 | 6/2/2009 | 11/16/2009 | | DONE |
Jim Sly
|
|
|
|
Telephone call | | | 11/13/2009 | | DONE |
Tisha Gallop
|
|
|
spoke to Tim Kelly/Elk Run Const. said final project value includes grading phase bld09-00113.
|
PubWorks Occupancy Approval | 7/31/2009 | 7/31/2009 | 7/31/2009 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 6/2/2009 | 6/3/2009 | 6/3/2009 | A | PASS |
Jim Sly
|
|
|
|
BLD-Final | 6/1/2009 | 6/2/2009 | 6/2/2009 | A | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 6/2/2009 | 6/2/2009 | 6/2/2009 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 6/1/2009 | 6/1/2009 | 6/1/2009 | P | CANC |
Jim Sly
|
|
|
Re-sched....
|
Issue PAID IN FULL permit | | | 2/27/2009 | | DONE |
Barbara Stitt
|
|
|
|
Routing - PLAN CHECK | 2/20/2009 | | 2/24/2009 | | PASS |
Alexandra L. DeYoung
|
|
|
Alex Rahn
|
Telephone call | | | 2/24/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
LM for Tim Kelly- permit ready, fees given
|
Permit Ready to Issue | | | 2/24/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
1st review completed | | | 2/20/2009 | | PASS |
|
|
|
|
Routing - FIRE | 2/17/2009 | | 2/20/2009 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans. Existing FD access roadways shall be maintained and unobstructed during construction.
|
Routing - PLANNING | 2/13/2009 | | 2/17/2009 | | PASS |
Josh Wilson
|
|
|
Josh Wilson- DRH08-00324
|
Routing - PLUMBING | 2/12/2009 | | 2/13/2009 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Routing - Erosion and Sediment | 2/11/2009 | | 2/12/2009 | | PASS |
Clint A Smith
|
|
|
ESC09-00031 plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 2/3/2009 | | 2/11/2009 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Street Lights | | | 2/11/2009 | | PASS |
Hank Alarcon
|
|
|
|
Routing PW Sewer Rating | 2/11/2009 | | 2/11/2009 | | PASS |
Louise Waldorf
|
|
|
|
Routing PW Solid Waste | 2/11/2009 | | 2/11/2009 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Drainage | 2/3/2009 | | 2/6/2009 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLANNING Land Div | 2/3/2009 | | 2/3/2009 | | PASS |
Dave Abo
|
|
|
Parcel 2 of Record of Survey #5242.
|
Routing - Addressing | 2/3/2009 | | 2/3/2009 | | PASS |
April Wing
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/2/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Routing PW Sewer Design | 2/4/2008 | | 2/10/2008 | | PASS |
Jon R. Gunnerson
|
|
|
Connect onto service provided
|
Application received | | 2/2/2009 | | | |
Alexandra L. DeYoung
|
|
|
|
Plan assigned to (ALR) Alex | 2/2/2009 | | | | |
Alexandra L. DeYoung
|
|
|
|