Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD09-00122
StatusFinaled
Name JORDAN-WILCOMB CONSTRUCTION
Site Address 600 N ROBBINS RD
Project NameIdaho Elks Rehabilitation
Customer Number 
ePlanReviewNo
Description
Boise Internal Medicine - Idaho Elks Rehab Tenant improvements to an existing 3rd floor tenant space work to include the removal of most of the interior non-bearing partition walls and the construction of new exam rooms, reception area, ADA compliant unisex bathroom, treatment area and new offices. The existing entry will also be reconfigured and reconstructed to maintain the one hour corridor. All work to be done per the approved plans. This is a fully sprinklered building, any alteration to the existing sprinkler system will require a separate permit and shall comply with NFPA#13 as regulated by The City of Boise Fire Department. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  3/11/2014 DONE
MISC ACTIONS  10/23/2009 DONE
DetailsTisha Gallop
Jordan-Wilcomb Const. put on hold until receive final values//ok per Rita
Third Notice 9/15/200910/8/2009 DONE
called, faxed, and mailed
Telephone call  10/8/2009 DONE
DetailsTisha Gallop
called and spoke with Russ Hibbs/Jordan-Wilcomb Const. need final value within next couple of weeks. He said would work on them and expressed concern with owner being resposible for final fees not contractor and owner will know what final values are. I told him this is policy, that if he can get me the final values and owner contact info if any final fees I will speak to my supervisor if we can send bill to owner.//Rita said ok
Third Notice 9/4/20099/15/2009 DONE
Third Notice 8/11/20099/4/2009 DONE
Second Notice 7/22/20098/11/2009 DONE
First Notice 5/11/20097/22/2009 DONE
Permanent Occupancy  5/11/2009 DONE
BLD-Final5/8/20095/8/20095/8/2009PPASS
DetailsDave Hannah
John Phone #: ###-####ok for perm occ
FIRE-Final Inspection5/6/20095/7/20095/8/2009APASS
DetailsForrest France
Fire life safety inspection completed satisfactory.
BLD-Other4/29/20094/29/20094/29/2009PPART
DetailsDave Hannah
John Phone #: ###-####ok to cover ceiling
BLD-Framing/Rough-in3/17/20093/18/20093/19/2009PPASS
DetailsDave Hannah
john Phone #: ###-####
Plan assigned to (CDM)2/4/20092/4/20092/10/2009 PASS
DetailsCarl D Madsen
2/10/2009 10:23:03 CDM - activity updated through activity BLDA022 from case BLD09-00122.
Routing - FIRE2/9/2009 2/10/2009 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  2/10/2009 PASS
Routing - PLAN CHECK2/10/2009 2/10/2009 PASS
DetailsCarl D Madsen
Case Summary (BLD)  2/10/2009 DONE
PLANS/APPL TAKEN TO FRONT DESK  2/10/2009  
Print Occupancy Form  2/10/2009 DONE
Details
Permit Ready to Issue  2/10/2009 DONE
Telephone call  2/10/2009 DONE
Called Bryan permit ready and fee given ///DLD
Issue PAID IN FULL permit  2/10/2009 DONE
DetailsAlexandra L. DeYoung
Routing - PLAN CHECK2/4/2009 2/9/2009 PASS
DetailsCarl D Madsen
Pass with comments 2-9-08 CDM
Telephone call  2/5/2009 DONE
Called Brian Galbreth to claify toilet height was not for childrens use and he indicated that it should be for standard acessabillity. Also checked to see if he was using min 3/4 hour rated glazing on the south wall of the entry area, he indicated that they would be using 1 hour glazing. Both items will be redlinned on the plans. 2-5-09 CDM
Routing PW Sewer Rating2/4/2009 2/4/2009 PASS
DetailsLouise Waldorf
Routing - PUBLIC WORKS2/4/2009 2/4/2009 PASS
DetailsBeverly Hall
Plans ACCEPTED BY PLAN TECH  2/4/2009 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  2/4/2009 DONE
DetailsTisha Gallop
Application received 2/4/2009