BLD-Final | 3/25/2010 | 3/25/2010 | 3/25/2010 | A | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 3/25/2010 | 3/25/2010 | 3/25/2010 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 2/13/2009 | 2/17/2009 | 2/19/2009 | P | FAIL |
Dave Hannah
|
|
|
Lee Downum ###-#### or cell ###-####//please call 20 min prior to meet you needs an engineer to evaluate the three trusses that have cuts in bottom cords also need to do something about paper on insulation in roof
|
FIRE-Final Inspection | 2/13/2009 | 2/17/2009 | 2/17/2009 | A | FAIL |
Forrest France
|
|
|
Discussed items needed for final including fire extinguishers certified, tagged and mounted at no higher than 48" AFF, provide two illuminated exit signs, provide approved hardware at the second exit door, provide signage at the main entry/exit, install covers for open junction boxes at exposed wiring several locations, repair breaker panel, no occupancy permitted at the second floor per plan review notes, housekeeping needs attention.
|
Plans ACCEPTED BY PLAN CHECK | | | 2/13/2009 | | DONE |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | 2/13/2009 | | 2/13/2009 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 2/13/2009 | | 2/13/2009 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 2/13/2009 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/13/2009 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 2/13/2009 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/13/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Permit Ready to Issue | | | 2/13/2009 | | DONE |
|
|
|
|
Telephone call | | | 2/13/2009 | | DONE |
|
|
|
Talked to Lee- permit is ready to pick up
|
Issue PAID IN FULL permit | | | 2/13/2009 | | DONE |
Tisha Gallop
|
|
|
|
First Notice | 3/25/2010 | 3/25/2010 | | | |
Dave Hannah
|
|
|
|
Application received | | 2/5/2009 | | | |
|
|
|
|