BLD-Aging Inspection | 3/19/2010 | 3/19/2010 | 3/19/2010 | | DONE |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 3/19/2010 | 3/19/2010 | 3/19/2010 | P | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 1/6/2010 | 1/6/2010 | 1/11/2010 | | FAIL |
Jim Storey
|
|
|
pending esc
|
BLD-Final | 1/11/2010 | 1/11/2010 | 1/11/2010 | P | PART |
Jim Storey
|
|
|
pending esc fail to pass for doc final.
|
PubWorks Occupancy Approval | 12/2/2009 | 12/2/2009 | 12/2/2009 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Aging Inspection | 11/5/2009 | 11/5/2009 | 11/9/2009 | | FAIL |
Jim Storey
|
|
|
no requist to final bld or public works permits.
|
BLD-Aging Inspection | 8/24/2009 | 8/24/2009 | 8/27/2009 | | FAIL |
Jim Storey
|
|
|
no requist to final bld or public works permits.
|
BLD-Aging Inspection | 6/22/2009 | 6/22/2009 | 6/22/2009 | | NR |
Jim Storey
|
|
|
no requist for insp.
|
Issue PAID IN FULL permit | | | 3/23/2009 | | DONE |
Tisha Gallop
|
|
|
|
Case Summary (BLD) | | | 3/20/2009 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 3/20/2009 | | DONE |
Tisha Gallop
|
|
|
Called and left voice message for Jim Conger that permit is ready and fee
|
Permit Ready to Issue | | | 3/20/2009 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PUBLIC WORKS | 3/12/2009 | | 3/19/2009 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Drainage | 3/12/2009 | | 3/19/2009 | | PASS |
Brian Murphy
|
|
|
rough grading only
|
Routing - PUBLIC WORKS | 2/26/2009 | | 3/5/2009 | | FAIL |
Louise Waldorf
|
|
|
Refer to site drainage
|
Routing PW Drainage | 2/26/2009 | | 3/5/2009 | | FAIL |
Brian Murphy
|
|
|
have been waiting for geo tech letter which we were told would arrive each day Has not come and I am returning plan until we recieve letter.
|
Routing - Erosion and Sediment | 2/17/2009 | | 2/18/2009 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions. ESC09-00045
|
Routing - PUBLIC WORKS GRADING | 2/5/2009 | | 2/17/2009 | | FAIL |
Louise Waldorf
|
|
|
Refer to site drainage
|
Routing PW Solid Waste | 2/13/2009 | | 2/17/2009 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Street Lights | | | 2/13/2009 | | PASS |
Hank Alarcon
|
|
|
|
Routing PW Sewer Rating | 2/13/2009 | | 2/13/2009 | | PASS |
Louise Waldorf
|
|
|
|
Plan resubmittals received | | | 2/12/2009 | | |
Barbara Stitt
|
|
|
Received 1 cover transmittal, 4 copies of Letter Report-Preliminary Geotechnical Evaluation, 5 copies of sheet 1 (site plan), sheet 2 (section profiles), sheet 3 (section profiles), sheet 1 (Erosion Control plan) and taken to Brian Murphy///2-12-09 @ 2:25pm BAS
|
Routing PW Sewer Design | 2/10/2009 | | 2/12/2009 | | PASS |
Jon R. Gunnerson
|
|
|
Raise all manhole rims to grade, Provide manhole access.
|
Plans ACCEPTED BY PLAN TECH | | | 2/6/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
First Notice | 3/19/2010 | 3/19/2010 | | | |
Jim Storey
|
|
|
|
Application received | | 2/6/2009 | | | |
|
|
|
|
Routing - Addressing | 2/6/2009 | | | | |
Chris Pichardo
|
|
|
|
Routing PW Drainage | 2/6/2009 | | | | FAIL |
Brian Murphy
|
|
|
|
Routing - PLAN CHECK | 3/5/2009 | | | | |
|
|
|
Alex
|