Third Notice | | 3/29/2010 | 4/15/2010 | | DONE |
|
|
|
|
Second Notice | | 3/10/2010 | 3/29/2010 | | DONE |
|
|
|
|
First Notice | | 1/18/2010 | 1/26/2010 | | DONE |
|
|
|
|
FIRE-Final Inspection | 1/13/2010 | 1/13/2010 | 1/13/2010 | P | PASS |
Forrest France
|
|
|
Fire life safety passed, see activity notes completed 1/6/10.
|
Permanent Occupancy | | | 1/8/2010 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 1/5/2010 | 1/6/2010 | 1/6/2010 | A | PASS |
Forrest France
|
|
|
Fire life safety completed satisfactory.
|
BLD-Final | 1/5/2010 | 1/5/2010 | 1/6/2010 | P | PASS |
Jim Storey
|
|
|
final set per angie b.
|
PubWorks Occupancy Approval | 1/6/2010 | 1/6/2010 | 1/6/2010 | | DONE |
Angela Brosious
|
|
|
Ok for final occupancy per Jim Wylie.
|
Zoning Approval | 1/5/2010 | 1/5/2010 | 1/5/2010 | | DONE |
Sarah Schafer
|
|
|
|
FIRE-Final Inspection | 9/15/2009 | 9/16/2009 | 9/17/2009 | A | PART |
Forrest France
|
|
|
TOC approved.
|
FIRE-Alarm Testing | 9/15/2009 | 9/16/2009 | 9/17/2009 | A | PART |
Forrest France
|
|
|
TOC approved.
|
Temporary Occupancy UNPAID FEE | | | 9/17/2009 | | DONE |
|
|
|
|
BLD-Final | 9/16/2009 | 9/16/2009 | 9/16/2009 | P | PART |
Jim Storey
|
|
|
temp occ ok/ need ada sink trap protection instaled.
|
FIRE-Final Inspection | 9/9/2009 | 9/10/2009 | 9/10/2009 | A | PART |
Forrest France
|
|
|
George Phone #: ###-####
|
BLD-Final | 9/9/2009 | 9/10/2009 | 9/10/2009 | A | FAIL |
Jim Storey
|
|
|
George Phone #: ###-#### need ada pipe protection
|
BLD-Final | 8/17/2009 | 8/18/2009 | 8/18/2009 | A | PART |
Jim Storey
|
|
|
George Phone #: ###-#### ada protection at hot water under sink/ ok for final upon ele and fire.
|
BLD-Energy code compliance | 6/19/2009 | 6/22/2009 | 6/22/2009 | A | PART |
Jim Storey
|
|
|
JC-late am please Phone #: ###-#### top off walls still need insulated/ need mech permit and aproval to cover hard lid. ok to gyp walls and lid upon mech aproval.
|
BLD-Framing/Rough-in | 6/19/2009 | 6/19/2009 | 6/19/2009 | P | PART |
Jim Storey
|
|
|
j.c. - little guard house - cover Phone #: ###-####
|
Issue PAID IN FULL permit | | | 4/30/2009 | | DONE |
|
|
|
|
Plan resubmittals received | | | 4/29/2009 | | |
Barbara Stitt
|
|
|
Received 1 cover transmittal and 2 copies of sheet GH-P-500 and inserted into Issue set of plans at the permit desk///4-29-09 @ 3:52pm BAS
|
Plan assigned to (JCM) | 2/17/2009 | 2/17/2009 | 4/21/2009 | | PASS |
John Menard
|
|
|
4/21/2009 11:45:51 JCM - activity updated through activity BLDA022 from case BLD09-00170.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/21/2009 | | DONE |
John Menard
|
|
|
|
Print Occupancy Form | | | 4/21/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Permit Ready to Issue | | | 4/21/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Telephone call | | | 4/21/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
LM for Jim Parker- permit ready, fees given, also need ACHD
|
Routing - PLAN CHECK | 3/11/2009 | | 4/13/2009 | | PASS |
John Menard
|
|
|
|
Plan Reviewer's activity | | | 4/13/2009 | | PASS |
John Menard
|
|
|
Reviewed and approved structural and nonstructural revisions. JCM
|
Plan resubmittals received | | | 4/8/2009 | | |
Tisha Gallop
|
|
|
Received response letter and two copies of sheets GH-T1, GH-T2, GH-A100, GH-P-100, GH-P-500; inserted by LEG and taken back to John Menard
|
Routing - FIRE | 3/6/2009 | 3/6/2009 | 3/11/2009 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Plan resubmittals requested | | | 3/11/2009 | | DONE |
John Menard
|
|
|
Emailed the architect a copy of the plan review requesting revisions. JCM
|
1st review completed | | | 3/11/2009 | | FAIL |
|
|
|
Failed Structural, Plan Check
|
Route to Impact Fee Review | 3/6/2009 | 3/11/2009 | 3/9/2009 | | PASS |
Cindy M. Gould
|
|
|
|
Plan resubmittals requested | | | 3/9/2009 | | DONE |
John Menard
|
|
|
Emailed the applicant a copy of the structural review requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 2/17/2009 | | 3/6/2009 | | FAIL |
John Menard
|
|
|
Received comment list from consulting structural engineer requesting revisions. JCM
|
Routing - PLAN CHECK | 2/27/2009 | | 3/6/2009 | | FAIL |
John Menard
|
|
|
John Menard
|
Routing - PLANNING | 2/26/2009 | | 2/27/2009 | | PASS |
Sarah Schafer
|
|
|
DRH07-00594 Sarah S.
Approved per DRH07-00594 and DRH08-00146.
|
Routing - PLUMBING | 2/24/2009 | | 2/26/2009 | | PASS |
Bill VanDegrift
|
|
|
DCVA required on water service. detail 11 page GH-A100 sha single compartment sink, GH-P-100 shows a EWC-1, verify.
|
Routing - Erosion and Sediment | 2/23/2009 | | 2/24/2009 | | PASS |
Clint A Smith
|
|
|
Please Refer to ESC08-00491.
|
Routing - PUBLIC WORKS | 2/18/2009 | | 2/23/2009 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Environmental | 2/20/2009 | | 2/20/2009 | | PASS |
Walt Baumgartner
|
|
|
reviewed. Bathroom only.
|
Routing PW Solid Waste | | | 2/19/2009 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Street Lights | | | 2/19/2009 | | PASS |
Hank Alarcon
|
|
|
|
Routing PW Sewer Rating | 2/18/2009 | | 2/18/2009 | | PASS |
Louise Waldorf
|
|
|
|
Routing - PLANNING Land Div | 2/17/2009 | | 2/18/2009 | | PASS |
Dave Abo
|
|
|
Parcel B of ROS08-00014.
|
Plans ACCEPTED BY PLAN TECH | | | 2/17/2009 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/17/2009 | | DONE |
Tisha Gallop
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 2/17/2009 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 2/17/2009 | | DONE |
Tisha Gallop
|
|
|
Called Action Couriers for pick up
|
Application received | | 2/12/2009 | 2/12/2009 | | DONE |
Tisha Gallop
|
|
|
|
Routing PW Sewer Design | 2/18/2009 | | 2/18/2008 | | PASS |
Jon R. Gunnerson
|
|
|
Connect onto public sewer provided in Warehouse Way.
|