Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD09-00170
StatusFinaled
Name EPSTEIN CONSTRUCTION INC
Site Address 2390 E FREIGHT ST
Project NameWinco Distribution Center
Customer Number 
ePlanReviewNo
Description
Guard House - To construct a new 325 square foot, one story, masonry and frame guard house and related site improvements. All construction per the approved plans and attached comment list. DRH07-00594 JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 3/29/20104/15/2010 DONE
Second Notice 3/10/20103/29/2010 DONE
First Notice 1/18/20101/26/2010 DONE
FIRE-Final Inspection1/13/20101/13/20101/13/2010PPASS
DetailsForrest France
Fire life safety passed, see activity notes completed 1/6/10.
Permanent Occupancy  1/8/2010 DONE
DetailsBarbara Stitt
BLD-Final1/5/20101/6/20101/6/2010APASS
DetailsForrest France
Fire life safety completed satisfactory.
BLD-Final1/5/20101/5/20101/6/2010PPASS
DetailsJim Storey
final set per angie b.
PubWorks Occupancy Approval1/6/20101/6/20101/6/2010 DONE
DetailsAngela Brosious
Ok for final occupancy per Jim Wylie.
Zoning Approval1/5/20101/5/20101/5/2010 DONE
DetailsSarah Schafer
FIRE-Final Inspection9/15/20099/16/20099/17/2009APART
DetailsForrest France
TOC approved.
FIRE-Alarm Testing9/15/20099/16/20099/17/2009APART
DetailsForrest France
TOC approved.
Temporary Occupancy UNPAID FEE  9/17/2009 DONE
BLD-Final9/16/20099/16/20099/16/2009PPART
DetailsJim Storey
temp occ ok/ need ada sink trap protection instaled.
FIRE-Final Inspection9/9/20099/10/20099/10/2009APART
DetailsForrest France
George Phone #: ###-####
BLD-Final9/9/20099/10/20099/10/2009AFAIL
DetailsJim Storey
George Phone #: ###-#### need ada pipe protection
BLD-Final8/17/20098/18/20098/18/2009APART
DetailsJim Storey
George Phone #: ###-#### ada protection at hot water under sink/ ok for final upon ele and fire.
BLD-Energy code compliance6/19/20096/22/20096/22/2009APART
DetailsJim Storey
JC-late am please Phone #: ###-#### top off walls still need insulated/ need mech permit and aproval to cover hard lid. ok to gyp walls and lid upon mech aproval.
BLD-Framing/Rough-in6/19/20096/19/20096/19/2009PPART
DetailsJim Storey
j.c. - little guard house - cover Phone #: ###-####
Issue PAID IN FULL permit  4/30/2009 DONE
Plan resubmittals received  4/29/2009  
DetailsBarbara Stitt
Received 1 cover transmittal and 2 copies of sheet GH-P-500 and inserted into Issue set of plans at the permit desk///4-29-09 @ 3:52pm BAS
Plan assigned to (JCM)2/17/20092/17/20094/21/2009 PASS
DetailsJohn Menard
4/21/2009 11:45:51 JCM - activity updated through activity BLDA022 from case BLD09-00170.
PLANS/APPL TAKEN TO FRONT DESK  4/21/2009 DONE
DetailsJohn Menard
Print Occupancy Form  4/21/2009 DONE
DetailsAlexandra L. DeYoung
Permit Ready to Issue  4/21/2009 DONE
DetailsAlexandra L. DeYoung
Telephone call  4/21/2009 DONE
DetailsAlexandra L. DeYoung
LM for Jim Parker- permit ready, fees given, also need ACHD
Routing - PLAN CHECK3/11/2009 4/13/2009 PASS
DetailsJohn Menard
Plan Reviewer's activity  4/13/2009 PASS
DetailsJohn Menard
Reviewed and approved structural and nonstructural revisions. JCM
Plan resubmittals received  4/8/2009  
DetailsTisha Gallop
Received response letter and two copies of sheets GH-T1, GH-T2, GH-A100, GH-P-100, GH-P-500; inserted by LEG and taken back to John Menard
Routing - FIRE3/6/20093/6/20093/11/2009 PASS
DetailsScott Arellano
Attached IFC comments to plans
Plan resubmittals requested  3/11/2009 DONE
DetailsJohn Menard
Emailed the architect a copy of the plan review requesting revisions. JCM
1st review completed  3/11/2009 FAIL
Failed Structural, Plan Check
Route to Impact Fee Review3/6/20093/11/20093/9/2009 PASS
DetailsCindy M. Gould
Plan resubmittals requested  3/9/2009 DONE
DetailsJohn Menard
Emailed the applicant a copy of the structural review requesting revisions. JCM
Routing Off Site - STRUCTURAL2/17/2009 3/6/2009 FAIL
DetailsJohn Menard
Received comment list from consulting structural engineer requesting revisions. JCM
Routing - PLAN CHECK2/27/2009 3/6/2009 FAIL
DetailsJohn Menard
John Menard
Routing - PLANNING2/26/2009 2/27/2009 PASS
DetailsSarah Schafer
DRH07-00594 Sarah S.

Approved per DRH07-00594 and DRH08-00146.
Routing - PLUMBING2/24/2009 2/26/2009 PASS
DetailsBill VanDegrift
DCVA required on water service. detail 11 page GH-A100 sha single compartment sink, GH-P-100 shows a EWC-1, verify.
Routing - Erosion and Sediment2/23/2009 2/24/2009 PASS
DetailsClint A Smith
Please Refer to ESC08-00491.
Routing - PUBLIC WORKS2/18/2009 2/23/2009 PASS
DetailsBeverly Hall
Routing PW Environmental2/20/2009 2/20/2009 PASS
DetailsWalt Baumgartner
reviewed. Bathroom only.
Routing PW Solid Waste  2/19/2009 PASS
DetailsPeter J. McCullough
Routing PW Street Lights  2/19/2009 PASS
DetailsHank Alarcon
Routing PW Sewer Rating2/18/2009 2/18/2009 PASS
DetailsLouise Waldorf
Routing - PLANNING Land Div2/17/2009 2/18/2009 PASS
DetailsDave Abo
Parcel B of ROS08-00014.
Plans ACCEPTED BY PLAN TECH  2/17/2009 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  2/17/2009 DONE
DetailsTisha Gallop
Plan routing begun/NEW & ADDTN  2/17/2009 DONE
DetailsTisha Gallop
Telephone call  2/17/2009 DONE
DetailsTisha Gallop
Called Action Couriers for pick up
Application received 2/12/20092/12/2009 DONE
DetailsTisha Gallop
Routing PW Sewer Design2/18/2009 2/18/2008 PASS
DetailsJon R. Gunnerson
Connect onto public sewer provided in Warehouse Way.