Telephone call | | | 11/13/2009 | | DONE |
Tisha Gallop
|
|
|
spoke to Tim Kelly/Elk Run Const. said final project value includes grading phase bld09-00113.
|
Third Notice | | 11/20/2009 | 11/12/2009 | | DONE |
|
|
|
|
Telephone call | | | 11/10/2009 | | DONE |
Tisha Gallop
|
|
|
Someone with Elk Run called and is working on final values, will fax them to me tonight or tomorrow.
|
Third Notice | | 10/25/2009 | 11/6/2009 | | DONE |
|
|
|
faxed, called and mailed
|
Telephone call | | | 11/6/2009 | | DONE |
Tisha Gallop
|
|
|
called and left vm for Tim/Elk Run Const. that need final values for TI and shell of Scott Wright Office. I said ok to combine values if cannot split out and will need mech. broken out into the seperate contractors since more than one.
|
Third Notice | | 9/27/2009 | 10/1/2009 | | DONE |
|
|
|
faxed to Scott Wright/owner and mailed to GC and owner.
|
Telephone call | | | 10/1/2009 | | DONE |
Tisha Gallop
|
|
|
called and left voice message for Tim w/Elk Run Const. to call me back.
|
Telephone call | | | 10/1/2009 | | DONE |
Tisha Gallop
|
|
|
received phone call from Tim (Elk Run Const.) still working on finishing project in conjunction with shell permit Bld09-00174. Expects to be done within the month and will submit final values for both project together. Told him ok, I will review the status of this project with him at the end of October.
|
Second Notice | | 8/31/2009 | 9/17/2009 | | DONE |
|
|
|
|
First Notice | | 8/6/2009 | 8/31/2009 | | DONE |
|
|
|
|
BLD-Final | 8/6/2009 | 8/6/2009 | 8/6/2009 | P | PASS |
Jim Sly
|
|
|
Jim Phone #: ###-#### OK for Perm Occ.
|
Print Occupancy Form | | | 8/6/2009 | | DONE |
|
|
|
|
Permanent Occupancy UNPAID FEE | | | 8/6/2009 | | DONE |
|
|
|
|
BLD-Final | 7/31/2009 | 8/3/2009 | 8/3/2009 | P | NR |
Jim Sly
|
|
|
Jim Phone #: ###-#### Need Plumb Final for Perm Occ
|
BLD-Final | 7/30/2009 | 7/31/2009 | 7/31/2009 | A | PART |
Mike Jordan
|
|
|
Jim Phone #: ###-####. ok for temp occ. Needs to install mirrors in ada restroom and get plumding perm. occ.
|
FIRE-Final Inspection | 7/30/2009 | 7/31/2009 | 7/31/2009 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
PubWorks Occupancy Approval | 7/31/2009 | 7/31/2009 | 7/31/2009 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 7/23/2009 | 7/30/2009 | 7/30/2009 | P | NR |
Tony Young
|
|
|
Jim Phone #: ###-#### need trades 1st,, no inspection made
|
FIRE-Final Inspection | 7/28/2009 | 7/30/2009 | 7/30/2009 | A | FAIL |
Troy Cobbley
|
|
|
Not all of the door hardware has been installed and the vents for the medical gas room have been installed in the interior door instead of the exterior wall as required by code.
|
FIRE-Conference | 7/29/2009 | 7/29/2009 | 7/30/2009 | P | DONE |
Troy Cobbley
|
|
|
I discussed life safety items with the general contractor.
|
FIRE-Final Inspection | 7/23/2009 | 7/28/2009 | 7/28/2009 | A | FAIL |
Forrest France
|
|
|
Missing door hardware at various locations, shell building permit needs called for final, project related fire sprinkler permit must be requested for inspection and finaled prior to tenant life safety approval, noted missing signage and valve locks at the DCVA serving the fire sprinkler piping, discussed fire code review notes and general requirements.
|
BLD-Framing/Rough-in | 7/15/2009 | 7/16/2009 | 7/16/2009 | A | PASS |
Jim Sly
|
|
|
Ceiling grid inspection please-Tim or Jim at ###-#### Phone #: ###-####
|
BLD-Conference | 7/9/2009 | 7/9/2009 | 7/9/2009 | P | DONE |
Jim Sly
|
|
|
Pat Phone #: ###-####
|
BLD-Energy code compliance | 6/11/2009 | 6/11/2009 | 6/11/2009 | P | PASS |
Jim Sly
|
|
|
tim Phone #: ###-#### Frame and energy pass
|
Override - Parcel Holds | 6/11/2009 | 1/1/1900 | 6/11/2009 | | |
|
|
|
no part of the modification
|
CHANGE STATUS TO (ISS) | | | 6/10/2009 | | DONE |
Tisha Gallop
|
|
|
plan modification accepted on 6/4/09 should have been on shell permit Bld09-00174 only. This permit is for interior work on the TI. The plan modification is for the trash enclosure and a parking stall which are included in the scope of work with the shell permit.
|
Routing - PLANNING | 6/8/2009 | | 6/9/2009 | | PASS |
Josh Wilson
|
|
|
Ok per Design Review
|
Plan Modification Accepted | | | 6/4/2009 | | |
John Menard
|
|
|
Plan modification accepted for BLD09-00173 for the relocation of trash enclosure to entrance near MC Millan. Remove current trash enclosure,create new parking stall in previous location. Sheet c-2-01a
|
BLD-Framing/Rough-in | 5/15/2009 | 5/18/2009 | 5/18/2009 | A | PASS |
Jim Sly
|
|
|
Rick Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 5/14/2009 | | DONE |
|
|
|
changed status back to issue per john menard
|
BLD-Framing/Rough-in | 4/28/2009 | 4/29/2009 | 4/29/2009 | A | PART |
Dave Hannah
|
|
|
rick - visual of ceiling Phone #: ###-#### trusses ok ok to hang lid
|
CHANGE STATUS TO (ISS) | | | 4/27/2009 | | DONE |
Tisha Gallop
|
|
|
picked up plan mod
|
Plan assigned to (JCM) | 4/17/2009 | 4/17/2009 | 4/22/2009 | | PASS |
John Menard
|
|
|
4/22/2009 11:59:09 JCM - activity updated through activity BLDA022 from case BLD09-00173.
|
Routing - PLAN CHECK | 4/17/2009 | | 4/22/2009 | | PASS |
John Menard
|
|
|
|
Plan Reviewer's activity | | | 4/22/2009 | | PASS |
John Menard
|
|
|
Reviewed and approved plan modification between grid lines #1 & #1.5 and #E & #D to eliminate private restroom and rearrange floor plan in laundry and storage areas. JCM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/22/2009 | | DONE |
John Menard
|
|
|
|
Print Occupancy Form | | | 4/22/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Telephone call | | | 4/22/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
Called Rob- permit ready, no fees
|
Override - Parcel Holds | | | 4/22/2009 | | |
|
|
|
|
Plan Modification Accepted | | | 4/17/2009 | | |
|
|
|
Plan Mod Accepted for BLD09-00173 for the laundry room #119,restroom #117 and storage room # 123.as they have been rearranged per the owners direction. The privet restroom off of the office # 122 has been deleted. sheets that have been revised are A-102,A-103-A-204 and A-G01 . Routed to John Menard.
|
BLD-Other | 4/10/2009 | 4/10/2009 | 4/10/2009 | P | PART |
Jim Sly
|
|
|
Rick- sheer wall Phone #: ###-#### S. & W. walls OK for hold down placement and attachment.
|
Telephone call | | | 3/19/2009 | | DONE |
|
|
|
t/c - permit ready and fees given
|
Permit Ready to Issue | | | 3/19/2009 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/19/2009 | | DONE |
Tisha Gallop
|
|
|
|
Print Occupancy Form | | | 3/18/2009 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/13/2009 | | 3/17/2009 | | PASS |
John Menard
|
|
|
|
Plan resubmittals received | | | 3/17/2009 | | |
Tisha Gallop
|
|
|
Received transmittal, response letter and three copies of pages G-102, A-102, A-204; inserted by arch. rep. and taken back to John Menard
|
Plan Reviewer's activity | | | 3/17/2009 | | PASS |
John Menard
|
|
|
Reviewed and approved nonstructural revisions. JCM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/17/2009 | | DONE |
John Menard
|
|
|
|
Plan assigned to (JCM) | 2/13/2009 | | 3/17/2009 | | PASS |
John Menard
|
|
|
3/17/2009 16:30:30 JCM - activity updated through activity BLDA022 from case BLD09-00173.
|
Plan resubmittals requested | | | 3/16/2009 | | DONE |
John Menard
|
|
|
Emailed the architect requesting additional revisions. JCM
|
Routing - PLUMBING | 3/11/2009 | | 3/13/2009 | | PASS |
Bill VanDegrift
|
|
|
per United Water: An R.P. will be required on the water supply to the dental office, install an 1 1/4" R.P. over the mop sink.
|
Routing - PLAN CHECK | 3/10/2009 | | 3/11/2009 | | |
John Menard
|
|
|
|
Plan resubmittals received | | | 3/11/2009 | | |
Tisha Gallop
|
|
|
Received transmittal, response letter form architect, response from engineer, three copies of structural calculations and pages A-101, S-101, G-002, A-102, A-103, A-203, A-204, A-301, A-601, S-102, P-200; inserted by arch rep. and taken back to John Menard
|
Routing - FIRE | 3/4/2009 | 3/4/2009 | 3/10/2009 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 3/10/2009 | | FAIL |
|
|
|
Failed Plumbing, Planning, Plan Check
|
Route to Impact Fee Review | 3/4/2009 | 3/9/2009 | 3/5/2009 | | PASS |
Cindy M. Gould
|
|
|
Tenant improvement no fees
|
Plan resubmittals requested | | | 3/4/2009 | | DONE |
John Menard
|
|
|
Emailed the architect a copy of the plan review requesting revisions. JCM
|
Routing - PLAN CHECK | 2/25/2009 | | 3/4/2009 | | FAIL |
John Menard
|
|
|
|
Routing - PLUMBING | 2/25/2009 | | 2/25/2009 | | FAIL |
Bill VanDegrift
|
|
|
see bld09-00174 for review comments
|
Routing - PLANNING | 2/25/2009 | | 2/25/2009 | | PASS |
Josh Wilson
|
|
|
|
Routing - PUBLIC WORKS | 2/20/2009 | | 2/20/2009 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Sewer Rating | 2/19/2009 | | 2/19/2009 | | PASS |
Louise Waldorf
|
|
|
|
Routing PW Environmental | 2/19/2009 | | 2/19/2009 | | PASS |
Walt Baumgartner
|
|
|
Dental Office - subject to Dental BMP requirements
|
Plans ACCEPTED BY PLAN TECH | | | 2/13/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/13/2009 | | |
Alexandra L. DeYoung
|
|
|
|
Pending Assignment by JCM | 2/13/2009 | | 2/13/2009 | | BLDA |
John Menard
|
|
|
2/13/2009 10:02:54 JCM - activity updated through activity BLDA166 from case BLD09-00173.
|
Application received | | 2/12/2009 | | | |
|
|
|
|
Routing PW Solid Waste | 6/4/2009 | | | | |
Peter J. McCullough
|
|
|
Plan modifications moving trash container.
|
Routing - PLAN CHECK | 6/9/2009 | | | | |
|
|
|
|