Telephone call | | | 11/13/2009 | | DONE |
Tisha Gallop
|
|
|
spoke to Tim Kelly/Elk Run Const. said final project value includes grading phase bld09-00113.
|
Third Notice | | 11/20/2009 | 11/12/2009 | | DONE |
|
|
|
|
Third Notice | | 10/8/2009 | 11/6/2009 | | DONE |
|
|
|
faxed, called and mailed
|
Telephone call | | | 11/6/2009 | | DONE |
Tisha Gallop
|
|
|
called and left vm for Tim/Elk Run Const. that need final values for TI and shell of Scott Wright Office. I said ok to combine values if cannot split out and will need mech. broken out into the seperate contractors since more than one.
|
Telephone call | | | 10/1/2009 | | DONE |
Tisha Gallop
|
|
|
received phone call from Tim (Elk Run Const.) still working on finishing project in conjunction with TI permit Bld09-00173. Expects to be done within the month and will submit final values for both project together. Told him ok, I will review the status of this project with him at the end of October.
|
Second Notice | | 9/27/2009 | 9/28/2009 | | DONE |
|
|
|
|
First Notice | | 9/3/2009 | 9/17/2009 | | DONE |
|
|
|
|
BLD-Final | 8/6/2009 | 8/6/2009 | 8/6/2009 | P | PASS |
Jim Sly
|
|
|
Jim Phone #: ###-#### C/C issued.
|
DOC - Permit Finaled | 8/6/2009 | 8/6/2009 | 8/6/2009 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 7/31/2009 | 8/3/2009 | 8/3/2009 | P | NR |
Jim Sly
|
|
|
Jim Phone #: ###-#### Need final affidait letter and all PSI test results on concrete for review.
|
BLD-Final | 7/31/2009 | 7/31/2009 | 7/31/2009 | A | NR |
Mike Jordan
|
|
|
Needs to provide final letter from special insp. agency. Noted all required sign offs ok. Final insp. ok.
|
FIRE-Final Inspection | 7/30/2009 | 7/31/2009 | 7/31/2009 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
PubWorks Occupancy Approval | 7/31/2009 | 7/31/2009 | 7/31/2009 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Final Inspection | 7/29/2009 | 7/30/2009 | 7/30/2009 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 7/29/2009 | 7/30/2009 | 7/30/2009 | A | NR |
Mike Jordan
|
|
|
Jim Phone #: ###-####. Needs zoning and public works finals.
|
Zoning Approval | 7/30/2009 | 7/30/2009 | 7/30/2009 | | PASS |
Josh Wilson
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/29/2009 | | DONE |
|
|
|
|
(F) Reprint permit | | | 7/29/2009 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 6/10/2009 | | 6/11/2009 | | PASS |
Beverly Hall
|
|
|
|
Routing - PLAN CHECK | 6/11/2009 | | 6/11/2009 | | PASS |
John Menard
|
|
|
Plan modification to relocate the existing trash enclosure. JCM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/11/2009 | | DONE |
John Menard
|
|
|
|
Permit Ready to Issue | | | 6/11/2009 | | DONE |
Tisha Gallop
|
|
|
plan modification ready
|
Telephone call | | | 6/11/2009 | | DONE |
Tisha Gallop
|
|
|
called Lane Ward w/ the Land Group and told him plan mod ready and fees
|
Plan assigned to (JCM) | 6/4/2009 | | 6/11/2009 | | PASS |
John Menard
|
|
|
6/11/2009 10:07:43 JCM - activity updated through activity BLDA022 from case BLD09-00174.
|
Routing PW Solid Waste | 6/10/2009 | | 6/10/2009 | | PASS |
Peter J. McCullough
|
|
|
|
Plan resubmittals received | | | 6/10/2009 | | |
Tisha Gallop
|
|
|
Received two copies of sheet C-2.01a; inserted into plans by permit tech and taken back to John Menard
|
Routing - PLANNING | 6/8/2009 | | 6/9/2009 | | PASS |
Josh Wilson
|
|
|
Ok per Design Review
|
Routing - PUBLIC WORKS | 6/4/2009 | | 6/8/2009 | | FAIL |
Connie Baumgartner
|
|
|
|
Routing PW Solid Waste | 6/8/2009 | | 6/8/2009 | | FAIL |
Peter J. McCullough
|
|
|
Waiting for resubmittal of enclosure showing 120 degree opening of doors. Spoke to Arch, will re-submitt.
|
Routing - PLAN CHECK | 6/4/2009 | | 6/4/2009 | | |
John Menard
|
|
|
|
Plan Modification Accepted | | | 6/4/2009 | | |
John Menard
|
|
|
Plan modification accepted for Bld09-00174 (Scott Wright Office Building phase II, shell permit) for the relocation of trash enclosure to entrance near McMillan. Remove current tras enclosure, create new parking sall in previous location. Sheet C-2.01a; routed to John Menard
|
CHANGE STATUS TO (ISS) | | | 5/29/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
(F) Reprint permit | | | 5/29/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
BLD-Framing/Rough-in | 5/15/2009 | 5/18/2009 | 5/18/2009 | A | PASS |
Jim Sly
|
|
|
Rick Phone #: ###-####
|
Routing - PLAN CHECK | 5/13/2009 | | 5/14/2009 | | PASS |
John Menard
|
|
|
Plan modification to relocate accessible parking spaces. JCM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/14/2009 | | DONE |
John Menard
|
|
|
|
Telephone call | | | 5/14/2009 | | DONE |
|
|
|
left vm for rob thorton at ###-#### - permit (plan mod) ready and fees given
|
Permit Ready to Issue | | | 5/14/2009 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 5/13/2009 | | 5/14/2009 | | PASS |
John Menard
|
|
|
5/14/2009 08:44:26 JCM - activity updated through activity BLDA022 from case BLD09-00174.
|
Plan Reviewer's activity | | | 5/13/2009 | | PASS |
John Menard
|
|
|
Reviewed and approved plan modification to relocate the two accessible parking spaces closer to the building entrances. JCM
|
Routing - PLANNING | 5/13/2009 | | 5/13/2009 | | PASS |
Josh Wilson
|
|
|
Relocate proposed tree on the east side of building to the south to accomodate parking
|
Routing - PLAN CHECK | 5/13/2009 | | 5/13/2009 | | PASS |
John Menard
|
|
|
|
Plan Modification Accepted | | | 5/13/2009 | | DONE |
John Menard
|
|
|
Plan modification accepted to relocate the ADA stalls from south parking area to locations closer to the front entrance. 3 copies of sheet C-2.01 recieved and taken to John Menard's desk///5-13-09 @ 9:15am BAS
|
BLD-Framing/Rough-in | 4/28/2009 | 4/29/2009 | 4/29/2009 | A | PART |
Dave Hannah
|
|
|
rick - visual of ceiling Phone #: ###-#### trusses ok ok to hang lid
|
BLD-Other | 4/10/2009 | 4/10/2009 | 4/10/2009 | P | PART |
Jim Sly
|
|
|
Rick- sheer wall Phone #: ###-#### S. and W. walls OK for hold down placement and attachment.
|
BLD-Conference | 3/26/2009 | 3/26/2009 | 3/27/2009 | P | CANC |
Jim Sly
|
|
|
|
BLD-Other | 3/24/2009 | 3/24/2009 | 3/24/2009 | P | PASS |
Jim Sly
|
|
|
Rick- stem wall Phone #: ###-####......OK
|
BLD-Footing | 3/19/2009 | 3/20/2009 | 3/20/2009 | A | PASS |
Jim Sly
|
|
|
rick Phone #: ###-#### Design 2500 PSI no special insp. req.
|
Telephone call | | | 3/19/2009 | | DONE |
|
|
|
t/c - permit ready and fees given - also need ACHD receipt
|
Permit Ready to Issue | | | 3/19/2009 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/19/2009 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 3/18/2009 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/13/2009 | | 3/17/2009 | | PASS |
John Menard
|
|
|
|
Plan resubmittals received | | | 3/17/2009 | | |
Tisha Gallop
|
|
|
Received transmittal, response letter and three copies of pages G-102, A-102, A-204; inserted by arch. rep. and taken back to John Menard
|
Plan Reviewer's activity | | | 3/17/2009 | | PASS |
John Menard
|
|
|
Reviewed and approved nonstructural revisions. JCM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/17/2009 | | DONE |
John Menard
|
|
|
|
Plan assigned to (JCM) | 2/13/2009 | | 3/17/2009 | | PASS |
John Menard
|
|
|
3/17/2009 16:31:41 JCM - activity updated through activity BLDA022 from case BLD09-00174.
|
Plan Reviewer's activity | | | 3/16/2009 | | PASS |
John Menard
|
|
|
Reviewed and approved structural revisions. JCM
|
Plan resubmittals requested | | | 3/16/2009 | | DONE |
John Menard
|
|
|
Emailed the architect requesting additional revisions. JCM
|
Routing - PLUMBING | 3/13/2009 | | 3/13/2009 | | PASS |
Bill VanDegrift
|
|
|
see bld09-00173 for review comments.
|
Plan resubmittals received | | | 3/11/2009 | | |
Tisha Gallop
|
|
|
Received transmittal, response letter form architect, response from engineer, three copies of structural calculations and pages A-101, S-101, G-002, A-102, A-103, A-203, A-204, A-301, A-601, S-102, P-200; inserted by arch rep. and taken back to John Menard
|
Routing - FIRE | 3/4/2009 | 3/4/2009 | 3/9/2009 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 3/9/2009 | | FAIL |
|
|
|
Failed Structural, Plumbing, Planning, Plan Check
|
Route to Impact Fee Review | 3/4/2009 | 3/9/2009 | 3/5/2009 | | PASS |
Cindy M. Gould
|
|
|
|
Plan resubmittals requested | | | 3/4/2009 | | DONE |
John Menard
|
|
|
Emailed the architect a copy of the plan review requesting revisions. JCM
|
Routing - PLAN CHECK | 2/25/2009 | | 3/4/2009 | | FAIL |
John Menard
|
|
|
|
Routing - PLUMBING | 2/20/2009 | | 2/25/2009 | | FAIL |
Bill VanDegrift
|
|
|
page A-102- work station in lab seems to be requireing a dental air ball valve. provide the use and any chemicals associated with the lab sinks P-13, P-14 and the sterilization sink P-15 for cross connection control determination.
|
Routing - PLANNING | 2/25/2009 | | 2/25/2009 | | PASS |
Josh Wilson
|
|
|
Josh Wilson- OK per DRH08-00324
|
Plan resubmittals requested | | | 2/24/2009 | | DONE |
John Menard
|
|
|
Emailed the architect a copy of the structural review requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 2/13/2009 | | 2/23/2009 | | FAIL |
John Menard
|
|
|
Sent to outside review - Received comment list from consulting structural engineer requesting revisions. JCM
|
Routing - PUBLIC WORKS | 2/17/2009 | | 2/20/2009 | | PASS |
Beverly Hall
|
|
|
|
Routing - Erosion and Sediment | 2/20/2009 | | 2/20/2009 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions. ESC09-00052
|
Routing PW Sewer Rating | 2/20/2009 | | 2/20/2009 | | PASS |
Louise Waldorf
|
|
|
|
Routing PW Drainage | 2/19/2009 | | 2/19/2009 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Solid Waste | | | 2/19/2009 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Sewer Design | 2/17/2009 | | 2/18/2009 | | PASS |
Jon R. Gunnerson
|
|
|
Connect onto existing sanitary sewer service provided.
|
Routing PW Street Lights | | | 2/18/2009 | | PASS |
Hank Alarcon
|
|
|
|
Routing - PLANNING Land Div | 2/13/2009 | | 2/17/2009 | | PASS |
Todd Tucker
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/13/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Pending Assignment by JCM | 2/13/2009 | | 2/13/2009 | | BLDA |
John Menard
|
|
|
2/13/2009 10:05:54 JCM - activity updated through activity BLDA166 from case BLD09-00174.
|
Plans ACCEPTED BY PLAN TECH | | | 2/13/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/13/2009 | | |
Alexandra L. DeYoung
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/13/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 2/13/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
First Notice | 8/6/2009 | 8/6/2009 | | | DONE |
Jim Sly
|
|
|
sent by mail 9-3-09
|
Application received | | 2/12/2009 | | | |
|
|
|
|